<strong>BILL</strong> <strong>OF</strong> <strong>QUANTITIES</strong><br />

DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

1.0 DETAILED ENGINEERING DESIGN<br />

Complete design of Clark - Mexico 230kV Double Circuit 1 lot<br />

Transmission Line, Expansion of Clark and Mexico<br />

230kV Substations, Expansion of Clark Substation<br />

Control House, and the Proposed Clark Substation<br />

Warehouse in accordance with PEC, IEC, ANSI, NESC,<br />

NBC, NSCP and DPWH Design Standards<br />

Compliance to NGCP requirements for the submission of<br />

factory tests, field tests, manuals, procedures and other<br />

documents for NGCP approval. Coordination and other<br />

requirements to energize the system.<br />

Permits, local and national and payments of fees and<br />

other documents as required to complete the project<br />

Compliance to the COA requirements for the submission<br />

of Detailed unit Cost Analysis of Items as listed in the Bill<br />

of Quantities<br />

Provide assistance in the R.O.W acquisition especially in<br />

the consultation/coordination with the Local Government<br />

Units and Barangay Officials having jurisdiction over the<br />

area that will be affected by the R.O.W. of the<br />

transmission line. Assists CDC on the procedure of<br />

payments and registration of property/ROW acquisition in<br />

accordance with R.A. 8974 and other applicable laws.<br />

Detailed Engineering Design Activities as per section 2 of<br />

scope of work<br />

a. Review of existing information<br />

b. Topographic and Parcellary survey<br />

c. Right of way acquisition<br />

d. Soil and material investigation<br />

e. Hydrological and hydraulic studies<br />

f. Environmental impact assessment (EIA)<br />

g. Detailed design plans and specifications<br />

h. Utility relocation plan<br />

i. Detailed estimate / unit price analysis<br />

j. Drawing submittals<br />

k. Reports<br />

Submit three (3) options of possible transmission line<br />

Alignments with cost benefit analysis, evaluation and<br />

recommendation (NLEX, existing 69 kv corridor, new<br />

route)<br />

2.0 230 Kv TRANSMISSION LINE From Clark S/S to Mexico S/S<br />

Construction of Double Circuit (1 x 410 TSAR) on Steel 35 KM<br />

poles or Steel towers, clearance over roadway as per<br />

PEC, IEC, ANSI, NESC, maximum span is 100 meters<br />

on 43 meter steel poles and 250 meters on 52 meters<br />

steel towers in accordance to the requirements of the<br />

Technical Data Sheet (TDS) and compliance to ATO<br />

requirements.<br />

Page 1 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

3.0 CLARK SUBSTATION 230/69kV<br />

A. ELECTRICAL WORKS<br />

Supply, manufacture, factory testing, and furnishing of<br />

labor, equipment, tools and incidental materials for the<br />

delivery, assembly, erection, installation, field testing<br />

commissioning and ready for operation of the following<br />

substation equipment and its associated control and<br />

protection system and accessories<br />

Bay 85 and Bay 86 At Clark 230 kV S/S<br />

A1. Power Transformer 150 MVA Three winding autotransformer<br />

2 sets<br />

type 3-Phase 230/69kV wye-13.8 delta with<br />

neutral earthing resistor class ONAN/ONAF1/ONAF2 ,<br />

complete with all appurtenances, accessories and onload<br />

tap changing mechanism with 16 taps of 0.625%<br />

above and 16 taps of 0.625% below 0 including<br />

paralleling device and control in accordance to the<br />

requirements of the Technical Data Sheet (TDS).<br />

A2. Power Circuit Breaker Dead Tank 230kV, 3-phase, 4 sets<br />

2000A, 40, kA three pole operation, complete with the<br />

required accessories and support structure including<br />

bushing current transformers in accordance to the<br />

requirements of the Technical Data Sheet (TDS).<br />

A3. Power Circuit Breaker Dead Tank 69kV, 3-phase, 6 sets<br />

2000A, 38 kA three pole operation, complete with the<br />

required accessories and bushing current transformer in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

A4. Ganged Disconnect Switch 230kV, 3-phase, 2000A, 10 sets<br />

40KA equipped with 460 vac 3 phase motor and<br />

manually group operated, complete with the required<br />

accessories in accordance to the requirements of the<br />

Technical Data Sheet (TDS).<br />

A5. Ganged Disconnect Switch 69kV, 3-phase, 2000A, 38 4 sets<br />

kA equipped with earthing blades, 230 vac motor and<br />

manually group operated, complete with the required<br />

accessories in accordance to the requirements of the<br />

Technical Data Sheet (TDS).<br />

A6 Ganged Disconnect Switch 69kV, 3-phase, 2000A, 38 14 sets<br />

kA equipped with, 230 vac motor and manually group<br />

operated, complete with the required accessories in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

A7 Voltage Transformer Capacitive type 230 kV, complete 18 sets<br />

with the required accessories and support structure in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

A8 Voltage Transformer 69 kV, complete with the required 30 sets<br />

accessories in accordance to the requirements of the<br />

Technical Data Sheet (TDS).<br />

A9 Surge Arresters 192 kV, station type, complete with 12 sets<br />

support structure and the required accessories in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

Page 2 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

A10. Surge Arresters 60 kV, station type, complete with 24 sets<br />

support structure and the required accessories in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

