CITY OF DELAWARE 2009-2013 CAPITAL IMPROVEMENT PROGRAM Project: Hills-Miller Road 24-inch Water Line Extension Description and Purpose: Construction of a 13,000 LF extension of the 24-inch distribution main along Hills-Miller Road, west of the CSX railway, east and then north along US23 to the Water Plant. Department: Department of Engineering Services & Utility Department Fund: Water Capacity Fee Fund (Fund 536) Justification: Project is the final phase of a necessary improvement to the distribution system and when complete, provides required redundancy in the system over the 100 year old 16-inch line parallel to US23. Updates/Changes: A 400 ft portion of this project from Merrick Blvd. to Hills-Miller Rd was constructed in 2005 in conjunction with the TSC development project on the west side of US-23. Engineering will continue in early 2008 with R/W for approximately 30 properties. Construction of remaining portion of extension estimated to begin in 2009. Recommended Funding: RE C O M M E N D E D F U N DI N G E st im a te d E x pe n dit ur e s 2 009 20 10 20 11 20 12 2 01 3 T o t a ls C o nst ru ct io n $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 So ur ce o f Fu nd s 2 008 20 09 20 10 20 11 2 01 2 T o t a ls W a t er Fun d s $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0 112

Pictures and Drawings: 113

CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Hills-Miller Road 24-inch Water Line Extension<br />

Description and Purpose:<br />

Construction <strong>of</strong> a 13,000 LF extension <strong>of</strong> the 24-inch distribution main along<br />

Hills-Miller Road, west <strong>of</strong> the CSX railway, east and then north along US23 to<br />

the Water <strong>Plan</strong>t.<br />

Department:<br />

Department <strong>of</strong> Engineering Services & Utility Department<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Project is the final phase <strong>of</strong> a necessary improvement to the distribution system<br />

and when complete, provides required redundancy in the system over the 100<br />

year old 16-inch line parallel to US23.<br />

Updates/Changes:<br />

A 400 ft portion <strong>of</strong> this project from Merrick Blvd. to Hills-Miller Rd was<br />

constructed in 2005 in conjunction with the TSC development project on the<br />

west side <strong>of</strong> US-23. Engineering will continue in early 2008 with R/W for<br />

approximately 30 properties. Construction <strong>of</strong> remaining portion <strong>of</strong> extension<br />

estimated to begin in 2009.<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N DI N G<br />

E st im a te d E x pe n dit ur e s 2 009 20 10 20 11 20 12 2 01 3 T o t a ls<br />

C o nst ru ct io n $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 008 20 09 20 10 20 11 2 01 2 T o t a ls<br />

W a t er Fun d s $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />