04.04.2015 Views

Capital Improvement Plan (CIP) - City of Delaware

Capital Improvement Plan (CIP) - City of Delaware

Capital Improvement Plan (CIP) - City of Delaware

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: US 23 Waterline Replacement<br />

Description and Purpose:<br />

Construction <strong>of</strong> an 8” water line on Route US-23 North.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water line to fill in gaps <strong>of</strong> water service along Rt. 23 N to allow taking the old<br />

16” water transmission main out <strong>of</strong> service. Existing 16” water main has been<br />

in continuous service since 1889 and its useful life has been surpassed.<br />

Repairs to this 16 inch main are costly, difficult, and temporarily impairs the<br />

Water <strong>Plan</strong>t capability to provide the necessary flow rates required.<br />

<strong>Improvement</strong>s for this project are defined in the 1986 Water System Master<br />

<strong>Plan</strong> study.<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />

Prelimin ary En gineer ing<br />

Final En gineer ing $45 ,000 $45,000<br />

R/W Pur chase<br />

Ad minstrative<br />

Co nstru ctio n $355 ,000 $355,000<br />

Co nstru ctio n En ginee ring<br />

In spection<br />

Totals $400 ,000 $400,000<br />

Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />

Gener al F un d<br />

Oth er C ity Fu nds $400 ,000 $400,000<br />

Mun icipal Bon ds<br />

State /F ederal<br />

Totals $400 ,000 $400,000<br />

118

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!