Capital Improvement Plan (CIP) - City of Delaware
Capital Improvement Plan (CIP) - City of Delaware Capital Improvement Plan (CIP) - City of Delaware
Recommended Funding: Project continues under preliminary development in the ODOT PDP process for minor projects. All design expenses are 100% reimbursable through ODOT. Construction could begin in 2012 and is a candidate for funding split of 80% MORPC funds (STP) and 20% City funds (as is right-of-way purchase). Based on the projected 2012 STP available funds to cover remaining environmental and engineering costs (this project only), approximately $2,600,000 should be available for right-of-way and construction cost reimbursement. Our current estimate for right-of-way and construction is $2,875,000 (80% of this amount is $2,300,000). RE C O M M E N D E D F U N D IN G E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls T ra ff ic E nv ir on m ent a l $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 P relim in a ry E n gine ering $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 Fina l E n gineer ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 R / W C on sult a nt R / W P ur cha se Ad m instra t ive C o nst ru ction C h an ge O r d er/ C o nt ing ency C o nst ru ction E ngin eering In sp ect ion T ot a ls $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0 So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls G ener al Fun d O th er C ity Fu nd s M un icip a l B on d s P riv at e F un d ing St a t e/ Fed era l $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0 T ot a ls $ 3 5 0 ,0 0 0 54
CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Veterans Parkway Description and Purpose: Planning, design, and construction of a limited access highway from the US 23 to the intersection of Glenn Road and Mill Run Crossing (as recently defined in determining the study area with ODOT). Identified as a Tier II project on ODOT’s TRAC list (PID 80824) – called the Delaware Southeast By-Pass. Project AKA Alternate #16 from the 2001 Thoroughfare Plan. Department: Engineering Services Fund: Capital Improvement Fund (Fund 410) Justification: Project is identified as a high priority project on the City’s thoroughfare plan by both the City and County. $4.48 million in federal earmark funds were authorized in the current SAFETEA-LU Transportation bill supported by U.S. House of Representative Patrick Tiberi’s office, with up to $4,082,813 Million available for the project study and design. The City’s 20% matching obligation for the federal earmark funds is to be offset by ODOT assigned TRC’s (Toll Revenue Credits). Recommended Funding: Project must follow the ODOT 14-Step Project Development Process (PDP). Project negotiations were completed with professional service contract approved in June 6, 2008 for $356,491 which has been encumbered through ODOT. City to front cost of all design work with reimbursement on an as-invoiced basis. Also, Senator Voinovich, Congressman Tiberi, and Senator Brown all submitted an appropriation questionnaire for FY 2009 for $38 million in additional federal earmark request for construction funding, though approval is unlikely. Recommended funding for construction is based on assumptions made during pre-planning process, absent of a preferred alignment. Estimates are provided only to illustrate the magnitude of the construction costs. Estimates based on 2.6 miles of two-lane “super-two” highway and four (4) bridges. 2013+ costs are shown to capture the magnitude of future additional funds required for the project construction and it is anticipated that the actual schedule for construction will be revised to subsequent years. 55
- Page 3 and 4: City of Delaware Ohio current need
- Page 5 and 6: 2009-2013 CAPITAL IMPROVEMENT PLAN
- Page 7 and 8: Executive Summary Capital Improveme
- Page 9 and 10: Recreation, and Information Technol
- Page 11 and 12: PART II. FINANCIAL SUMMARY Revenues
- Page 13 and 14: Refuse Fund 457,476 428,876 470,276
- Page 15: Kingman hill water tower, and the W
- Page 18 and 19: Implement the recommendations of th
- Page 20 and 21: Minimize leachate from the closed l
- Page 23 and 24: CAPITAL IMPROVEMENT PLAN AIRPORT IM
- Page 25 and 26: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 27 and 28: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 29 and 30: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 31 and 32: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 33 and 34: CAPITAL IMPROVEMENT PLAN STREET MAI
- Page 35 and 36: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 37 and 38: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 39 and 40: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 42 and 43: Justification: The existing interse
- Page 45 and 46: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 47: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 50 and 51: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 52 and 53: Pictures and Drawings: 52
- Page 56 and 57: Recommended Funding Cont’d: R E C
- Page 59: REVENUES: CAPITAL IMPROVEMENT PLAN
- Page 62 and 63: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 65: CAPITAL IMPROVEMENT PLAN EQUIPMENT
- Page 68 and 69: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 70 and 71: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 72 and 73: Recommended Funding: RE C O M M E N
- Page 74 and 75: 34 74
- Page 76 and 77: City of Delaware 2009-2013 Capital
- Page 78 and 79: City of Delaware 2009-2013 Capital
- Page 80 and 81: City of Delaware 2009-2013 Capital
- Page 83 and 84: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 85 and 86: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 87 and 88: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 89 and 90: CAPITAL IMPROVEMENT PLAN PARK IMPAC
- Page 91 and 92: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 93 and 94: CAPITAL IMPROVEMENT PLAN POLICE IMP
- Page 95 and 96: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 97 and 98: CAPITAL IMPROVEMENT PLAN FIRE IMPAC
- Page 99 and 100: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 101 and 102: Department: Fire Department Fund: F
- Page 103 and 104: CAPITAL IMPROVEMENT PLAN MUNICIPAL
Recommended Funding:<br />
Project continues under preliminary development in the ODOT PDP process for<br />
minor projects. All design expenses are 100% reimbursable through ODOT.<br />
Construction could begin in 2012 and is a candidate for funding split <strong>of</strong> 80%<br />
MORPC funds (STP) and 20% <strong>City</strong> funds (as is right-<strong>of</strong>-way purchase). Based<br />
on the projected 2012 STP available funds to cover remaining environmental<br />
and engineering costs (this project only), approximately $2,600,000 should be<br />
available for right-<strong>of</strong>-way and construction cost reimbursement. Our current<br />
estimate for right-<strong>of</strong>-way and construction is $2,875,000 (80% <strong>of</strong> this amount<br />
is $2,300,000).<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
T ra ff ic<br />
E nv ir on m ent a l $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />
P relim in a ry E n gine ering $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />
Fina l E n gineer ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha se<br />
Ad m instra t ive<br />
C o nst ru ction<br />
C h an ge O r d er/ C o nt ing ency<br />
C o nst ru ction E ngin eering<br />
In sp ect ion<br />
T ot a ls $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d<br />
O th er C ity Fu nd s<br />
M un icip a l B on d s<br />
P riv at e F un d ing<br />
St a t e/ Fed era l $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />
T ot a ls $ 3 5 0 ,0 0 0<br />
54