A11. Substation Gantry and Pedestal Steel Structures 1 lot<br />

including bolts, washer, etc hot dipped galvanized<br />

complete with all the required accessories in accordance<br />

to the requirements of the Technical Data Sheet (TDS)<br />

A12. Metalclad Switchgear, 13.8 kv outdoor type outdoor 2 sets<br />

type complete with arresters, VT, CT, breaker and 150<br />

KVA 13.8/460 vac 3-phase transformer type ONAN<br />

Outdoor type in accordance to the requirements of the<br />

Technical Data Sheet (TDS)<br />

A13 Installation Materials consisting of conductors, 1 lot<br />

insulators, connectors, pole line hardwares, bus<br />

supports, and other accessories in accordance to the<br />

requirements of the Technical Data Sheet (TDS)<br />

A14 Grounding Materials consisting of insulated and bare 1 lot<br />

copper cables, lightning rod, copper rods, fittings.<br />

complete with the required materials for aerial and<br />

grounding mat and to substation equipment and<br />

structures in accordance to the requirements of the<br />

Technical Data Sheet (TDS).<br />

A15. Distribution Board 125 VDC complete with enclosure, 2 sets<br />

main breaker, Automatic transfer switch, tie breaker,<br />

branch breakers, and accessories for installation.<br />

Number of breakers to supply four (4) bays in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS)<br />

A16. Station Service Transformer 50 kva 480/230V, three 2 sets<br />

phase, dry type and accessories in accordance to the<br />

requirements of the Technical Data Sheet (TDS).<br />

A17. Distribution Board 3 Phase 460/230 VAC with 2 sets<br />

enclosure, main breaker, tie breaker, automatic transfer<br />

switch, branch circuit and accessories Number of<br />

circuit breaker to include 4 additional bays, breaker to<br />

panel at bay 3 and 4, and spare breaker in accordance to<br />

the requirements of the Technical Data Sheet (TDS)<br />

A18. Distribution Board 3 Phase 230 VAC with enclosure , 2 sets<br />

main breaker, tie breaker, automatic transfer switch,<br />

branch circuit and accessories Number of circuit<br />

breaker for four (4) bays, breaker for panel at bays 3<br />

and 4 and spare breaker in accordance to the<br />

requirements of the Technical Data Sheet (TDS)<br />

A19 Power Control, Instrumentation and Protection 1 lot<br />

Cables, 35kV, 15 kV and 600 volt insulation complete<br />

with insulated terminal lugs, glands, marking etc. in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS)<br />

A20. Cable Trays (various type) hot dipped galvanized, 1 lot<br />

complete with supports, fittings, and other accessories in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS). Cost of cable tray included at cable<br />

trenches<br />

Page 3 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

A21 Switchyard Lighting System (Bay and Perimeter) 1 lot<br />

complete with the required fixtures, posts, conduits,<br />

wires, magnetic contactor and photo cell, conduit<br />

fittings, conductors foundations, etc in accordance to the<br />

requirements of the Technical Data Sheet (TDS)<br />

A22 Substation Control System<br />

a. Microprocessor Based Substation Control System 1 sets<br />

(New back up set ) to include the integration of<br />

new and existing to accommodate all system (six<br />

bays). To include licensed copy of software (latest<br />

Version) and industrial type equipment for the<br />

Protection, control and monitoring of equipment for<br />

connection to SCADA, gateway, HMI and Work<br />

station. To include the integration, data base<br />

reconfiguration, parameterization of the existing<br />

and new MBSC system with BCU, and others to<br />

conform to the new set up of Clark S/S. To provide<br />

CDC with copy of license software in DVD or CD<br />

in accordance to the requirements of the<br />

Technical Data Sheet (TDS).<br />

b. Closed Circuit Television System (New set of<br />

1 sets<br />

CCTV) new system for bays 3,4, 5, 6 and<br />

perimeter fence complete with all the required<br />

peripherals, industrial computer, accessories,<br />

wires and cable reconfiguration and integration<br />

with existing CCTV system. To include the supply<br />

and replacement of existing CCTV controller and<br />

reconfiguration. (No of PTZ dome camera arm<br />

mounted at gantry = six(6), Pole mounted<br />

Motorized pan tilt camera = two(2), CCtv player<br />

recorder controller = (2), Working station with 21<br />

inch Monitor= two (2) and licensed software with<br />

CD or DVD in accordance to the requirements of<br />

the Technical Data Sheet (TDS).<br />

A23<br />

c. Access Control and Alarm Monitoring System<br />

1 lot<br />

(ACAMS) revision / expansion/ integration of<br />

system to include new warehouse and relocation<br />

of existing affected by control building renovation<br />

d. Main Control Switchboard, with all instrument, 1 lot<br />

meters, indicators, control switches, annunciators,<br />

push buttons, LED indicating lamps, terminal<br />

blocks, wiring and miscellaneous auxiliary and<br />

accessory devices<br />

Substation Protection System<br />

a. Transformer Protection ( Main 1) complete with 2 sets<br />

the required protective relays and accessories in<br />

one (1) panel. Different manufacturer from Main 2<br />

in accordance to the requirements of the<br />

Technical Data Sheet (TDS)<br />

b. Transformer Protection ( Main 2) complete with 2 sets<br />

the required protective relays and accessories in<br />

one (1) panel, Different manufacturer from Main 1<br />

in accordance to the requirements of the<br />

Technical Data Sheet (TDS)<br />

Page 4 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

c. Breaker Failure Protection System<br />

1 sets<br />

Complete with the required protective relays and<br />

accessories for four (4) 230 kV Power Circuit<br />

Breakers in one panel in accordance to the<br />

requirements of the Technical Data Sheet (TDS).<br />

d. 230 kV Bus Protection System, Main 1 - complete 1 sets<br />

with accessories for connection of new breaker 8-<br />

03CB24CLA and 8-04CB24CLA at Bus 8-<br />

BS03CLA to existing GE B30-8BS03CLA in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

e. 230 kV Bus Protection System, Main 1 - complete 1 sets<br />

with accessories for connection of new breaker 8-<br />

03CB08CLA and 8-04CB08CLA at Bus 8 -<br />

BS04CLA to existing GE B30-8BS04CLA in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

d. 230 kV Bus Protection System, (Main 2) complete 2 sets<br />

with the required protective relays and accessories<br />

for the integration of five (5) 230 kV Power Circuit<br />

Breakers (Bus Tie, Bay 3,4,5 and 6 Breakers) in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

f. 69 kV Feeder Protection System, complete with<br />

the required protective relays and accessories for<br />

the following outgoing 69 kV feeders in<br />

accordance to the requirements of the Technical<br />

Data Sheet (TDS)<br />

f.1 Three (3) 69 kV breakers with two (2) 69 kV 1 sets<br />

outgoing feeders in one (1) panel<br />

f.2 Three (3) 69 kV breakers with two (2) 69 kV 1 sets<br />

outgoing feeders in one (1) panel<br />

g. Bay Control Unit with provision for integration to 2 sets<br />

existing and new Microprocessor Based<br />

Substation Control system complete with<br />

necessary accessories in accordance to the<br />

requirements of the Technical Data Sheet (TDS)<br />

Bay 83 and Bay 84 at Clark 230 kV S/S<br />

A24 Line Protection System<br />

a. Line Protection for 230 kV system (Main 1 -<br />

2 sets<br />

Distance Relay) complete with the required<br />

protective relays and accessories in accordance to<br />

the requirements of the Technical Data Sheet<br />

(TDS).<br />

b. Line Protection for 230 kV system (Main 2 - Line 2 sets<br />

Differential Relay) complete with the required<br />

protective relays and accessories in accordance to<br />

the requirements of the Technical Data Sheet<br />

(TDS).<br />

A25 Capacitive Voltage Transformer 230 kV, complete with 6 units<br />

the required accessories and support structure in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

Page 5 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

A26 Surge Arresters 192 kV, station type, complete with 6 units<br />

support structure and the required accessories in<br />

accordance to the requirements of the Technical Data<br />

Sheet (TDS).<br />

A27 Ganged Disconnect Switch 230kV, 3-phase, 2000A, 2 units<br />

40KA equipped with 460 vac 3 phase motor and<br />

manually group operated, complete with the required<br />

accessories in accordance to the requirements of the<br />

Technical Data Sheet (TDS).<br />

A28 Ganged Disconnect Switch 69kV, 3-phase, 2000A, 38 2 units<br />

kA equipped with 230 vac motor and manually group<br />

operated, complete with the required accessories in<br />

accordance to the requirements of the Technical Data<br />

A29 Ganged Disconnect Switch 69kV, 3-phase, 2000A, 38 2 units<br />

kA equipped with earthing blades, motor and manually<br />

group operated, complete with the required accessories<br />

in accordance to the requirements of the Technical Data<br />

Sheet (TDS)<br />

A30 Voltage Transformer 69 kV, complete with the required 12 units<br />

accessories in accordance to the requirements of the<br />

Technical Data Sheet (TDS)<br />

A31 BATTERY 125 VDC POWER SUPPLY SYSTEM 800 2 units<br />

amp-hour capacity indoor type complete with the<br />

required rack and accessories in accordance with the<br />

requirements of Technical Data Sheet (TDS)<br />

A32 Battery Charger 460 vac 3 phase in accordance with the 2 units<br />

requirements of the Technical Data Sheet (TDS).<br />

A33 Supply and Installation of Emergency Generators with 1 unit<br />

a capacity of 225 KVA, 460/230 vac, 60 HZ with diesel<br />

engine, Day Tank and four (4) 400 amps 480 vac 3-<br />

phase 4 poles ATS<br />

A32 NETWORK DISTURBANCE MONITORING<br />

1 lot<br />

EQUIPMENT (NDME)<br />

Supply of Data acquisition units complete with required<br />

peripherals and accessories. Reconfiguration of existing<br />

NDME to conform with the new set-up/configuration<br />

under this project to include Bay 81, 82, 83, 84, 85 & 86.<br />

The units should be the same brand or latest model and<br />

compatible with the existing unit at the control room.<br />

A33 FIBER OPTIC COMMUNICATION SYSTEM<br />

a. Fiber Optic Terminal Equipment complete with<br />

1 lot<br />

Optical Distribution Frame (ODF), access<br />

multiplexers, circuit protections, indicators,<br />

annunciators, appurtenances, pigtails, patch<br />

cords, complete with the required accessories.<br />

b. Fiber Optic Approach Cable, 36 fibers, 1550 nm, 1 lot<br />

Signal Mode (from station gantry to the Optical<br />

Distribution Frame at the FOT Equipment Room).<br />

Page 6 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

c. Protection Signaling Equipment complete with all 2 lot<br />

the necessary interface cables, software and<br />

manuals. Programmable teleprotection unit for<br />

transmitting / receiving minimum of four (4)<br />

independent command signals capable of<br />

communicating over analog and digital<br />

communication channel i.e., MUX (4WE&M,<br />

RS232, V.32, X.21, etc), PLC, copper wire and<br />

fiber optic.<br />

A34<br />

MICROWAVE RADIO COMMUNICATION SYSTEM<br />

a. Digital Microwave Radio Terminal, 16E1, 7GHz, 1+1<br />

MHSB including all necessary accessories i.e. mounting<br />

cabinet, rack/shelf assembly, order wire, fuse and alarm<br />

panel, power supply and jack field (for 16 tributaries)<br />

a.1 Clark S/S<br />

1 lot<br />

a.2 Mexico S/S<br />

1 lot<br />

b. Multiplex Equipment / Channel Bank and associated<br />

cards including all necessary peripheral equipment and<br />

installation accessories i.e. rack/shelf assembly, VF jack<br />

field, MDF, interface and data cable<br />

b.1 Clark S/S<br />

1 lot<br />

b.2 Mexico S/S<br />

1 lot<br />

c. Antenna System and Waveguides including all<br />

installation accessories and peripheral equipment i.e.<br />

antenna mount and support pipe, strut hardware kit,<br />

waveguide support hardware, flanging tools, waveguide<br />

connector etc.<br />

c.1 Clark S/S<br />

1 lot<br />

c.2 Mexico S/S<br />

1 lot<br />

d. Network Management System including all the<br />

necessary hardware and software modules for<br />

management of node element / sub network, i.e.<br />

industrial portable PC with licensed Windows Operating<br />

System and pre installed Network Management software.<br />

d.1 Clark - Mexico MW Radio link<br />

1 lot<br />

e. Protection Signaling Equipment complete with all the 2 lot<br />

necessary interface cables, software and manuals.<br />

Programmable teleprotection unit for transmitting /<br />

receiving minimum of four (4) independent command<br />

signals capable of communicating over analog and digital<br />

communication channel i.e., MUX (4WE&M, RS232,<br />

V.32, X.21, etc), PLC, copper wire and fiber optic.<br />

A35<br />

Spares, Spare parts and tools( see list as per TDS)<br />

a. Power Transformer 1 lot<br />

b. Power Circuit Breaker 230 kV and 69 kV 1 lot<br />

c. 230 kV and 69kV Ganged Disconnect Switches 1 lot<br />

d. 230 Kava and 69 kV Voltage Transformers 1 lot<br />

e. 230 kV and 69 kV Surge Arresters 1 lot<br />

f. Metal clad Switchgear 13.8 kV 1 lot<br />

g. Station Service Transformer 1 lot<br />

h. AC DC aux switchboard 1 lot<br />

