Capital Improvement Plan (CIP) - City of Delaware
Capital Improvement Plan (CIP) - City of Delaware Capital Improvement Plan (CIP) - City of Delaware
Recommended Funding: It is recommended that the funding for this program be gradually increased to a level that coincides with the calculated amount necessary to properly maintain the city street network as a whole (according to the city’s pavement maintenance software and recommendations from experts). Small percentage of funding is recommended to come from Fund 541 for manhole casting improvements that are traditionally made part of this project. R EC OM M EN D ED F UN D IN G Es tim a te d Expe nditure s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls Res urfacing P ro gram $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847 To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847 S o urc e o f F unds 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls General Fund CDBG Rehabilitatio n $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 425,000 Other City Funds /Gas Tax $ 226,718 $ 798,600 $ 823,529 $ 850,000 $ 850,000 $ 3,548,847 P rivate Funding State/Federal To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847 38
CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Project: Annual Traffic Signalization Improvements Description and Purpose: The traffic signalization program provides annual funding for major signal equipment upgrades and installations for the over 58 existing and proposed signalized intersection locations in the city. Department: Public Works & Department of Engineering Services Fund: Capital Improvement Fund (Fund 410) Justification: Advances upgrades to signal system equipment including L.E.D. bulb changeover, battery back-up installation, and closed loop interconnect improvements. Recommended Funding: R E C O M M E N D E D F U N D IN G E s tim a te d E x p e n d itu r e s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls T r a ffic S ig n a liz a tio n $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 S o u r c e o f F u n d s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls C a p ita l Im p r o v e m e n ts $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 39
- Page 1 and 2: City of Delaware Ohio August 28, 20
- Page 3 and 4: City of Delaware Ohio current need
- Page 5 and 6: 2009-2013 CAPITAL IMPROVEMENT PLAN
- Page 7 and 8: Executive Summary Capital Improveme
- Page 9 and 10: Recreation, and Information Technol
- Page 11 and 12: PART II. FINANCIAL SUMMARY Revenues
- Page 13 and 14: Refuse Fund 457,476 428,876 470,276
- Page 15: Kingman hill water tower, and the W
- Page 18 and 19: Implement the recommendations of th
- Page 20 and 21: Minimize leachate from the closed l
- Page 23 and 24: CAPITAL IMPROVEMENT PLAN AIRPORT IM
- Page 25 and 26: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 27 and 28: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 29 and 30: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 31 and 32: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 33 and 34: CAPITAL IMPROVEMENT PLAN STREET MAI
- Page 35 and 36: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 37: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 42 and 43: Justification: The existing interse
- Page 45 and 46: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 47: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 50 and 51: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 52 and 53: Pictures and Drawings: 52
- Page 54 and 55: Recommended Funding: Project contin
- Page 56 and 57: Recommended Funding Cont’d: R E C
- Page 59: REVENUES: CAPITAL IMPROVEMENT PLAN
- Page 62 and 63: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 65: CAPITAL IMPROVEMENT PLAN EQUIPMENT
- Page 68 and 69: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 70 and 71: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 72 and 73: Recommended Funding: RE C O M M E N
- Page 74 and 75: 34 74
- Page 76 and 77: City of Delaware 2009-2013 Capital
- Page 78 and 79: City of Delaware 2009-2013 Capital
- Page 80 and 81: City of Delaware 2009-2013 Capital
- Page 83 and 84: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 85 and 86: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 87 and 88: CITY OF DELAWARE 2009-2013 CAPITAL
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Annual Traffic Signalization <strong>Improvement</strong>s<br />
Description and Purpose:<br />
The traffic signalization program provides annual funding for major signal<br />
equipment upgrades and installations for the over 58 existing and proposed<br />
signalized intersection locations in the city.<br />
Department:<br />
Public Works & Department <strong>of</strong> Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
Advances upgrades to signal system equipment including L.E.D. bulb<br />
changeover, battery back-up installation, and closed loop interconnect<br />
improvements.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E s tim a te d E x p e n d itu r e s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />
T r a ffic S ig n a liz a tio n $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
S o u r c e o f F u n d s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />
C a p ita l Im p r o v e m e n ts $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
39