City of Delaware Ohio August 28, 2008 Dear Mayor Wheeler and Council Members: In accordance with Section 79 of the City Charter, submitted herewith is the 2009-2013 Capital Improvement Plan (CIP). Pursuant to Section 80 of the Charter, Council is required to adopt a CIP on or before October 15. In review of the 2009-2013 CIP city staff made efforts to consider our capital needs, what the community wants, the age and condition of our infrastructure, the status of current projects, and how we could add the necessary new infrastructure and equipment in the most cost effective manner. You will see our estimates for the City’s general fund allocation to the CIP is fairly conservative with increases averaging 1.8% over the 5 year period. Technology and equipment purchases consume the majority of this revenue followed by transportation and street maintenance. Debt service paid by the general fund for the streetscape improvements, Ross Street Park, and pool improvements consumes an average of 35% of general fund income right off the top. The remaining amount of $6.1 million is what is left to spend on capital improvements. We have scaled back significantly in the transportation and street maintenance areas in order to preserve and target street maintenance dollars to the “The Point” project. Realignment and signalization of the intersection is planned for 2009. This project is being partially funded by the Ohio Public Works Commission and will address the City’s Point related congestion. You may recall the state of Ohio passed an “economic stimulus” bill in late spring of this year in an effort to spur economic development, growth, and generate jobs throughout the state. One of their targets was increasing funding for several Ohio Public Works Commission programs. The city has successfully completed several OPWC projects in the past and was eager to take advantage of this opportunity. Of course, these grants require a City commitment of funds as a match. The total project cost for all proposed OPWC projects is $3,437,600 with the City’s share being $1,754,447. We have also been fortunate in the past to receive a $50,000 contribution from the County for each of these projects. We anticipate that commitment to continue. You will see the “Point Phase 1” project in the Street Maintenance category and the other OPWC projects in the Transportation Improvement category. The downside to focusing resources on “The Point” in 2009 is a reduction in the City’s resurfacing dollars. Since the City’s contribution to the Point is $506,744 this added cost 1 South Sandusky Street • City Hall Delaware, OH 43015 p: 740-203-1200 f: 740-203-1224 1

<strong>City</strong> <strong>of</strong><br />

<strong>Delaware</strong><br />

Ohio<br />

August 28, 2008<br />

Dear Mayor Wheeler and Council Members:<br />

In accordance with Section 79 <strong>of</strong> the <strong>City</strong> Charter, submitted herewith is the 2009-2013<br />

<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong> (<strong>CIP</strong>). Pursuant to Section 80 <strong>of</strong> the Charter, Council is<br />

required to adopt a <strong>CIP</strong> on or before October 15.<br />

In review <strong>of</strong> the 2009-2013 <strong>CIP</strong> city staff made efforts to consider our capital needs, what<br />

the community wants, the age and condition <strong>of</strong> our infrastructure, the status <strong>of</strong> current<br />

projects, and how we could add the necessary new infrastructure and equipment in the<br />

most cost effective manner.<br />

You will see our estimates for the <strong>City</strong>’s general fund allocation to the <strong>CIP</strong> is fairly<br />

conservative with increases averaging 1.8% over the 5 year period. Technology and<br />

equipment purchases consume the majority <strong>of</strong> this revenue followed by transportation<br />

and street maintenance. Debt service paid by the general fund for the streetscape<br />

improvements, Ross Street Park, and pool improvements consumes an average <strong>of</strong> 35% <strong>of</strong><br />

general fund income right <strong>of</strong>f the top. The remaining amount <strong>of</strong> $6.1 million is what is<br />

left to spend on capital improvements.<br />

We have scaled back significantly in the transportation and street maintenance areas in<br />

order to preserve and target street maintenance dollars to the “The Point” project.<br />

Realignment and signalization <strong>of</strong> the intersection is planned for 2009. This project is<br />

being partially funded by the Ohio Public Works Commission and will address the <strong>City</strong>’s<br />

Point related congestion.<br />

You may recall the state <strong>of</strong> Ohio passed an “economic stimulus” bill in late spring <strong>of</strong> this<br />

year in an effort to spur economic development, growth, and generate jobs throughout the<br />

state. One <strong>of</strong> their targets was increasing funding for several Ohio Public Works<br />

Commission programs. The city has successfully completed several OPWC projects in<br />

the past and was eager to take advantage <strong>of</strong> this opportunity. Of course, these grants<br />

require a <strong>City</strong> commitment <strong>of</strong> funds as a match. The total project cost for all proposed<br />

OPWC projects is $3,437,600 with the <strong>City</strong>’s share being $1,754,447. We have also been<br />

fortunate in the past to receive a $50,000 contribution from the County for each <strong>of</strong> these<br />

projects. We anticipate that commitment to continue. You will see the “Point Phase 1”<br />

project in the Street Maintenance category and the other OPWC projects in the<br />

Transportation <strong>Improvement</strong> category.<br />

The downside to focusing resources on “The Point” in 2009 is a reduction in the <strong>City</strong>’s<br />

resurfacing dollars. Since the <strong>City</strong>’s contribution to the Point is $506,744 this added cost<br />

1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />

1


<strong>City</strong> <strong>of</strong><br />

<strong>Delaware</strong><br />

Ohio<br />

could not be directly absorbed. Therefore, we had to review our options. During our <strong>CIP</strong><br />

discussions we reviewed our resurfacing program and the overall condition <strong>of</strong> our roads.<br />

As you may be aware, the industry standard for gauging the overall condition <strong>of</strong><br />

roadways is the pavement condition index, or PCI. We have included some additional<br />

narrative on the city’s PCI. Overall, the <strong>City</strong>’s road conditions are considered “good”<br />

(68-81 PCI) based on this index. Our goal has been to maintain at least at 70 PCI average<br />

on all our roads. Therefore, city staff felt that by reducing some <strong>of</strong> the resurfacing dollars<br />

in 2009 we could shift this resource to the Point without overly impacting the quality <strong>of</strong><br />

our roadways. This will result in a resurfacing program <strong>of</strong> $226,718 in 2009. In 2010 this<br />

amount will be increased to $798,000 and increase to $850,000 by 2013.<br />

Another important topic in the <strong>CIP</strong> is the <strong>City</strong>’s overall debt position. Currently our total<br />

outstanding debt is $76 million. We have included a complete summary <strong>of</strong> the <strong>City</strong>’s debt<br />

position in the introductory material that outlines our outstanding debt, our annual<br />

payments, and maturity dates. By using debt-financing we have been able to add<br />

substantial infrastructure to the <strong>City</strong> such as a new wastewater treatment facility, the<br />

Southeast Highland Sewer, sections <strong>of</strong> Glenn Road, and a new Public Works facility and<br />

Justice Center Expansion. These investments were necessary given the <strong>City</strong>’s expansion<br />

and growth over the years. When development increases we will recoup our investment<br />

from the South East Highland Sewer and Glenn Road through capacity fee income and<br />

community charges, respectively.<br />

Some <strong>of</strong> the new capital investments in the <strong>CIP</strong> that will be financed over the long-term<br />

include the water treatment plant expansion, Hills-Miller transmission line, and the<br />

upground reservoir. These are all out <strong>of</strong> the Water Capacity Fund. The debt for these<br />

projects will be paid from Water Capacity Funds and increases in water rates, given the<br />

current income stream from capacity fees. You will see that projects in the Sewer<br />

Capacity Fund are very limited and are programmed largely in 2009.<br />

One <strong>of</strong> the major equipment purchases in the plan is a $1.25 million ladder truck for the<br />

<strong>City</strong>’s fire department. The current truck was purchased in 1981 and has reached its<br />

useful life. Many <strong>of</strong> the parts for the vehicle are no longer made and/or difficult to find.<br />

The Public Works Department has had to fabricate several parts on the truck in order to<br />

keep it running. This truck cannot be purchased with impact fee funds since it is a<br />

replacement vehicle; therefore the city will purchase it with General Fund money. Our<br />

plan is to lease the truck and make annual interest payments over a 15-year period.<br />

Some <strong>of</strong> the other important topics <strong>of</strong> discussion we will have over the next few weeks is<br />

the disposition <strong>of</strong> revenue from the recent recreation levy, our plan for adding more fire<br />

stations, and issues associated with inflow and infiltration. You will see in the Fire<br />

Impact Fee fund the plan shows construction <strong>of</strong> station #3 and #4 and the annual debt<br />

service requirements to construct these facilities. During our review we will focus on our<br />

1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />

2


<strong>City</strong> <strong>of</strong><br />

<strong>Delaware</strong><br />

Ohio<br />

current need for these stations and our strategic approach. Also, we will discuss the<br />

amount <strong>of</strong> recreation levy dollars that will be available from the levy and the timing and<br />

possible projects that may be funded by this source <strong>of</strong> revenue. As we discuss public<br />

utilities projects we will focus on our current problems with storm water infiltrating our<br />

sewer system and impacting our wastewater operation and how we are addressing this<br />

issue.<br />

As you review the <strong>CIP</strong> you will see that the format <strong>of</strong> the 2009-2013 <strong>CIP</strong> is somewhat<br />

different compared to past years. <strong>City</strong> staff felt the need to include additional information<br />

in this year’s plan to serve as reference material as <strong>City</strong> Council reviews and understands<br />

the issues surrounding this year’s plan. We have included three new sections that we may<br />

have only briefly touched on in the past. These new sections include: Glenn Road; tax<br />

increment financing improvements; and the Project Trust Fund. Given the <strong>City</strong>’s<br />

considerable infrastructure investment in Glenn Road we felt the appropriate forum to<br />

discuss the status <strong>of</strong> the parkway was <strong>CIP</strong> review. During our subsequent <strong>CIP</strong> meetings<br />

we will discuss the details <strong>of</strong> what the <strong>City</strong> has spent on Glenn Road, the current<br />

financing mechanisms in place, and our future strategic and financial plan moving<br />

forward. Given the current state <strong>of</strong> the economy and its effect on the residential housing<br />

market the <strong>City</strong> is taking a cautious and focused spending approach to the Glenn Road<br />

project until future development commitments are made and identifiable sources <strong>of</strong><br />

revenue are apparent. <strong>City</strong> staff will also be discussing projects that are financially<br />

supported by a portion <strong>of</strong> developer contributions deposited into the Project Trust Fund<br />

and the operation <strong>of</strong> this fund. We also want to discuss the city’s involvement with tax<br />

increment financing, what it is, how it works, and what projects are associated with it.<br />

In summary the 2009-2013 <strong>CIP</strong> is an attempt to balance the very important needs <strong>of</strong> a<br />

growing community with its limited resources. Over the course <strong>of</strong> the next several weeks,<br />

city staff and I look forward to reviewing this important proposal with Council.<br />

Yours Sincerely,<br />

R. Thomas Homan<br />

<strong>City</strong> Manager<br />

1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />

3


12 4


2009-2013<br />

CAPITAL IMPROVEMENT PLAN<br />

CITY OF DELAWARE, OHIO<br />

CITY COUNCIL MEMBERS<br />

Windell Wheeler, Mayor<br />

Carolyn Riggle, Vice-Mayor<br />

Andrew Brush<br />

Joe Di Genova<br />

Lisa Keller<br />

Gary Milner<br />

Jim Moore<br />

STAFF<br />

<strong>City</strong> Manager, R. Thomas Homan<br />

Assistant <strong>City</strong> Manager, Allen Rothermel<br />

Finance Director, Dean Stelzer<br />

5


22 6


Executive Summary<br />

<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong> (<strong>CIP</strong>)<br />

<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013<br />

PART I. OVERVIEW<br />

Each annual <strong>CIP</strong> that is adopted covers a five-year period. In 2008, the <strong>City</strong> prepared the<br />

2009-2013 <strong>CIP</strong>. The <strong>CIP</strong> includes a listing <strong>of</strong> all the projects, equipment, land purchases,<br />

and vehicles that departments plan to purchase or construct in each <strong>of</strong> the five years. The<br />

plan also includes detail on available revenue sources to fund the capital expenditures, as<br />

well as explanations on debt levels and debt service commitments. The 2009-2013 <strong>CIP</strong><br />

also includes reference to previously approved projects that are carried forward and their<br />

completion schedules.<br />

The <strong>City</strong> is making strategic efforts with the 2009-2013 <strong>CIP</strong> to establish clear linkages to<br />

all other business plans, budgets, policies, and day-to-day operations and to develop and<br />

implement a strategic approach to capital planning.<br />

Purpose<br />

The <strong>CIP</strong> is a planning document that presents a five-year overview <strong>of</strong> the scheduled<br />

capital projects and equipment needs <strong>of</strong> the <strong>City</strong>. The purpose <strong>of</strong> capital improvement<br />

planning is to review, prioritize and form the link between proposed needs, limited<br />

financial resources, and the guidance in the <strong>City</strong>’s Comprehensive plan, adopted master<br />

plans, and insight from <strong>City</strong> Council and the community. A properly prepared capital<br />

plan is essential to the future financial health <strong>of</strong> the <strong>City</strong> and continued delivery <strong>of</strong><br />

services to citizens and businesses.<br />

<strong>Capital</strong> planning also positions the <strong>City</strong> to react strategically to changing dynamics such<br />

as the economy, new development opportunities, changes in the city’s financial<br />

condition, and unforeseen emergency infrastructure problems. The city’s strategic<br />

reaction involves adjusting project costs, project timelines, and possibly adding additional<br />

projects if necessary.<br />

Definition <strong>of</strong> a <strong>Capital</strong> <strong>Improvement</strong><br />

A capital improvement is a major fiscal expenditure associated with maintaining the<br />

city’s infrastructure. In many cases, these expenditures are project related and typically<br />

are non-recurring. However, in some cases the <strong>City</strong> does dedicate financial resources on a<br />

recurring basis for capital projects such as road resurfacing, IT equipment;<br />

police/fire/public works vehicles; and sidewalk repairs.<br />

7


A capital expenditure differs from operating budget expenditures. Operating expenditures<br />

include personnel expenses, materials and supplies, and small equipment that involve day<br />

to day operations <strong>of</strong> the <strong>City</strong>.<br />

Examples <strong>of</strong> capital improvements include:<br />

- Acquisition <strong>of</strong> land;<br />

- Construction or expansion <strong>of</strong> public facilities, streets, or utility lines;<br />

- Non-recurring rehabilitation <strong>of</strong> a facility;<br />

- Design work or planning study related to an individual project;<br />

- An item that typically has a useful life <strong>of</strong> 5 or more years; and<br />

- Replacement and purchase <strong>of</strong> vehicles<br />

Financial Policies and Guidelines<br />

The city adopted several financial policies and guidelines that serve as a foundation for<br />

capital improvement planning. These policies cover all capital categories in the <strong>CIP</strong>. The<br />

financial policies related to <strong>CIP</strong> planning include the following:<br />

The budget will provide for adequate maintenance and repair <strong>of</strong> capital assets for<br />

their orderly replacement;<br />

The city will develop a five-year capital improvements program on an annual<br />

basis;<br />

The city will enact an annual capital improvement budget based on the multi-year<br />

capital improvements program;<br />

The city will coordinate development <strong>of</strong> the capital improvement budget with<br />

development <strong>of</strong> the operating budget;<br />

The city will confine long-term borrowing to capital improvement projects;<br />

When the city finances capital projects by issuing debt, it will repay the debt<br />

within a period not to exceed the expected useful life <strong>of</strong> the project;<br />

The city will evaluate issuing debt and pay-as-you-go financing to maintain<br />

flexibility for the future;<br />

The city will continually seek to maintain and improve its current bond rating to<br />

minimize borrowing costs and to ensure that access to credit is preserved.<br />

<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong>ning Process<br />

The <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>’s process <strong>of</strong> preparing the annual <strong>CIP</strong> involves the following<br />

departments: Finance, Engineering, Public Works, Public Utilities, Police, Fire, Parks and<br />

8


Recreation, and Information Technology. Prior to the start <strong>of</strong> the annual <strong>CIP</strong> planning<br />

process the Finance Department reviews the city’s financial condition and evaluates the<br />

status <strong>of</strong> projects in the present <strong>CIP</strong> plan. Concurrently, departments are requested to<br />

submit individual project sheets that cover the project’s description and purpose, provide<br />

justification for the project, and detail project cost estimates.<br />

When developing projects departments do the following: 1) assess the needs for new<br />

facilities or upgrades <strong>of</strong> existing facilities and infrastructure; 2) review current<br />

regulations and compliance; 3) translate needs into prioritized project proposals and<br />

develop cost estimates; 4) review existing master plans; and 5) develop financing<br />

strategies.<br />

As departments develop their annual <strong>CIP</strong> submission they are asked to provide a<br />

summary <strong>of</strong> their project requests and their strategic approach. This involves<br />

summarizing how their projects achieve and align with the long-term goals <strong>of</strong> the<br />

community, the recommendations <strong>of</strong> adopted master plans, and how their strategies<br />

address their short-term initiatives that result from operating in a dynamic environment.<br />

9


34 10


PART II. FINANCIAL SUMMARY<br />

Revenues<br />

Projects in the <strong>CIP</strong> are funded from a variety <strong>of</strong> sources including general fund income<br />

tax revenues, gas tax revenues, grants, utility fees as well as other revenue sources. The<br />

<strong>CIP</strong>’s general fund allocation was approximately $1.63 million in 2008. In 2009 the<br />

allocation is $1.7 million, 4.2% higher.<br />

Chart 1.<br />

General Fund Income Tax Transfer to the <strong>CIP</strong><br />

$2,000,000<br />

$1,800,000<br />

$1,600,000<br />

$1,400,000<br />

$1,200,000<br />

$1,000,000<br />

$800,000<br />

$600,000<br />

$400,000<br />

$200,000<br />

$0<br />

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013<br />

est. est. est. est.<br />

Over the 5 year period from 2009-2013, the total planned general fund allocation is $6.07<br />

million. In 2009, as with all years in the <strong>CIP</strong>, the majority <strong>of</strong> city income tax supports<br />

equipment replacement and technology improvements. Equipment replacement includes<br />

vehicles for the Police, Fire, Parks and Recreation, Airport, and Public Works<br />

departments. This can be seen in both Charts 2 and 3 below. Technology improvements<br />

largely include annual computer and copier replacements, network improvements and<br />

dollars allocated for fiber infrastructure.<br />

Chart 2.<br />

2009 General Fund Allocation to the <strong>CIP</strong><br />

Technology<br />

<strong>Improvement</strong>s<br />

20%<br />

Building<br />

Maintenance<br />

6%<br />

Airport<br />

<strong>Improvement</strong>s<br />

6%<br />

Street Maintenance<br />

16%<br />

Equipment<br />

Replacement<br />

31%<br />

Park <strong>Improvement</strong>s<br />

0%<br />

Transportation<br />

<strong>Improvement</strong>s<br />

21%<br />

11


Chart 3.<br />

Total General Fund Allocation to the <strong>CIP</strong> 2009-2013<br />

900,000<br />

800,000<br />

700,000<br />

600,000<br />

500,000<br />

400,000<br />

300,000<br />

2009<br />

2010<br />

2011<br />

2012<br />

2013<br />

200,000<br />

100,000<br />

0<br />

Airport<br />

<strong>Improvement</strong>s<br />

Street<br />

M aintenance<br />

Transportation<br />

<strong>Improvement</strong>s<br />

Park<br />

<strong>Improvement</strong>s<br />

Equipment<br />

Replacement<br />

Technology<br />

<strong>Improvement</strong>s<br />

Building<br />

M aintenance<br />

Expenditures<br />

Chart 4 below shows <strong>CIP</strong> expenditures by fund for all projects across all funds, including<br />

the general fund. Note in this table total project expenditures do not include debt service<br />

payments in order for the reader to see what costs are actually spent on projects and<br />

equipment. Chart 4 also shows that water fund capacity projects comprise a large<br />

majority <strong>of</strong> the project dollars in the five-year plan. This is due to the planned expansion<br />

<strong>of</strong> the water treatment plant. Also across the five-year period notable expenditures are in<br />

the transportation improvement category. This is due primarily for planned expenditures<br />

for the Veteran’s Parkway road project – design which started in 2008.<br />

Chart 4.<br />

2009-2013 CAPITAL IMPROVEMENT PLAN SUMMARY<br />

*Excludes Debt Service in total Expenditures<br />

FUND 2009 2010 2011 2012 2013<br />

Airport <strong>Improvement</strong> Fund 1,155,745 240,745 460,745 1,195,745 1,415,745<br />

Street Maintenance and Repair Fund 1,514,118 1,183,600 1,208,529 1,235,000 1,235,000<br />

Transportation <strong>Improvement</strong>s 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />

Park <strong>Improvement</strong> Fund 315,000 52,200 29,000 32,500 25,000<br />

Equipment Replacement Fund 206,200 815,500 813,500 586,000 896,500<br />

Technology <strong>Improvement</strong>s 177,000 347,000 262,000 287,000 212,000<br />

Building Maintenance 51,100 106,300 54,500 25,200 0<br />

Park Impact Fee <strong>Improvement</strong> Fund 5,000 20,000 0 0 0<br />

Police Impact Fee <strong>Improvement</strong> Fund 0 65,000 0 0 0<br />

Fire Impact Fee <strong>Improvement</strong> Fund 100,000 208,750 0 0 0<br />

Municipal Services Impact Fee Fund 0 0 0 0 0<br />

Water Fund Maintenance Projects 8,375,000 11,300,000 2,200,000 200,000 200,000<br />