Page 7 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

i. Storage Batteries 1 lot<br />

j. Battery Charger 1 lot<br />

k. MBSC 1 lot<br />

l. CCTV 1 lot<br />

m. Substation Protection System 1 lot<br />

n. Line Protection System 1 lot<br />

o. Network Disturbance Monitoring 1 lot<br />

p. Fibre Optical Terminal Equipment 1 lot<br />

q. Protection Signaling Equipment 1 lot<br />

r Microwave Radio Telephone equipment 1 lot<br />

Clark Load End Substation at PSPC<br />

A36 Station Service Transformer 75 kva 22.9/0.23kV, three 2 lot<br />

phase, Outdoor ONAN type, 35 kV xlpe cable, 300:5<br />

amp 22.9 kV CT, and accessories in accordance to the<br />

requirements of the Technical Data Sheet (TDS). To<br />

includes bus bar modification, current transformer, cover,<br />

support and wiring/termination to substation protection<br />

system. The scope covers the construction of<br />

foundation, HV and LV wiring and installation of new<br />

transformer.<br />

A37 Distribution Board 3 Phase 230 VAC with enclosure , 2 sets<br />

main breaker, tie breaker, automatic transfer switch, four<br />

(4) 3 poles branch circuit breakers, assorted copper<br />

wires, conduits and accessories in accordance to the<br />

requirements of the Technical Data Sheet (TDS). The<br />

scope includes the wiring and termination to existing<br />

MTS/AC panel and fire suppression panel.<br />

SUB-TOTAL FOR ITEM 3A ELECTRICAL WORKS<br />

B CIVIL WORKS<br />

FURNISH, INSTALL, CONSTRUCT, PLACE, APPLY<br />

AND / OR LAY, INCLUDING FURNISHING <strong>OF</strong> PLANT,<br />

LABOR, EQUIPMENT AND MATERIALS<br />

B1 EQUIPMENT FOUNDATION Consisting of concrete<br />

(211kg/cm²), Non-shirk Grout, Reinforcing Steel Bars<br />

(Grade 275), Excavation and backfill, Leveling Concrete<br />

(141 kg/cm²) and other incidentals required to complete<br />

the works.<br />

a. Power Transformer 2 lot<br />

b. Power Circuit Breaker 12 lot<br />

c. Current Transformer 72 lot<br />

d. Voltage Transformer 12 lot<br />

e. Surge Arresters 24 lot<br />

f. Ganged Disconnect Switch 24 lot<br />

G. Bus Supports 48 lot<br />

f. Emergency Generator set 1 lot<br />

B2 230 kV Gantry Structure Foundation Consisting of<br />

concrete (211kg/cm²), Non-shirk Grout, Reinforcing Steel<br />

Bars (Grade 275), Excavation and backfill, Leveling<br />

Concrete (141 kg/cm²) and other incidentals required to<br />

complete the works.<br />

1 lot<br />

Page 8 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

B3 Roadways, Parking Area, Concrete Curve & Gutter, 2227 sq.m<br />

Open stock yard Construction of access road from the<br />

existing roadway to the transformer area and parking<br />

area at warehouse, consisting of Concrete Pavement<br />

(246kg/cm²), Curb and Gutter (211kg/cm²) including<br />

dowels, Reinforcing steel bars (Grade 275), Aggregate<br />

Sub-Base and other incidentals to complete the work.<br />

B4 Drainage System - Consisting of different sizes of 435 lm<br />

RCDP, Drainage Appurtenances consisting of Concrete (Main)<br />

(211kg/cm²), Reinforcing steel bars Grade 275,<br />

Excavation and backfill, Miscellaneous Steel (ASTM 300 lm<br />

A36), CHB including demolition/restoration works for the (Sec.)<br />

affected portion of the existing drainage appurtenances<br />

and other incidentals to complete the work.<br />

B5 Oil/Water Separator - Consisting of concrete 1 lot<br />

(211kg/cm²), Reinforcing Steel Bars (Grade 275),<br />

Excavation and backfill, Miscellaneous Steel, Galvanized<br />

Steel pipe, B.I. Pipe, including its tapping to the nearest<br />

drainage system and other incidentals required to<br />

complete the work.<br />

B6 Concrete Firewall - Between transformers consisting of 1 lot<br />

Concrete (211kg/cm²), Reinforcing Steel Bars (Grade<br />

275), Excavation and Backfill, Leveling Concrete<br />

(141kg/cm²) and other incidentals required to complete<br />

the work.<br />

B7 Cable Trenches - Consisting of Concrete (211kg/cm²) 400 l.m.<br />

Reinforcing Steel Bars (Grade 275), Excavation, leveling (Main)<br />

Concrete (141kg/cm²), Checkered Steel Plate Cover,<br />

Stiffener, Embedded Metals, Steel angle, galvanized<br />

cable tray, pits, Discharge Pipes including 200 l.m.<br />

demolition/restoration works for the affected portion of (Branches)<br />

the existing cable trench to connect the new cable trench<br />

and other incidentals to complete the work.<br />

B8 Cable Pipe Crossing Roadways - Consisting of 12 l.m.<br />

concrete (211kg/cm²), Reinforcing Steel Bars (Grade<br />

275) Excavation, Sand and Gravel bedding, uPCV Pipes,<br />

Discharge Pipes and other incidentals required to<br />

complete the works.<br />

B9 Switchyard Gravel Surfacing - Gravel surfacing on the 1200 cu.m<br />

bays where the equipment will be installed with the lines<br />

and extent as directed by the owner.<br />

B10 Seclusion Fence and Gate - Enclosing the 230kV and 235 l.m.<br />

69kV switchyard consisting of Hot Dipped Galvanized<br />

Wire Mesh Gauge #10, G.I. Pipes Schedule 40,<br />

Miscellaneous Steel (ASTM A36), Concrete (211 kg/cm²)<br />

Reinforcing Steel Bars (Grade 275), Excavation and<br />

Backfill, and other incidentals to complete the work.<br />

B11 Embankment of Substation Expansion Area -<br />

7040 sq.m.<br />

