CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Project: Blymer St Water Main Description and Purpose: Construction of an 8” water main on Blymer St. from E. Lincoln Ave. to Fountain Ave. then west on Fountain to N. Union St. Department: Public Utilities Department Fund: Water Construction Fund (Fund 531) Justification: Improvement of fire flow capacity with the replacement of the existing 4” waterline. Project defined in the 1986 Water System Master Plan. Recommended Funding: RECOMM ENDE D FUN DIN G Estimated Expend itures 2009 2010 2011 2012 2013 To tals Final Engineering Ad minstrative Construction $160,000 $160,000 Change Ord er/Contingency Construction Enginee ring Inspection Totals $160,000 $160,000 Source of Funds 2009 2010 2011 2012 2013 To tals General F und Other C ity Funds $160,000 $160,000 Municipal Bonds State /F ederal Totals $160,000 $160,000 128

CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Project: Backhoe Description and Purpose: Replacement of the Water Distribution existing “front line” backhoe that has reached the end of its current functional life cycle. A reliable properly configured backhoe is an indispensable piece of equipment for the water distribution daily system maintenance function. Department: Public Utilities Department Fund: Water Construction Fund (Fund 531) Justification: The existing “front line” back hoe will be retained to replace the existing “backup” backhoe. The “backup” unit serves to replace the “front line” unit as needed and as the aggregate loader at the stockpile location. The “backup” unit has long since been incapable of serving as a replacement for the “front line” unit, and has been prone to many failures. Recommended Funding: R ECOMM ENDE D FUN DIN G Estim ated Expend itures 2 00 9 2 010 20 11 20 12 20 13 To tals Ad minstrative Construction Ch an ge Ord er/Contingen cy Construction En ginee ring In spection Totals $ 90,000 $90,000 Source of Funds 2 00 9 2 010 20 11 20 12 20 13 To tals Gener al F un d Oth er C ity Funds $ 90,000 $90,000 Mun icipal Bon ds Totals $ 90,000 $90,000 129

CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Backhoe<br />

Description and Purpose:<br />

Replacement <strong>of</strong> the Water Distribution existing “front line” backhoe that has<br />

reached the end <strong>of</strong> its current functional life cycle. A reliable properly<br />

configured backhoe is an indispensable piece <strong>of</strong> equipment for the water<br />

distribution daily system maintenance function.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

The existing “front line” back hoe will be retained to replace the existing<br />

“backup” backhoe. The “backup” unit serves to replace the “front line” unit as<br />

needed and as the aggregate loader at the stockpile location. The “backup” unit<br />

has long since been incapable <strong>of</strong> serving as a replacement for the “front line”<br />

unit, and has been prone to many failures.<br />

Recommended Funding:<br />

R ECOMM ENDE D FUN DIN G<br />

Estim ated Expend itures 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Ad minstrative<br />

Construction<br />

Ch an ge Ord er/Contingen cy<br />

Construction En ginee ring<br />

In spection<br />

Totals $ 90,000 $90,000<br />

Source <strong>of</strong> Funds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Gener al F un d<br />

Oth er C ity Funds $ 90,000 $90,000<br />

Mun icipal Bon ds<br />

Totals $ 90,000 $90,000<br />

129