BILL OF QUANTITIES

BILL OF QUANTITIES BILL OF QUANTITIES

12.04.2015 Views

DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT - PHASE 3B ITEM DESCRIPTION QTY UNIT UNIT COST AMOUNT A21 Switchyard Lighting System (Bay and Perimeter) 1 lot complete with the required fixtures, posts, conduits, wires, magnetic contactor and photo cell, conduit fittings, conductors foundations, etc in accordance to the requirements of the Technical Data Sheet (TDS) A22 Substation Control System a. Microprocessor Based Substation Control System 1 sets (New back up set ) to include the integration of new and existing to accommodate all system (six bays). To include licensed copy of software (latest Version) and industrial type equipment for the Protection, control and monitoring of equipment for connection to SCADA, gateway, HMI and Work station. To include the integration, data base reconfiguration, parameterization of the existing and new MBSC system with BCU, and others to conform to the new set up of Clark S/S. To provide CDC with copy of license software in DVD or CD in accordance to the requirements of the Technical Data Sheet (TDS). b. Closed Circuit Television System (New set of 1 sets CCTV) new system for bays 3,4, 5, 6 and perimeter fence complete with all the required peripherals, industrial computer, accessories, wires and cable reconfiguration and integration with existing CCTV system. To include the supply and replacement of existing CCTV controller and reconfiguration. (No of PTZ dome camera arm mounted at gantry = six(6), Pole mounted Motorized pan tilt camera = two(2), CCtv player recorder controller = (2), Working station with 21 inch Monitor= two (2) and licensed software with CD or DVD in accordance to the requirements of the Technical Data Sheet (TDS). A23 c. Access Control and Alarm Monitoring System 1 lot (ACAMS) revision / expansion/ integration of system to include new warehouse and relocation of existing affected by control building renovation d. Main Control Switchboard, with all instrument, 1 lot meters, indicators, control switches, annunciators, push buttons, LED indicating lamps, terminal blocks, wiring and miscellaneous auxiliary and accessory devices Substation Protection System a. Transformer Protection ( Main 1) complete with 2 sets the required protective relays and accessories in one (1) panel. Different manufacturer from Main 2 in accordance to the requirements of the Technical Data Sheet (TDS) b. Transformer Protection ( Main 2) complete with 2 sets the required protective relays and accessories in one (1) panel, Different manufacturer from Main 1 in accordance to the requirements of the Technical Data Sheet (TDS) Page 4 of 15

DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT - PHASE 3B ITEM DESCRIPTION QTY UNIT UNIT COST AMOUNT c. Breaker Failure Protection System 1 sets Complete with the required protective relays and accessories for four (4) 230 kV Power Circuit Breakers in one panel in accordance to the requirements of the Technical Data Sheet (TDS). d. 230 kV Bus Protection System, Main 1 - complete 1 sets with accessories for connection of new breaker 8- 03CB24CLA and 8-04CB24CLA at Bus 8- BS03CLA to existing GE B30-8BS03CLA in accordance to the requirements of the Technical Data Sheet (TDS) e. 230 kV Bus Protection System, Main 1 - complete 1 sets with accessories for connection of new breaker 8- 03CB08CLA and 8-04CB08CLA at Bus 8 - BS04CLA to existing GE B30-8BS04CLA in accordance to the requirements of the Technical Data Sheet (TDS) d. 230 kV Bus Protection System, (Main 2) complete 2 sets with the required protective relays and accessories for the integration of five (5) 230 kV Power Circuit Breakers (Bus Tie, Bay 3,4,5 and 6 Breakers) in accordance to the requirements of the Technical Data Sheet (TDS) f. 69 kV Feeder Protection System, complete with the required protective relays and accessories for the following outgoing 69 kV feeders in accordance to the requirements of the Technical Data Sheet (TDS) f.1 Three (3) 69 kV breakers with two (2) 69 kV 1 sets outgoing feeders in one (1) panel f.2 Three (3) 69 kV breakers with two (2) 69 kV 1 sets outgoing feeders in one (1) panel g. Bay Control Unit with provision for integration to 2 sets existing and new Microprocessor Based Substation Control system complete with necessary accessories in accordance to the requirements of the Technical Data Sheet (TDS) Bay 83 and Bay 84 at Clark 230 kV S/S A24 Line Protection System a. Line Protection for 230 kV system (Main 1 - 2 sets Distance Relay) complete with the required protective relays and accessories in accordance to the requirements of the Technical Data Sheet (TDS). b. Line Protection for 230 kV system (Main 2 - Line 2 sets Differential Relay) complete with the required protective relays and accessories in accordance to the requirements of the Technical Data Sheet (TDS). A25 Capacitive Voltage Transformer 230 kV, complete with 6 units the required accessories and support structure in accordance to the requirements of the Technical Data Sheet (TDS). Page 5 of 15

DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

c. Breaker Failure Protection System<br />

1 sets<br />

Complete with the required protective relays and<br />

accessories for four (4) 230 kV Power Circuit<br />

Breakers in one panel in accordance to the<br />

requirements of the Technical Data Sheet (TDS).<br />

d. 230 kV Bus Protection System, Main 1 - complete 1 sets<br />

with accessories for connection of new breaker 8-<br />

03CB24CLA and 8-04CB24CLA at Bus 8-<br />

BS03CLA to existing GE B30-8BS03CLA in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

e. 230 kV Bus Protection System, Main 1 - complete 1 sets<br />

with accessories for connection of new breaker 8-<br />

03CB08CLA and 8-04CB08CLA at Bus 8 -<br />

BS04CLA to existing GE B30-8BS04CLA in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

d. 230 kV Bus Protection System, (Main 2) complete 2 sets<br />

with the required protective relays and accessories<br />

for the integration of five (5) 230 kV Power Circuit<br />

Breakers (Bus Tie, Bay 3,4,5 and 6 Breakers) in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

f. 69 kV Feeder Protection System, complete with<br />

the required protective relays and accessories for<br />

the following outgoing 69 kV feeders in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

f.1 Three (3) 69 kV breakers with two (2) 69 kV 1 sets<br />

outgoing feeders in one (1) panel<br />

f.2 Three (3) 69 kV breakers with two (2) 69 kV 1 sets<br />

outgoing feeders in one (1) panel<br />

g. Bay Control Unit with provision for integration to 2 sets<br />

existing and new Microprocessor Based<br />

Substation Control system complete with<br />

necessary accessories in accordance to the<br />

requirements of the Technical Data Sheet (TDS)<br />

Bay 83 and Bay 84 at Clark 230 kV S/S<br />

A24 Line Protection System<br />

a. Line Protection for 230 kV system (Main 1 -<br />

2 sets<br />

Distance Relay) complete with the required<br />

protective relays and accessories in accordance to<br />

the requirements of the Technical Data Sheet<br />

(TDS).<br />

b. Line Protection for 230 kV system (Main 2 - Line 2 sets<br />

Differential Relay) complete with the required<br />

protective relays and accessories in accordance to<br />

the requirements of the Technical Data Sheet<br />

(TDS).<br />

A25 Capacitive Voltage Transformer 230 kV, complete with 6 units<br />

the required accessories and support structure in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

Page 5 of 15