Description and Purpose: CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Project: Catch Basin Replacement Fees for replacement of catch basins within the City’s storm water system. A catch basin (a.k.a., storm drain inlet, curb inlet) is an inlet to the storm drain system that typically includes a grate or curb inlet where stormwater enters the catch basin and a sump to capture sediment, debris and associated pollutants. Catch basins act as pretreatment for other treatment practices by capturing large sediments. The performance of catch basins at removing sediment and other pollutants depends on the design of the catch basin (e.g., the size of the sump), and routine maintenance to retain the storage available in the sump to capture sediment. Department: Public Utilities Fund: Storm Sewer Fund (Fund 203) Justification: Replacement of inoperable catch basins. Recommended Funding: R E C O M M EN D E D F U N D I N G E st im a te d E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls C at ch B as i n Re p la c e m e n t $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00 T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00 S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls O t h e r C it y F u n d s $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00 T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00 160
CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Project: Bernard Ave. Storm Sewer Description and Purpose: Improvements to the storm sewer on Bernard Ave. from US 23 to Liberty Street Department: Public Utilities Fund: Storm Sewer Fund (Fund 203) Justification: The 1990 Storm Water Report update recommended this project (F-3) to improve the storm water drainage along Bernard Ave. from US 23 to Liberty Street. Recommended Funding: R E C O M M E N D E D F U N D IN G E st im a te d E x p e n d it ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s C o nst ru ct io n $ 7 5 ,0 0 0 $ 7 5 , 0 0 0 T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0 So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s O th e r C ity F u nd s $ 7 5 ,0 0 0 $ 7 5 , 0 0 0 T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0 161
- Page 109 and 110: Pictures and Drawings: 109
- Page 111 and 112: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 113 and 114: Pictures and Drawings: 113
- Page 115 and 116: CAPITAL IMPROVEMENT PROGRAM WATER F
- Page 117 and 118: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 119 and 120: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 121 and 122: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 123 and 124: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 125 and 126: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 127 and 128: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 129 and 130: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 131 and 132: CAPITAL IMPROVEMENT PROGRAM SEWER F
- Page 133 and 134: City of Delaware 2009-2013 Capital
- Page 135 and 136: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 137 and 138: CAPITAL IMPROVEMENT PROGRAM SEWER F
- Page 139 and 140: City of Delaware 2009-2013 Capital
- Page 141 and 142: City of Delaware 2009-2013 Capital
- Page 143 and 144: Pictures and Drawings: The impact o
- Page 145 and 146: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 147 and 148: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 149 and 150: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 151 and 152: City of Delaware 2009-2013 Capital
- Page 153 and 154: CAPITAL IMPROVEMENT PLAN STORM SEWE
- Page 155 and 156: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 157 and 158: City of Delaware 2009-2013 Capital
- Page 159: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 163 and 164: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 165: CAPITAL IMPROVEMENT PLAN REFUSE FUN
Description and Purpose:<br />
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Catch Basin Replacement<br />
Fees for replacement <strong>of</strong> catch basins within the <strong>City</strong>’s storm water system. A<br />
catch basin (a.k.a., storm drain inlet, curb inlet) is an inlet to the storm drain<br />
system that typically includes a grate or curb inlet where stormwater enters the<br />
catch basin and a sump to capture sediment, debris and associated pollutants.<br />
Catch basins act as pretreatment for other treatment practices by capturing<br />
large sediments. The performance <strong>of</strong> catch basins at removing sediment and<br />
other pollutants depends on the design <strong>of</strong> the catch basin (e.g., the size <strong>of</strong> the<br />
sump), and routine maintenance to retain the storage available in the sump to<br />
capture sediment.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
Replacement <strong>of</strong> inoperable catch basins.<br />
Recommended Funding:<br />
R E C O M M EN D E D F U N D I N G<br />
E st im a te d E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />
C at ch B as i n Re p la c e m e n t $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />
T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />
O t h e r C it y F u n d s $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />
T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />