Recommended Funding: Reimbursement to the city is either by direct payment, an agreed upon payment plan, or by tax assessment if required for uncooperative property owners. RE C O M M E N D E D F U N D IN G E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls Sid ew a lk & A DA A ccess $ 2 5 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 2 5 ,0 0 0 Sid ew a lk P rg m C it y R ep a irs $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 Sid ew a lk P rg m P r op O w ner $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0 T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0 So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls G ener al Fun d Sid ew a lk P ro gr am As sm nt s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0 O th er C ity Fu nd s $ 7 5 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 4 7 5 ,0 0 0 P riv at e F un d ing St a t e/ Fed era l T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0 36
CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Annual Street Resurfacing Description and Purpose: Annual program to maintain the surface course of pavement through mill & fill, overlay, slurry seal, and asphalt rejuvenator applications to select city streets. Without adequate funding, the focus of the program continues to be on preventative maintenance processes on local streets, deferring necessary surface course replacement until future years. Department: Engineering Services & Public Works Fund: Capital Improvement Fund (Fund 410) License Fee (Fund 202) Inflow/Infiltration (Fund 541) Justification: To improve the integrity of city streets for the safety of the traveling public, and to protect the city from unaffordable projects that involve total replacement of roadways that results from the lack of adequate preventative maintenance operations. Pictures/Images 37
- Page 1 and 2: City of Delaware Ohio August 28, 20
- Page 3 and 4: City of Delaware Ohio current need
- Page 5 and 6: 2009-2013 CAPITAL IMPROVEMENT PLAN
- Page 7 and 8: Executive Summary Capital Improveme
- Page 9 and 10: Recreation, and Information Technol
- Page 11 and 12: PART II. FINANCIAL SUMMARY Revenues
- Page 13 and 14: Refuse Fund 457,476 428,876 470,276
- Page 15: Kingman hill water tower, and the W
- Page 18 and 19: Implement the recommendations of th
- Page 20 and 21: Minimize leachate from the closed l
- Page 23 and 24: CAPITAL IMPROVEMENT PLAN AIRPORT IM
- Page 25 and 26: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 27 and 28: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 29 and 30: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 31 and 32: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 33 and 34: CAPITAL IMPROVEMENT PLAN STREET MAI
- Page 35: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 39 and 40: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 42 and 43: Justification: The existing interse
- Page 45 and 46: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 47: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 50 and 51: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 52 and 53: Pictures and Drawings: 52
- Page 54 and 55: Recommended Funding: Project contin
- Page 56 and 57: Recommended Funding Cont’d: R E C
- Page 59: REVENUES: CAPITAL IMPROVEMENT PLAN
- Page 62 and 63: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 65: CAPITAL IMPROVEMENT PLAN EQUIPMENT
- Page 68 and 69: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 70 and 71: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 72 and 73: Recommended Funding: RE C O M M E N
- Page 74 and 75: 34 74
- Page 76 and 77: City of Delaware 2009-2013 Capital
- Page 78 and 79: City of Delaware 2009-2013 Capital
- Page 80 and 81: City of Delaware 2009-2013 Capital
- Page 83 and 84: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 85 and 86: CITY OF DELAWARE 2009-2013 CAPITAL
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Annual Street Resurfacing<br />
Description and Purpose:<br />
Annual program to maintain the surface course <strong>of</strong> pavement through mill & fill,<br />
overlay, slurry seal, and asphalt rejuvenator applications to select city streets.<br />
Without adequate funding, the focus <strong>of</strong> the program continues to be on<br />
preventative maintenance processes on local streets, deferring necessary<br />
surface course replacement until future years.<br />
Department:<br />
Engineering Services & Public Works<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
License Fee (Fund 202)<br />
Inflow/Infiltration (Fund 541)<br />
Justification:<br />
To improve the integrity <strong>of</strong> city streets for the safety <strong>of</strong> the traveling public, and<br />
to protect the city from unaffordable projects that involve total replacement <strong>of</strong><br />
roadways that results from the lack <strong>of</strong> adequate preventative maintenance<br />
operations.<br />
Pictures/Images<br />
37