Water Fund Capacity Projects 1,355,000 680,000 10,915,000 175,000 785,000<br />

Sewer Fund Maintenance Projects 365,000 625,000 150,000 605,000 690,000<br />

Sewer Fund Capacity Projects 890,000 150,000 3,000,000 0 0<br />

12


Refuse Fund 457,476 428,876 470,276 466,276 436,276<br />

Storm Sewer Fund 360,000 460,000 770,000 540,000 460,000<br />

TOTAL PROJECT<br />

EXPENDITURES 16,370,339 $20,404,971 $20,433,550 $11,597,721 $50,916,521<br />

Chart 5 below shows what percentage <strong>of</strong> the <strong>CIP</strong> in 2009 goes for street maintenance and<br />

transportation improvements. The majority <strong>of</strong> funding for street maintenance comes from<br />

license taxes and motor fuel taxes. The monies are used for general maintenance on the<br />

<strong>City</strong>’s roads as well as the sidewalk repair program. A large portion <strong>of</strong> funding for<br />

transportation improvements also comes from Ohio Department <strong>of</strong> Transportation<br />

(ODOT) funds, Mid-Ohio Regional <strong>Plan</strong>ning Commission (MORPC) allocations, and<br />

federal earmarks.<br />

Chart 5.<br />

2009 <strong>CIP</strong> Funding for Street Maintenance & Transportation<br />

<strong>Improvement</strong>s<br />

Street <strong>Improvement</strong>s<br />

35%<br />

Street Resurfacing<br />

Program<br />

Issue II<br />

11%<br />

<strong>Improvement</strong>s<br />

15%<br />

Other <strong>Improvement</strong>s<br />

10%<br />

MORPC<br />

Transportation<br />

<strong>Plan</strong>ning<br />

29%<br />

Chart 6 below shows the <strong>City</strong>’s planned allocation <strong>of</strong> resurfacing dollars over the 5-year<br />

period. In 2009 the allocation is considerably less that the out-years in order to target<br />

more street maintenance dollars to the Point – Phase 1 project.<br />

Chart 6.<br />

Resurfacing Dollars 2009-2010<br />

900,000<br />

800,000<br />

700,000<br />

600,000<br />

500,000<br />

400,000<br />

300,000<br />

200,000<br />

100,000<br />

0<br />

2009 2010 2011 2012 2013<br />

Resurfacing Dollars<br />

13


Chart 7 shows transportation and street maintenance funds from 2009 to 2013. The chart<br />

shows MORPC funding increasing from 2009 to 2013 due to the Veteran’s Parkway<br />

project. Issue II projects that the <strong>City</strong> will be undertaking in 2009 include the Point Phase<br />

1 and the US-36 & Houk turn lane improvement project.<br />

Chart 7.<br />

Transportation and Street Funding<br />

2009-2013<br />

*Does not include funding for Veteran's Parkway Construction<br />

3,500,000<br />

3,000,000<br />

2,500,000<br />

2,000,000<br />

1,500,000<br />

1,000,000<br />

500,000<br />

-<br />

2009 2010 2011 2012 2013<br />

Street Resurfacing Program<br />

Issue II <strong>Improvement</strong>s<br />

M ORPC Transportation <strong>Plan</strong>ning<br />

Other <strong>Improvement</strong>s<br />

Street <strong>Improvement</strong>s<br />

The Police and Fire Impact Fee Funds are supported by impact fees charged per<br />

development unit. These fees provide funding for vehicles, special equipment, and debt<br />

service on capital construction projects. The <strong>CIP</strong> shows from 2011-2013 dollars being<br />

allocated for debt service for the construction <strong>of</strong> additional fire station #3 and #4. No<br />

decision on future construction or location <strong>of</strong> these fire stations has been made. As seen<br />

in Chart 8 below, police impact fee expenditures over the years are estimated to be fairly<br />

steady. This is due to approximately $88,000 in funds being allocated to pay the debt<br />

service on the Justice Center renovation.<br />

Chart 8.<br />

2009-2013 Funding<br />

Police Impact Fee Fund & Fire Impact Fee Fund<br />

350,000<br />

300,000<br />

250,000<br />

200,000<br />

150,000<br />

100,000<br />

50,000<br />

0<br />

2009 2010 2011 2012 2013<br />

Fire<br />

Police<br />

Over the 2009-2013 period, the revenue in the Water Capacity Fund will begin service<br />

primarily debt obligations from projects such as the water treatment plant expansion,<br />

14


Kingman hill water tower, and the Westside transmission line. Though these are<br />

important projects looking in the future there is very little funding for projects unless<br />

development picks up and the city sees and increase in capacity fee revenue. This can be<br />

seen in Chart 9 below. Three large projects programmed out <strong>of</strong> this fund, mainly in 2009<br />

and 2010, are the Penry Road waterline projects, west side transmission line project, and<br />

the water treatment plant expansion. The case is the same for the Sewer Capacity Fund<br />

where the majority <strong>of</strong> revenues coming into the fund are going to service debt rather than<br />

projects. Very few projects are programmed in this fund over the 2009-2013 period given<br />

this dynamic.<br />

Chart 9.<br />

Water Fund Capacity Revenues and Expenditure 2009-2013<br />

14,000,000<br />

12,000,000<br />

10,000,000<br />

8,000,000<br />

6,000,000<br />

4,000,000<br />

2,000,000<br />

0<br />

2009 2010 2011 2012 2013<br />

Revenues 9,205,000 12,187,500 3,562,500 1,757,500 1,772,500<br />

Expenditures -Debt 239,405 240,805 1,731,791 1,732,791 1,732,791<br />

Expenditures -Projects 8,375,000 11,300,000 2,200,000 200,000 200,000<br />

Revenues Expenditures -Debt Expenditures -Projects<br />

15


PART III. GUIDING STRATEGIES<br />

Streets and Transportation<br />

Resurface city streets using a 70/30 split approach - 70% is applied to mill and fill<br />