Consisting of clearing, grading, and embankment with<br />

compaction in layers to match the existing finish grade in<br />

accordance with DPWH Standard Specifications.<br />

Page 9 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

B12 Retaining Wall and Perimeter Fence of Substation 295 l.m.<br />

Expansion Area - Consisting of Concrete (211kg/cm²),<br />

Reinforcing steel bars Grade 275, Excavation and<br />

backfill, CHB including demolition/restoration works for<br />

the affected portion of the existing retaining<br />

wall/perimeter fence and other incidentals to complete<br />

the work. To include painting of walls and perimeter<br />

fence and affected areas.<br />

B13 69kV Gantry Structure Foundation Consisting of 1 set<br />

concrete (211kg/cm²), Non-shirk Grout, Reinforcing Steel<br />

Bars (Grade 275), Excavation and backfill, Leveling<br />

Concrete (141 kg/cm²) and other incidentals required to<br />

complete the works.<br />

B14 Expansion of Existing Clark 230KV S/S Control 115 sq.m.<br />

House Consisting of architectural, civil, electrical,<br />

mechanical, and finishing works to match the existing. To<br />

include supply of 3-3 tons split air conditioning units,<br />

industrial type exhaust fan, fire detection units to connect<br />

to existing Fire Alarm panel, lights and outlets, wiring and<br />

other accessories and incidentals to complete the work.<br />

To include repainting of Bldg external and affected<br />

areas.<br />

B15 Proposed Clark 230KV S/S Warehouse Consisting of 288 sq.m.<br />

architectural, civil/structural, electrical, and mechanical<br />

works for the construction of steel frame warehouse with<br />

minimum beam height of 6.00 meters. To include supply<br />

and installation of industrial exhaust fans, lighting fixtures<br />

and outlets. Painting of building internal and external.<br />

B16 Fire Water System,<br />

a. Cleaning & Flushing of following existing facilities<br />

1. 100 mm 440 mtrs<br />

2. 50 mm 110 mtrs<br />

3. 40 mm 200 mtrs<br />

4. Assorted sizes to control room, guard house 100 mtrs<br />

and green area<br />

5. Elevated Water Tank 10,000 gal<br />

1 set<br />

b. New Installation of the following<br />

1. 100 mm GI super sched 40 underground line 420 mtrs<br />

2.<br />

with fittings, valves sand beddings and with<br />

protection membrane<br />

Fire hose reel cabinet with 40 mm brass 12 sets<br />

nozzle, 40 mm x 30 mtrs hose, 40 mm brass<br />

valve, fittings, glass, painted gauge #10 metal<br />

sheet and concrete foundation.<br />

3. Road Crossing of Fire water line, include 9 mtrs<br />

cutting, excavation, backfilling, sand bedding<br />

and road concreting<br />

B17 Rehabilitation of Existing Water Well, includes<br />

100 mtrs<br />

suctioning/cleaning of existing water well including use of<br />

equipment (air compressor and other cleaning equipment)<br />

B18 Replacement of Existing Submersible Pump multistage<br />

type, 100 GPM, 95 meters TDH complete with control and<br />

including Pull out of existing and installation of new<br />

submersible pump.<br />

1 unit<br />

Page 10 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

B19 Rehabilitation of Existing Fire Pump, includes<br />

1 unit<br />

cleaning of pumps, testing, electrical system and ready<br />

for operation.<br />

B20 Rehabilitation of Existing Jockey Pump, includes 1 unit<br />

cleaning of pumps, testing, electrical system and ready<br />

for operation.<br />

B21 Brand New Truck Loader Cargo Crane 1 unit<br />

Gross vehicle mass including crane 8,000, Crane<br />

capacity 5,000 kg at 2.4 meters, Maximum lift above<br />

ground 10 Meters, With Hydraulic motors for winch, and<br />

swing, Hydraulic extended Outriggers, Hydraulic pump,<br />

and powered thru PTO. For turn over to CDC-ECMD<br />

SUB-TOTAL FOR ITEM 3B CIVIL WORKS<br />

TOTAL CLARK SUBSTATION 230/69KV<br />

4.0 Metering System (230kV System) 6 sets<br />

Current transformer Multi ratio 2000:5A 0.3 accuracy<br />

class, Burden B-0.1 to 0.9, Voltage transformer 0.3<br />

accuracy, weather proof enclosure for Billing meter for<br />

the electronic billing system in accordance to the<br />

requirements and specification of the power provider<br />

(NGCP/TRANSCO) for T1, T2, T3, T4, T5 and T6.<br />

5.0 GRID IMPACT STUDY, including request and payment 1 lot<br />

for the data, review and approval of NGCP<br />

6.0 OCCUPATIONAL HEALTH AND SAFETY 1 lot<br />

includes personal protective equipment, clinical<br />

materials, signage's and barricades, and the salary and<br />

wages of health and safety personnel.<br />

7.0<br />

Facilities For The Engineer such as temporary field<br />

office, including all necessary electricity, water,<br />

telephone services, office equipment, furniture and<br />

the following for the use of CDC/ECMD Engineers.<br />

For turn over to CDC-ECMD after the completion of<br />

the project<br />

a Field Office (20 ft Container with AC unit)<br />

2 units<br />

b Laptops Intel Core i7-2410 processor, Window 7 4 units<br />

c<br />

pro, MS Office 2007 with external 1TB hard Drive<br />

Desktop Intel i7-550 Processor, Window 7 pro, MS 2 units<br />

office 2007 with external 1TB hard drive<br />

d Licensed AUTOCAD (2010 or latest) softwares 2 units<br />

e Licensed Ms Project (2010 or latest) softwares 2 units<br />

