CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM US 36 & Cheshire-Channing Intersection Improvements Description and Purpose: The project involves widening US 36 to provide left turn lanes for traffic from US 36 westbound to Ann Street and Cheshire Street and US 36 eastbound to Channing Street. Also included is the conversion of Channing Street to “oneway” to the north and the establishment of a dedicated bus loading zone on the east side of Channing Street for the adjacent school. The traffic signal at Ann Street will be removed and a new mast arm signal will be installed at Cheshire Street and coordinated with an updated mast arm signal at Channing Street. Department: Engineering Services Fund: Capital Improvement Fund (Fund 410) OPWC SCIP/LTIP Grant Funding (44% of construction) $50,000 County Engineer Funds Justification: Recent traffic analysis indicates that a signal is warranted at US 36 and Cheshire Street and a signal is no longer warranted at US 36 and Ann Street. Left turn movements from US 36 to both Cheshire Street and Channing Street obstruct through traffic movements, especially during the peak traffic hours. Travel direction and access changes along Channing Street, between US 36 and Winter Street, are included to improve the safety of the school bus loading zone and the signal operation at US 36. Most importantly, with the consideration of other roadway improvements to The Point, the traffic demand on this intersection will be greater. Pictures and Drawings: See drawing on next page 47
- Page 1 and 2: City of Delaware Ohio August 28, 20
- Page 3 and 4: City of Delaware Ohio current need
- Page 5 and 6: 2009-2013 CAPITAL IMPROVEMENT PLAN
- Page 7 and 8: Executive Summary Capital Improveme
- Page 9 and 10: Recreation, and Information Technol
- Page 11 and 12: PART II. FINANCIAL SUMMARY Revenues
- Page 13 and 14: Refuse Fund 457,476 428,876 470,276
- Page 15: Kingman hill water tower, and the W
- Page 18 and 19: Implement the recommendations of th
- Page 20 and 21: Minimize leachate from the closed l
- Page 23 and 24: CAPITAL IMPROVEMENT PLAN AIRPORT IM
- Page 25 and 26: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 27 and 28: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 29 and 30: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 31 and 32: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 33 and 34: CAPITAL IMPROVEMENT PLAN STREET MAI
- Page 35 and 36: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 37 and 38: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 39 and 40: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 42 and 43: Justification: The existing interse
- Page 45: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 50 and 51: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 52 and 53: Pictures and Drawings: 52
- Page 54 and 55: Recommended Funding: Project contin
- Page 56 and 57: Recommended Funding Cont’d: R E C
- Page 59: REVENUES: CAPITAL IMPROVEMENT PLAN
- Page 62 and 63: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 65: CAPITAL IMPROVEMENT PLAN EQUIPMENT
- Page 68 and 69: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 70 and 71: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 72 and 73: Recommended Funding: RE C O M M E N
- Page 74 and 75: 34 74
- Page 76 and 77: City of Delaware 2009-2013 Capital
- Page 78 and 79: City of Delaware 2009-2013 Capital
- Page 80 and 81: City of Delaware 2009-2013 Capital
- Page 83 and 84: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 85 and 86: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 87 and 88: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 89 and 90: CAPITAL IMPROVEMENT PLAN PARK IMPAC
- Page 91 and 92: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 93 and 94: CAPITAL IMPROVEMENT PLAN POLICE IMP
- Page 95 and 96: CITY OF DELAWARE 2009-2013 CAPITAL
Pictures and Drawings:<br />
46