and overlays and 30% is applied toward crack seal, slurry seal, and rejuvenator<br />

coatings.<br />

Maintain all arterial roadways, collectors, and local roadways at 70 PCI<br />

(Pavement Condition Index) or above.<br />

Upgrade all public sidewalks intersecting with roads scheduled to be resurfaced to<br />

current American Disabilities Act (ADA) standards which require access for the<br />

physically impaired.<br />

Use the Thoroughfare <strong>Plan</strong> and the <strong>City</strong>’s Comprehensive <strong>Plan</strong> as a guiding vision<br />

and source <strong>of</strong> several street and transportation projects.<br />

Pursue additional funding both locally and through the state and federal<br />

government.<br />

Assess the current street infrastructure by monitoring the pavement condition<br />

index (PCI) as a baseline, conducting windshield surveys, and monitoring where<br />

ongoing road maintenance efforts and condition changes.<br />

Maintain and improve upon the city current “good” PCI rating <strong>of</strong> (68-81).<br />

Implement the use <strong>of</strong> intermediate pavement maintenance operations such as<br />

slurry seals and asphalt rejuvenator applications to extend the estimated life<br />

expectancy <strong>of</strong> the pavement surface.<br />

Monitor input from citizen surveys related to road infrastructure and work to<br />

alleviate traffic congestion and maintain streets.<br />

Limit the use <strong>of</strong> MORPC funds to fund major federal and state route highway<br />

projects.<br />

Municipal Airport<br />

Promote the economic benefit <strong>of</strong> aviation to the community and strive for self<br />

sustaining operations.<br />

Work to increase the number <strong>of</strong> based aviation businesses and corporate general<br />

aviation aircrafts utilizing the airfield.<br />

Use the city’s $150,000 annual entitlement funds from the FAA and roll any<br />

unused balances into future years for up to 3 years.<br />

Continue seeking FAA State <strong>of</strong> Ohio apportionment funds (via ODOT) for<br />

general aviation projects.<br />

Consider future applications to ODOT’s $2 million state aviation grant program.<br />

Continue administering an airport TIF fund that accounts for the tax increment<br />

financing real estate payments the city receives from property taxes paid in the<br />

corporate hanger and the private T-hangers constructed at the airport.<br />

17


Implement the recommendations <strong>of</strong> the Airport Master <strong>Plan</strong> which include high<br />

priority projects such as expanding the existing apron, constructing T-hangers,<br />

and acquiring land for airport development.<br />

Focus on establishing protection areas to insure continued use <strong>of</strong> the airfield in the<br />

future.<br />

Seek funding for additional security fencing to protect both public and private<br />

investments as well as reduce wildlife runway incursions.<br />

Continue working on development <strong>of</strong> a drainage master plan that will be required<br />

by existing storm water regulations to support any additional expansions at the<br />

airport.<br />

Building Maintenance<br />

Continue heat pump replacements at the Justice Center based on industry standard<br />

life cycles.<br />

Reduce facility energy consumption.<br />

Continue to consider centralizing all building maintenance functions so as to<br />

minimize operation resources and establish consistent practices throughout<br />

facility infrastructure.<br />

Equipment Replacement<br />

Maintain and disposal <strong>of</strong> the majority <strong>of</strong> city vehicles, trailers and motorized<br />

equipment.<br />

Ensure all department vehicles and motorized equipment are operational and safe<br />

so that they provide routine and emergency services to citizens.<br />

Administer a preventive maintenance program and provide specification services<br />

for new equipment.<br />

Operate a rotary fund and bill city departments for vehicle services rendered;<br />

parts, fuel and materials supplied; and overhead.<br />

Maintain a vehicle replacement schedule that details the original purchase date,<br />

replacement year schedule, and estimated replacement year cost.<br />

Continued consideration <strong>of</strong> a comprehensive review <strong>of</strong> the entire fleet inventory<br />

to determine if departmental fleet sizes are greater than required to provide<br />

current services.<br />

Continued consideration <strong>of</strong> standardizing fleet purchases to assist in reducing<br />

organization fuel consumption, parts inventory, and mechanic training demands.<br />

Parks and Recreation<br />

Focus on construction <strong>of</strong> Glen Ross Park.<br />

Focus on neighborhood park improvements.<br />

Target general fund dollars for parking lot resurfacing in Mingo, Eastside, and<br />

Smith Park.<br />

18


Use the majority <strong>of</strong> park exaction dollars in the early years <strong>of</strong> the <strong>CIP</strong> plan given<br />

the potential for declining exaction fees considering the current development<br />

climate.<br />

Impact Fee Projects<br />

Collect and spend impact fees in accordance with the <strong>City</strong>’s ordinance and be<br />

aware <strong>of</strong> remaining collections that are close to the 5-year rebate provision.<br />

