<strong>Clark</strong> Development Corporation<br />

<strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, <strong>Philippines</strong><br />

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID<br />

The <strong>Clark</strong> Development Corporation, through its Bids and Awards Committee (BAC), invites suppliers/ manufacturers<br />

to apply for eligibility and to bid for <strong>the</strong> hereunder project:<br />

Name <strong>of</strong> Project: ASPHALT OVERLAY OF CDC ROADS<br />

Location: <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, <strong>Philippines</strong><br />

Brief Description : Asphalt Overlay <strong>of</strong> Cardinal Santos St., Constaine St, Teodoro St., Leonor Rivera St., A. Soriano<br />

St., C.M. Recto Avenue near L & T Parking Area, S. Osmena Sr. St., and portion <strong>of</strong> Cardinal<br />

Santos and Bayanihan St. with a total combined length <strong>of</strong> 2,651.85 linear meters.<br />

Approved Budget<br />

For <strong>the</strong> Contract : Php 9,471,000.00 (VAT Exclusive)<br />

Contract Duration : 8 calendar days<br />

Prospective bidders should have experience in undertaking a similar completed project with an amount <strong>of</strong> at least<br />

50% <strong>of</strong> <strong>the</strong> proposed project for bidding and with existing Asphalt Plant within Region III including National Capital<br />

Region (NCR). The Eligibility Check/Screening as well as <strong>the</strong> Preliminary Examination <strong>of</strong> Bids shall use nondiscretionary<br />

“pass/fail” criteria. Post-qualification <strong>of</strong> <strong>the</strong> lowest calculated bid shall be conducted.<br />

All particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-Bidding<br />

Conference(s), Evaluation <strong>of</strong> Bids, Post-Qualification and Award <strong>of</strong> Contract shall be governed by <strong>the</strong> pertinent<br />

provisions <strong>of</strong> R.A. 9184 and its Implementing Rules and Regulation (IRR).<br />

The complete schedule <strong>of</strong> activities is listed, as follows:<br />

Activities<br />

Schedule<br />

1. Issuance <strong>of</strong> Bidding Documents May 19-25, 2008 (9am-4pm)<br />

2. Pre-bid Conference<br />

May 26, 2008 (2:00 p.m.)<br />

OTS Conference Room, Bldg 2125<br />

3. Submission and Opening <strong>of</strong> Bids June 10, 2008 (2:00 p.m.)<br />

OTS Conference Room, Bldg 2125<br />

Bid Documents will be available to prospective bidders upon payment <strong>of</strong> a non-refundable amount <strong>of</strong> Php 10,000.00<br />

to <strong>the</strong> CDC- Cashier (cash or manager’s checks only) from May 19-25, 2008 at <strong>the</strong> address given below:<br />

Bids and Awards Secretariat<br />

<strong>Clark</strong> Development Corporation<br />

3 rd Floor Bldg. 2127 E. Quirino Avenue,<br />

CDC Corporate Center, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong><br />

<strong>Philippines</strong><br />

Tel.Nos. (045)599-9000 local 821<br />

E-mail: bacsecretariat@clark.com.ph<br />

Website: www.clark.com.ph<br />

CDC assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in <strong>the</strong><br />

preparation <strong>of</strong> <strong>the</strong> bid. CDC reserves <strong>the</strong> right to accept or reject any bid, and to annul <strong>the</strong> bidding process and<br />

reject all bids at any time prior to contract award, without <strong>the</strong>reby incurring any liability to <strong>the</strong> affected bidder or<br />

bidders.<br />

Approved by:<br />

PEPITO M. GALANG (sgd.)<br />

BAC Chairman<br />

<strong>Clark</strong> Development Corporation<br />

66<br />

Section VII Technical Specifications<br />

Asphalt Overlay <strong>of</strong> CDC Roads


Section VII. Technical Specifications<br />

<strong>Clark</strong> Development Corporation<br />

67<br />

Section VII Technical Specifications<br />

Asphalt Overlay <strong>of</strong> CDC Roads


Technical Specifications and Scope <strong>of</strong><br />

Works<br />

Bidders must state here ei<strong>the</strong>r “Comply” or “Not Comply” against each <strong>of</strong> <strong>the</strong> individual parameters <strong>of</strong> each<br />

Specification stating <strong>the</strong> corresponding performance parameter <strong>of</strong> <strong>the</strong> equipment <strong>of</strong>fered. Statements <strong>of</strong><br />

