DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

B19 Rehabilitation of Existing Fire Pump, includes<br />

1 unit<br />

cleaning of pumps, testing, electrical system and ready<br />

for operation.<br />

B20 Rehabilitation of Existing Jockey Pump, includes 1 unit<br />

cleaning of pumps, testing, electrical system and ready<br />

for operation.<br />

B21 Brand New Truck Loader Cargo Crane 1 unit<br />

Gross vehicle mass including crane 8,000, Crane<br />

capacity 5,000 kg at 2.4 meters, Maximum lift above<br />

ground 10 Meters, With Hydraulic motors for winch, and<br />

swing, Hydraulic extended Outriggers, Hydraulic pump,<br />

and powered thru PTO. For turn over to CDC-ECMD<br />

SUB-TOTAL FOR ITEM 3B CIVIL WORKS<br />

TOTAL CLARK SUBSTATION 230/69KV<br />

4.0 Metering System (230kV System) 6 sets<br />

Current transformer Multi ratio 2000:5A 0.3 accuracy<br />

class, Burden B-0.1 to 0.9, Voltage transformer 0.3<br />

accuracy, weather proof enclosure for Billing meter for<br />

the electronic billing system in accordance to the<br />

requirements and specification of the power provider<br />

(NGCP/TRANSCO) for T1, T2, T3, T4, T5 and T6.<br />

5.0 GRID IMPACT STUDY, including request and payment 1 lot<br />

for the data, review and approval of NGCP<br />

6.0 OCCUPATIONAL HEALTH AND SAFETY 1 lot<br />

includes personal protective equipment, clinical<br />

materials, signage's and barricades, and the salary and<br />

wages of health and safety personnel.<br />

7.0<br />

Facilities For The Engineer such as temporary field<br />

office, including all necessary electricity, water,<br />

telephone services, office equipment, furniture and<br />

the following for the use of CDC/ECMD Engineers.<br />

For turn over to CDC-ECMD after the completion of<br />

the project<br />

a Field Office (20 ft Container with AC unit)<br />

2 units<br />

b Laptops Intel Core i7-2410 processor, Window 7 4 units<br />

c<br />

pro, MS Office 2007 with external 1TB hard Drive<br />

Desktop Intel i7-550 Processor, Window 7 pro, MS 2 units<br />

office 2007 with external 1TB hard drive<br />

d Licensed AUTOCAD (2010 or latest) softwares 2 units<br />

e Licensed Ms Project (2010 or latest) softwares 2 units<br />

f Service Vehicle Twin Cab Pick up 4 x 4 (3.0 diesel 2 units<br />

engine, common rail direct injection) with fuel,<br />

driver, maintenance, other costs (Toll fee, parking)<br />

for 14 months (lease to own)<br />

g Service Vehicle AUV 4 x 2 (2.5 Diesel engine) with 1 unit<br />

fuel, driver and maintenance, others (Toll, parking<br />

fee) costs for 14 months (lease to own)<br />