DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />
PHASE 3B<br />
ITEM DESCRIPTION<br />
QTY UNIT UNIT COST AMOUNT<br />
A21 Switchyard Lighting System (Bay and Perimeter) 1 lot<br />
complete with the required fixtures, posts, conduits,<br />
wires, magnetic contactor and photo cell, conduit<br />
fittings, conductors foundations, etc in accordance to the<br />
requirements of the Technical Data Sheet (TDS)<br />
A22 Substation Control System<br />
a. Microprocessor Based Substation Control System 1 sets<br />
(New back up set ) to include the integration of<br />
new and existing to accommodate all system (six<br />
bays). To include licensed copy of software (latest<br />
Version) and industrial type equipment for the<br />
Protection, control and monitoring of equipment for<br />
connection to SCADA, gateway, HMI and Work<br />
station. To include the integration, data base<br />
reconfiguration, parameterization of the existing<br />
and new MBSC system with BCU, and others to<br />
conform to the new set up of Clark S/S. To provide<br />
CDC with copy of license software in DVD or CD<br />
in accordance to the requirements of the<br />
Technical Data Sheet (TDS).<br />
b. Closed Circuit Television System (New set of<br />
1 sets<br />
CCTV) new system for bays 3,4, 5, 6 and<br />
perimeter fence complete with all the required<br />
peripherals, industrial computer, accessories,<br />
wires and cable reconfiguration and integration<br />
with existing CCTV system. To include the supply<br />
and replacement of existing CCTV controller and<br />
reconfiguration. (No of PTZ dome camera arm<br />
mounted at gantry = six(6), Pole mounted<br />
Motorized pan tilt camera = two(2), CCtv player<br />
recorder controller = (2), Working station with 21<br />
inch Monitor= two (2) and licensed software with<br />
CD or DVD in accordance to the requirements of<br />
the Technical Data Sheet (TDS).<br />
A23<br />
c. Access Control and Alarm Monitoring System<br />
1 lot<br />
(ACAMS) revision / expansion/ integration of<br />
system to include new warehouse and relocation<br />
of existing affected by control building renovation<br />
d. Main Control Switchboard, with all instrument, 1 lot<br />
meters, indicators, control switches, annunciators,<br />
push buttons, LED indicating lamps, terminal<br />
blocks, wiring and miscellaneous auxiliary and<br />
accessory devices<br />
Substation Protection System<br />
a. Transformer Protection ( Main 1) complete with 2 sets<br />
the required protective relays and accessories in<br />
one (1) panel. Different manufacturer from Main 2<br />
in accordance to the requirements of the<br />
Technical Data Sheet (TDS)<br />
b. Transformer Protection ( Main 2) complete with 2 sets<br />
the required protective relays and accessories in<br />
one (1) panel, Different manufacturer from Main 1<br />
in accordance to the requirements of the<br />
Technical Data Sheet (TDS)<br />