CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Project: Hills-Miller Road 24-inch Water Line Extension Description and Purpose: Construction of a 13,000 LF extension of the 24-inch distribution main along Hills-Miller Road, west of the CSX railway, east and then north along US23 to the Water Plant. Department: Department of Engineering Services & Utility Department Fund: Water Capacity Fee Fund (Fund 536) Justification: Project is the final phase of a necessary improvement to the distribution system and when complete, provides required redundancy in the system over the 100 year old 16-inch line parallel to US23. Updates/Changes: A 400 ft portion of this project from Merrick Blvd. to Hills-Miller Rd was constructed in 2005 in conjunction with the TSC development project on the west side of US-23. Engineering will continue in early 2008 with R/W for approximately 30 properties. Construction of remaining portion of extension estimated to begin in 2009. Recommended Funding: RE C O M M E N D E D F U N DI N G E st im a te d E x pe n dit ur e s 2 009 20 10 20 11 20 12 2 01 3 T o t a ls C o nst ru ct io n $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 So ur ce o f Fu nd s 2 008 20 09 20 10 20 11 2 01 2 T o t a ls W a t er Fun d s $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 112
Pictures and Drawings: 113
- Page 62 and 63: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 65: CAPITAL IMPROVEMENT PLAN EQUIPMENT
- Page 68 and 69: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 70 and 71: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 72 and 73: Recommended Funding: RE C O M M E N
- Page 74 and 75: 34 74
- Page 76 and 77: City of Delaware 2009-2013 Capital
- Page 78 and 79: City of Delaware 2009-2013 Capital
- Page 80 and 81: City of Delaware 2009-2013 Capital
- Page 83 and 84: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 85 and 86: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 87 and 88: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 89 and 90: CAPITAL IMPROVEMENT PLAN PARK IMPAC
- Page 91 and 92: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 93 and 94: CAPITAL IMPROVEMENT PLAN POLICE IMP
- Page 95 and 96: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 97 and 98: CAPITAL IMPROVEMENT PLAN FIRE IMPAC
- Page 99 and 100: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 101 and 102: Department: Fire Department Fund: F
- Page 103 and 104: CAPITAL IMPROVEMENT PLAN MUNICIPAL
- Page 105 and 106: CAPITAL IMPROVEMENT PROGRAM WATER F
- Page 107 and 108: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 109 and 110: Pictures and Drawings: 109
- Page 111: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 115 and 116: CAPITAL IMPROVEMENT PROGRAM WATER F
- Page 117 and 118: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 119 and 120: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 121 and 122: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 123 and 124: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 125 and 126: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 127 and 128: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 129 and 130: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 131 and 132: CAPITAL IMPROVEMENT PROGRAM SEWER F
- Page 133 and 134: City of Delaware 2009-2013 Capital
- Page 135 and 136: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 137 and 138: CAPITAL IMPROVEMENT PROGRAM SEWER F
- Page 139 and 140: City of Delaware 2009-2013 Capital
- Page 141 and 142: City of Delaware 2009-2013 Capital
- Page 143 and 144: Pictures and Drawings: The impact o
- Page 145 and 146: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 147 and 148: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 149 and 150: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 151 and 152: City of Delaware 2009-2013 Capital
- Page 153 and 154: CAPITAL IMPROVEMENT PLAN STORM SEWE
- Page 155 and 156: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 157 and 158: City of Delaware 2009-2013 Capital
- Page 159 and 160: CITY OF DELAWARE 2009-2013 CAPITAL
- Page 161 and 162: CITY OF DELAWARE 2009-2013 CAPITAL
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Hills-Miller Road 24-inch Water Line Extension<br />
Description and Purpose:<br />
Construction <strong>of</strong> a 13,000 LF extension <strong>of</strong> the 24-inch distribution main along<br />
Hills-Miller Road, west <strong>of</strong> the CSX railway, east and then north along US23 to<br />
the Water <strong>Plan</strong>t.<br />
Department:<br />
Department <strong>of</strong> Engineering Services & Utility Department<br />
Fund:<br />
Water Capacity Fee Fund (Fund 536)<br />
Justification:<br />
Project is the final phase <strong>of</strong> a necessary improvement to the distribution system<br />
and when complete, provides required redundancy in the system over the 100<br />
year old 16-inch line parallel to US23.<br />
Updates/Changes:<br />
A 400 ft portion <strong>of</strong> this project from Merrick Blvd. to Hills-Miller Rd was<br />
constructed in 2005 in conjunction with the TSC development project on the<br />
west side <strong>of</strong> US-23. Engineering will continue in early 2008 with R/W for<br />
approximately 30 properties. Construction <strong>of</strong> remaining portion <strong>of</strong> extension<br />
estimated to begin in 2009.<br />
Recommended Funding:<br />
RE C O M M E N D E D F U N DI N G<br />
E st im a te d E x pe n dit ur e s 2 009 20 10 20 11 20 12 2 01 3 T o t a ls<br />
C o nst ru ct io n $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
So ur ce o f Fu nd s 2 008 20 09 20 10 20 11 2 01 2 T o t a ls<br />
W a t er Fun d s $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
112