f Service Vehicle Twin Cab Pick up 4 x 4 (3.0 diesel 2 units<br />

engine, common rail direct injection) with fuel,<br />

driver, maintenance, other costs (Toll fee, parking)<br />

for 14 months (lease to own)<br />

g Service Vehicle AUV 4 x 2 (2.5 Diesel engine) with 1 unit<br />

fuel, driver and maintenance, others (Toll, parking<br />

fee) costs for 14 months (lease to own)<br />

Page 11 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

h Digital SLR Camera 15 megapixel with zoom 105, 2 units<br />

extra 8GB memory card and bag.<br />

i Flat bed scanner A4<br />

1 unit<br />

j Color Printer A3 paper size complete with supply 1 unit<br />

of paper and ink for the duration of the project<br />

k Professional Infrared Thermal Imagers<br />

1 unit<br />

l Voice recorder 8GB, Built-in Li-Ion Battery<br />

1 unit<br />

8.0<br />

A<br />

MEXICO 230 KV SUBSTATION Bay 87 and 88<br />

(All in accordance with NGCP specifications)<br />

ELECTRICAL WORKS<br />

Supply, manufacture, factory testing, and furnishing of<br />

labor, equipment, tools and incidental materials for the<br />

delivery, assembly, erection, installation, field testing<br />

commissioning and ready for operation of the following<br />

substation equipment and its associated control and<br />

protection system and accessories<br />

A1 Power Circuit Breaker Live Tank 230kV, 3-phase, 2 sets<br />

3000A, 40, kA single and three pole operation (3+1),<br />

complete with the required accessories and support<br />

structure<br />

A2 Ganged Disconnect Switch 230kV, 3-phase, 3000A, 2 sets<br />

44KA equipped with 460 vac 3 phase motor and<br />

manually group operated, complete with the required<br />

accessories<br />

A3 Ganged Disconnect Switch 230kV, 3-phase, 3000A, 2 sets<br />

44KA equipped with earthing, 460 vac 3 phase motor<br />

and manually group operated, complete with the required<br />

accessories<br />

A4 Capacitor Voltage Transformer (CVT) 230 kV, 3 sets<br />

complete with the required accessories and support<br />

structure.<br />

A5 Surge Arresters 192 kV, station type, complete with 3 sets<br />

support structure and the required accessories<br />

A6 Substation Gantry and Pedestal Steel Structures 1 lot<br />

including bolts, washer, etc hot dipped galvanized<br />

complete with all the required accessories<br />

A7 Installation Materials consisting of conductors, 1 lot<br />

insulators, connectors, pole line hardwares and other<br />

accessories<br />

A8 Grounding Materials consisting of insulated and bare 1 lot<br />

copper cables, lightning rod, copper rods, fittings.<br />

complete with the required materials for aerial and<br />

grounding mat and to substation equipment and<br />

structures.<br />

A9 AC and DC Auxiliary Panels Indoor type, complete with 1 lot<br />

the required equipment, devices and required<br />

accessories<br />

Page 12 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

A10 Distribution Board 125 VDC complete with enclosure, 1 lot<br />

main, Automatic transfer switch, tie breaker, branch<br />

breakers, and accessories for installation.<br />

A11 Distribution Board 3 Phase 230 VAC with enclosure , 1 lot<br />

main breaker, tie breaker, automatic transfer switch,<br />

branch circuit and accessories<br />

A12 Cable Trays (various type) hot dipped galvanized,<br />

1 lot<br />

complete with supports, fittings, and other accessories.<br />

Cost of cable tray to be included at cable trenches<br />

A13<br />

Substation Control System<br />

Main Control Switchboard, with all instrument, meters,<br />

indicators, control switches, annunciators, push buttons,<br />

LED indicating lamps, terminal blocks, wiring and<br />

miscellaneous auxiliary and accessory devices<br />

1 lot<br />

Bay Control Unit with provision for integration to existing<br />

Micro Processor Base Control System complete with<br />

necessary accessories<br />

1 lot<br />

A14<br />

Substation Protection System<br />

a. Breaker Failure Protection System Complete with 1 set<br />

the required protective relays and accessories for<br />

four (4) 230 kV Power Circuit Breakers in one<br />

panel.<br />

b. 230 kV Bus Protection System, - complete with the 1 lot<br />

required Peripheral Unit protective relays and<br />

accessories for the integration of two (2) 230 kV<br />

Power Circuit Breakers<br />

A15<br />

Line Protection System<br />

a. Distance Protection System (Main 1 and Main 2 sets<br />

2) Main 1 complete with the required protective<br />

relays and accessories in one panel and Main 2<br />

complete with the required protective relays and<br />

accessories in one panel.<br />

b. Differential Protection System (Main 1 and Main 2 sets<br />

2) Main 1 complete with the required protective<br />

relays and accessories in one panel and Main 2<br />

complete with the required protective relays and<br />

accessories in one panel.<br />

A16 Current Transformers 230 kV, Multi-ratio, three core, 12 sets<br />

outdoor type oil filled, free standing complete with<br />

support structure and required accessories in<br />

accordance with NGCP specs.<br />

A17 Power Control , Instrumentation and Protection<br />

1 lot<br />

Cables, complete with insulated terminal lugs, glands,<br />

etc.<br />

Page 13 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