Make required debt service payments in each fund and be aware that without<br />

increasing development levels General Fund dollars may eventually be needed to<br />

cover these payments.<br />

Public Utilities<br />

Consider project finance options from Ohio Public Works Commission (OPWC)<br />

and the Ohio Water Development Authority (OWDA).<br />

Prioritize water and sewer mains rehabilitation and replacement projects through<br />

the CMMS <strong>City</strong>Works s<strong>of</strong>tware.<br />

Improve fire flow protection by installing 8” minimum water mains in new<br />

developments and replacing existing lines <strong>of</strong> less than 8” when water mains are in<br />

need <strong>of</strong> replacement or upgrades.<br />

Continue small main replacements to improve water quality issues and dead end<br />

water mains by looping water mains in areas that have been determined to have<br />

water quality issues.<br />

Flush dead end water mains to ensure water quality.<br />

Prioritize projects based on those identified in the 2000 Collection System Master<br />

<strong>Plan</strong>, 1986 Water System Master <strong>Plan</strong> Study, the 2006 Water Master <strong>Plan</strong>, the<br />

1998 Storm Sewer Task Force Report/Recommendations, from CCTV data, and<br />

from flooding/basement backup complaints.<br />

Complete the 5 remaining fire flow improvement projects identified in the 1986<br />

Water Master <strong>Plan</strong>.<br />

Meet the sanitary sewer needs for future development.<br />

Provide extension <strong>of</strong> water and sewer mains to the <strong>City</strong>’s southwest corridor to<br />

help facilitate commercial and industrial development.<br />

Take a proactive approach to identifying future water supply and resources<br />

Meet USEPA Stage 2 Disinfectants and Disinfection Byproducts Rule compliance<br />

by October 1, 2013 by upgrading the water treatment plant rehabilitation and<br />

using membrane plant technology.<br />

Consider the cost associated with the construction <strong>of</strong> new sewer lines and related<br />

facilities, such as lift stations and force mains – and how much <strong>of</strong> this cost will be<br />

borne by developers.<br />

Consider the extension <strong>of</strong> new public sewers to new development areas and the<br />

<strong>City</strong>’s ability to provide required city services to the new areas.<br />

Comply with the OEPA MS4 Permit.<br />

19


Minimize leachate from the closed landfill that enters the storm water pipe<br />

through the pipe joints in order to minimize notice <strong>of</strong> violations from the EPA.<br />

Information Technology<br />

Provide system support for all <strong>City</strong> Departments by determining IT needs,<br />

capabilities, and feasibility.<br />

Coordinate the purchasing, installation, upgrading and monitoring <strong>of</strong> all<br />

information technology s<strong>of</strong>tware and hardware.<br />

Maintain an IT rotary fund where each department contributes a determined<br />

amount based on their IT usage and demands.<br />

Maintain a 5-year server replacement schedule and 7-year network equipment<br />

replacement schedule.<br />

Produce bigger servers, but divide the use <strong>of</strong> the servers into virtual servers,<br />

capable <strong>of</strong> providing more capacity in fewer machines.<br />

Maintain a data back plan to keep personal information private, have the<br />

capability to recover deleted files, and recover files in the event <strong>of</strong> a disaster.<br />

Maintain a 4-year PC replacement schedule in order to keep productivity as high<br />

as possible from a technology point <strong>of</strong> view.<br />

Purchase a combination <strong>of</strong> PCs and Servers/thin client computers within the PC<br />

replacement line item.<br />

Build a city-wide fiber infrastructure for use by the <strong>City</strong> and as an economic<br />

development tool<br />

Continue the plan <strong>of</strong> purchasing and maintaining technology copiers.<br />

20


CITY OF DELAWARE<br />

CAPITAL IMPROVEMENT PLAN<br />

GENERAL FUND SUMMARY<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCE FORWARD 50,000 320,202 151,667 9,003 10,196<br />

REVENUES:<br />

INCOME TAX 1,700,000 1,737,500 1,770,000 1,815,000 1,800,000<br />

BALANCE PLUS REVENUE 1,750,000 2,057,702 1,921,667 1,824,003 1,810,196<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Bonds<br />

2002 Issue ($5,655,000) 422,428 424,528 425,778 426,287 426,287<br />

2006 Ross St. ($475,000) 61,237 59,438 57,637 60,838 60,838<br />

2006 Pool Maint. ($550,000 10yrs.) 68,276 68,129 67,909 67,621 67,621<br />

TOTAL DEBT SERVICE 551,941 552,095 551,324 554,746 554,746<br />

AMOUNT AVAILABLE FOR CAPITAL<br />

IMPROVEMENTS AFTER DEBT 1,198,059 1,505,607 1,370,343 1,269,257 1,255,450<br />

OTHER EXPENDITURES<br />

AIRPORT IMPROVEMENTS 56,500 10,750 66,750 58,500 69,500<br />

STREET MAINTENANCE 136,768 176,906 189,090 170,561 168,761<br />

TRANSPORTATION IMPROVEMENTS 181,489 175,784 0 0 0<br />

PARK IMPROVEMENTS 0 37,200 14,000 17,500 10,000<br />

EQUIPMENT REPLACEMENT 275,000 500,000 775,000 700,000 765,000<br />

TECHNOLOGY IMPROVEMENTS 177,000 347,000 262,000 287,000 212,000<br />

BUILDING MAINTENANCE 51,100 106,300 54,500 25,500 0<br />

TOTAL OTHER EXPENDITURES 877,857 1,353,940 1,361,340 1,259,061 1,225,261<br />

ENDING BALANCE 320,202 151,667 9,003 10,196 30,189<br />

21


CAPITAL IMPROVEMENT PLAN<br />

AIRPORT IMPROVEMENT FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCE FORWARD 0 0 0 0 0<br />

