DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

A21 Switchyard Lighting System (Bay and Perimeter) 1 lot<br />

complete with the required fixtures, posts, conduits,<br />

wires, magnetic contactor and photo cell, conduit<br />

fittings, conductors foundations, etc in accordance to the<br />

requirements of the Technical Data Sheet (TDS)<br />

A22 Substation Control System<br />

a. Microprocessor Based Substation Control System 1 sets<br />

(New back up set ) to include the integration of<br />

new and existing to accommodate all system (six<br />

bays). To include licensed copy of software (latest<br />

Version) and industrial type equipment for the<br />

Protection, control and monitoring of equipment for<br />

connection to SCADA, gateway, HMI and Work<br />

station. To include the integration, data base<br />

reconfiguration, parameterization of the existing<br />

and new MBSC system with BCU, and others to<br />

conform to the new set up of Clark S/S. To provide<br />

CDC with copy of license software in DVD or CD<br />

in accordance to the requirements of the<br />

Technical Data Sheet (TDS).<br />

b. Closed Circuit Television System (New set of<br />

1 sets<br />

CCTV) new system for bays 3,4, 5, 6 and<br />

perimeter fence complete with all the required<br />

peripherals, industrial computer, accessories,<br />

wires and cable reconfiguration and integration<br />

with existing CCTV system. To include the supply<br />

and replacement of existing CCTV controller and<br />

reconfiguration. (No of PTZ dome camera arm<br />

mounted at gantry = six(6), Pole mounted<br />

Motorized pan tilt camera = two(2), CCtv player<br />

recorder controller = (2), Working station with 21<br />

inch Monitor= two (2) and licensed software with<br />

CD or DVD in accordance to the requirements of<br />

the Technical Data Sheet (TDS).<br />

A23<br />

c. Access Control and Alarm Monitoring System<br />

1 lot<br />

(ACAMS) revision / expansion/ integration of<br />

system to include new warehouse and relocation<br />

of existing affected by control building renovation<br />

d. Main Control Switchboard, with all instrument, 1 lot<br />

meters, indicators, control switches, annunciators,<br />

push buttons, LED indicating lamps, terminal<br />

blocks, wiring and miscellaneous auxiliary and<br />

accessory devices<br />

Substation Protection System<br />

a. Transformer Protection ( Main 1) complete with 2 sets<br />

the required protective relays and accessories in<br />

one (1) panel. Different manufacturer from Main 2<br />

in accordance to the requirements of the<br />

Technical Data Sheet (TDS)<br />

b. Transformer Protection ( Main 2) complete with 2 sets<br />

the required protective relays and accessories in<br />

one (1) panel, Different manufacturer from Main 1<br />

in accordance to the requirements of the<br />

Technical Data Sheet (TDS)<br />

Page 4 of 15