A18 Fiber Optic Communication System<br />

a. Fiber Optic Terminal Equipment complete with 1 lot<br />

Optical Distribution Frame (ODF), access<br />

multiplexers, circuit protections, indicators,<br />

annunciators, appurtenances, pigtails, patch<br />

cords, complete with the required accessories.<br />

b. Fiber Optic Approach Cable, 36 fibers, 1550nm, 1 lot<br />

signal mode (from station gantry to the Optical<br />

Distribution Frame at the FOT Equipment Room.<br />

c. Protection Signaling Equipment complete with all 1 lot<br />

the necessary interface cables, software and<br />

manuals. Programmable teleprotection unit for<br />

transmitting / receiving minimum of four (4)<br />

independent command signals capable of<br />

communicating over analog and digital<br />

communication channel i.e., MUX (4WE&M,<br />

RS232, V.32, X.21, etc), PLC, copper wire and<br />

fiber optic.<br />

A19<br />

Microwave Radio Communication System<br />

a. Complete integration and interconnection of<br />

1 lot<br />

existing FOT and MW telecommunication system<br />

with associated equipment including interface<br />

cables, MUX equipment / channel cards, etc.<br />

b. Protection Signaling Equipment complete with all 1 lot<br />

the necessary interface cables, software and<br />

manuals. Programmable teleprotection unit for<br />

transmitting / receiving minimum of four (4)<br />

independent command signals capable of<br />

communicating over analog and digital<br />

communication channel i.e., MUX (4WE&M,<br />

RS232, V.32, X.21, etc), PLC, copper wire and<br />

fiber optic.<br />

A20 NETWORK DISTURBANCE MONITORING<br />

1 Lot<br />

EQUIPMENT Supply of DAU complete with cables and<br />

accessories, Reconfiguration of the existing NDME to<br />

conform with the new setup/configuration of the<br />

substation under this project<br />

A21 Spares, Spare parts and tools:<br />

a. 230 kV Power Circuit Breakers<br />

1 lot<br />

b. 230 kV Ganged Disconnect Switches<br />

1 lot<br />

c. 230 kV Coupling Capacitor Voltage Transformers<br />

1 lot<br />

d. 230 kV Surge Arresters<br />

1 lot<br />

e. 230 kV Current Transformers<br />

1 lot<br />

f. Substation and Line Protection System (incl at Clark SS) 1 lot<br />

g. 460,230 VAC & 125 VDC Auxiliary Switchboard<br />

1 lot<br />

SUB-TOTAL FOR ITEMS 8A ELECTRICAL WORKS<br />

B CIVIL and ARCHITECTURAL WORKS<br />

Complete Design, Furnish, install, construct, place, apply<br />

and/or lay, including furnishing of plant, labor, equipment<br />

and materials<br />

Page 14 of 15


DESIGN AND BUILD SERVICES FOR THE CLARK 230 KV POWER TRANSMISSION LINE PROJECT -<br />

PHASE 3B<br />

ITEM DESCRIPTION<br />

QTY UNIT UNIT COST AMOUNT<br />

B1<br />

Equipment Foundation consisting of concrete (211<br />

kg/sq. cm, NGCP specs), Non-shirk Grout, Reinforcing<br />

steel Bars (Grade 275, NGCP specs), Excavation and<br />

backfill, Leveling Concrete (141 kg/sq. cm) and other<br />

incidentals required to complete the works.<br />

a. Power Circuit Breakers<br />

6 lot<br />

b. Ganged Disconnect Switches<br />

12 lot<br />

c. Capacitor Voltage Transformers<br />

3 lot<br />

d. Surge Arresters<br />

3 lot<br />

e. Current Transformers<br />

12 lot<br />

B2 230 kV Gantry Structure Foundation Consisting of<br />

1 lot<br />

concrete (211kg/sq cm), Non-shrink Grout, Reinforcing<br />

Steel Bars (Grade 275), Excavation and backfill, Leveling<br />

Concrete (141) kg/sq cm) and other incidentals required<br />

to complete the works.<br />

B3 Roadways, Concrete Curve & Gutter Construction of 1 lot<br />

access road from the existing roadway to the switchyard<br />

area, consisting of concrete pavement (246 kg/ sq cm),<br />

curb and gutter (211 kg/ sq cm) including dowels,<br />

Reinforcing Steel bars (Grade 275, Aggregate sub-base<br />

and other incidentals required to complete the work.<br />

B4 Drainage System, Consisting of different sizes of RCDP, 1 lot<br />

drainage appurtenances consisting of concrete (211kg/<br />

sq cm), Reinforcing steel bars Grade 275, Excavation<br />

and backfill, miscellaneous Steel (ASTM A36), CHB<br />

including demolition/restoration works for the affected<br />

portion of the existing drainage appurtenances and other<br />

incidentals required to complete the works.<br />

B5 Cable Trenches Consisting of concrete (211 kg/sq cm) 50 l.m.<br />

Reinforcing Steel Bars Grade 275, Excavation, leveling<br />

concrete (141 kg/sq cm), checkered steel plate cover,<br />

stiffener, embedded metals, steel angle, pits, discharge<br />

pipes including demolition/restoration and works for the<br />

affected portion of the existing cable trench to connect<br />

the new trench and other incidentals required to<br />

complete the works.<br />

B7 Switchyard Gravel Surfacing, Gravel surfacing on the 1 lot<br />

bays where the equipment will be installed with lines and<br />

extent as directed by the owner.<br />

SUB-TOTAL FOR ITEM 8B CIVIL WORKS<br />

9.0 Reconfiguration/ Parameterization/ Data Base<br />

1 lot<br />

Configuration of existing MBSC System complete with<br />

Bay Control units, Cables, accessories, peripheral, etc.<br />

to conform with the new set-up of NGCP Mexico<br />

Substation<br />

TOTAL MEXICO SUBSTATION 230KV<br />

TOTAL PROJECT DIRECT COST<br />

Page 15 of 15