“Comply” or “Not Comply” must be supported by evidence in a Bidders Bid and cross-referenced to that<br />

evidence. Evidence shall be in <strong>the</strong> form <strong>of</strong> manufacturer’s un-amended sales literature, unconditional<br />

statements <strong>of</strong> specification and compliance issued by <strong>the</strong> manufacturer, samples, independent test data etc.,<br />

as appropriate. A statement that is not supported by evidence or is subsequently found to be contradicted by<br />

<strong>the</strong> evidence presented will render <strong>the</strong> Bid under evaluation liable for rejection. A statement ei<strong>the</strong>r in <strong>the</strong><br />

Bidders statement <strong>of</strong> compliance or <strong>the</strong> supporting evidence that is found to be false ei<strong>the</strong>r during Bid<br />

evaluation, post-qualification or <strong>the</strong> execution <strong>of</strong> <strong>the</strong> Contract may be regarded as fraudulent and render <strong>the</strong><br />

Bidder or supplier liable for prosecution subject to <strong>the</strong> provisions <strong>of</strong> ITB Clause 3.1.(a.2.) and/or GCC<br />

Clause2.1.(a.2).<br />

Item<br />

Technical Specification<br />

Statement <strong>of</strong><br />

Compliance<br />

1 Bituminous Tack Coat (SS-1) per DPWH Standard Specification Volume II, 2004<br />

Edition item 302.<br />

2 Bituminous Concrete Surface Course, Hot Laid (Wearing Course) per DPWH<br />

Standard Specification Volume II, 2004 Edition item 310.<br />

Scope <strong>of</strong> Work<br />

1. This project must be fully carried out in accordance to Standard Specification <strong>of</strong> DPWH Volume II, 2004<br />

edition. The construction procedures includes <strong>the</strong> removal <strong>of</strong> all foreign loose objects on <strong>the</strong> finished<br />

surface <strong>of</strong> <strong>the</strong> existing deteriorated asphalt pavement, Spraying <strong>of</strong> Bituminous Tack Coat (SS-1) and Laying<br />

<strong>of</strong> Bituminous Concrete Surface Course, Hot-laid material both in FDLRC basis.<br />

2. Before mobilization activity commences, <strong>the</strong> supplier must coordinate properly to CDC-ECMD<br />

Representative for proper implementation. Temporary warning barricades and safety signs must be<br />

installed during blowing <strong>of</strong> foreign loose objects, spraying <strong>of</strong> SS-1 and laying <strong>of</strong> Bituminous Concrete<br />

Surface Course Hot-laid.<br />

3. All foreign loose objects on <strong>the</strong> surface <strong>of</strong> existing deteriorated asphalt pavement shall be removed using<br />

air compressor prior to spraying <strong>of</strong> Bituminous Tack (SS-1).<br />

4. When Bituminous Tack Coat has been applied, <strong>the</strong> application <strong>of</strong> Bituminous Concrete Surface Course, Hotlaid<br />

material shall follow.<br />

5. Laying <strong>of</strong> Bituminous Concrete Surface Course, Hot-laid material shall maintain a temperature <strong>of</strong> not less<br />

than 107ºC (225ºF).<br />

6. The asphalt concrete shall be laid continuously as possible. However, if stoppage occurs, joints must be<br />

brushed coat with emulsified asphalt. When necessary, this sticky substance shall be used to meet <strong>the</strong> field<br />

condition.<br />

7. Upon completion <strong>of</strong> laying <strong>of</strong> Bituminous Concrete Surface Course material, <strong>the</strong> layer must be compacted<br />

using tandem roller and pneumatic tire roller with a 0.05m thick asphalt finished. Rolling shall begin at <strong>the</strong><br />

sides and proceeds longitudinally parallel toward <strong>the</strong> road centerline. The supplier must be aware that only


appropriate equipment shall be used for compaction. Crushing <strong>of</strong> aggregate due to excessive compaction<br />

is not permitted.<br />

8. When compaction is completed, <strong>the</strong> asphalt pavement must be core tested at <strong>the</strong> supplier’s account for<br />

compaction and thickness determination in compliance with <strong>the</strong> design and in accordance with DPWH<br />

Standards and must be approved by CDC Material Engineer.<br />

9. Demobilization shall follow after <strong>the</strong> completion <strong>of</strong> compaction <strong>of</strong> newly applied asphalt pavement.<br />

10. Pavement marking shall be done by CDC-ECMD RGM crew when paving is completed.