REVENUES:<br />

FAA AIP Allocation 123,500 204,250 42,750 142,500 71,250<br />

FAA Discretionary Grant 950,000 325,500 969,000 1,249,250<br />

TIF Collections 25,745 25,745 25,745 25,745 25,745<br />

<strong>CIP</strong> - <strong>City</strong> FAA AIP Grant Match 6,500 10,750 2,250 7,500 3,750<br />

<strong>CIP</strong> - <strong>City</strong> FAA Discretionary Grant Match 50,000 64,500 51,000 65,750<br />

TOTAL REVENUES 1,155,745 240,745 460,745 1,195,745 1,415,745<br />

EXPENDITURES:<br />

<strong>City</strong> AIP-Grant<br />

Drainage Master <strong>Plan</strong> 80,000<br />

Drainage <strong>Improvement</strong>s 45,000 150,000<br />

Avigation Survey & Easement - East 130,000<br />

Avigation Survey & Easement - West 135,000<br />

Taxiway A Rehabilitation - East End 75,000<br />

<strong>City</strong> Discretionary-Grant<br />

Airport Rd. Relocation - Sawmill Pkwy. 1,000,000<br />

Ramp Expansion 90,000 900,000<br />

Runway Rehabilitation 120,000 1,315,000<br />

Terminal Building <strong>Improvement</strong>s 300,000<br />

GF Advance Payback 25,745 25,745 25,745 25,745 25,745<br />

TOTAL EXPENDITURES 1,155,745 240,745 460,745 1,195,745 1,415,745<br />

AIRPORT IMPR. FUND BALANCE 0 0 0 0 0<br />

PURPOSE: The Airport <strong>Improvement</strong> <strong>CIP</strong> identifies future improvements to the <strong>Delaware</strong><br />

Municipal Airport.<br />

FUNDING SOURCE: Funding for these projects comes primarily from FAA grant funds.<br />

The FAA AIP grant represents federal aviation funding which has been allocated to general<br />

aviation airports. <strong>Delaware</strong>'s allocation has been $150,000 per year. It is not known how far into<br />

the future this grant funding will be available. This <strong>City</strong> also applies for FAA discretionary grant<br />

funds for airport improvements. We do not currently have any discretionary grant funded projects.<br />

The <strong>City</strong>'s general fund covers our share <strong>of</strong> the grants and other projects that do not receive grant<br />

funding.<br />

23


THIS PAGE INTENTIONALLY LEFT BLANK<br />

24


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Taxiway A East End Rehabilitation<br />

Description and Purpose:<br />

<strong>Improvement</strong>s to the Taxiway A surface and safety area to accommodate<br />

increased aviation traffic.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $0<br />

Final En gineer ing $75,000 $75,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $0<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $0 $0 $0 $75,000 $75,000<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $3,750 $3,750<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A AI P G rant $71,250 $71,250<br />

$0<br />

Totals $0 $0 $0 $0 $75,000 $75,000<br />

25


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Runway 28 Avigational Survey & Easement<br />

Description and Purpose:<br />

Avigational survey & easement on the property to the west (National Limestone)<br />

<strong>of</strong> the runway. This will prevent future construction from entering into flight<br />

path that would have adverse effects on the airport.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO M M ENDE D FUN DIN G<br />

Est im a te d Expe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Tra ff ic $0<br />

Envir on m enta l $0<br />

Prelim in a ry E n gineer ing $0<br />

Fina l En gineer ing $15 ,000 $15,000<br />

R/W Con sulta nt $0<br />

R/W Pur cha se $120 ,000 $120,000<br />

Ad m instra tive $0<br />

Co nstru ctio n $0<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Tota ls $0 $135 ,000 $0 $0 $ 0 $135,000<br />

Sour c e <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $6, 750 $6,750<br />

O th er C ity Fu nds $0<br />

M un icipa l Bon ds $0<br />

Priva te F un din g $0<br />

FA A AI P G ra nt $128 ,250 $128,250<br />

$0<br />

Tota ls $0 $135 ,000 $0 $0 $ 0 $135,000<br />

26


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Navigational Survey & Easement - East<br />

Description and Purpose:<br />

Navigational survey & easement on the property to the east (Jegs) <strong>of</strong> the<br />

runway. This will prevent future construction from entering into flight path<br />

that would have adverse effects on the airport<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic $ 0<br />

E nvir on m ent a l $ 0<br />

P re lim in a ry E n gine er ing $ 0<br />

Fina l E n ginee r ing $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

R / W C on sult a nt $ 0<br />

R / W P ur cha s e $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

Ad m inst ra t ive $ 0<br />

C o nst ru ct io n $ 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 0<br />

C o nst ru ct io n En ginee ring $ 0<br />

In s p ec t ion $ 0<br />

T ot a ls $ 1 3 0 ,0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 3 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 6 ,5 0 0 $ 6 ,5 0 0<br />

O th e r C ity Fu nd s $ 0<br />

M un icip a l B on d s $ 0<br />

P riva t e F un d in g $ 0<br />

FA A AI P G ra nt $ 1 2 3 ,5 0 0 $ 1 2 3 ,5 0 0<br />

$ 0<br />

T ot a ls $ 1 3 0 ,0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 3 0 ,0 0 0<br />

27


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Runway 10-28 Rehabilitation<br />

Description and Purpose:<br />

<strong>Improvement</strong>s to the runway surface and runway safety area to accommodate<br />

increased aviation traffic.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $0<br />

Final En gineer ing $120,0 00 $120,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $1,31 5,000 $1,315, 000<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $0 $0 $120,0 00 $1,31 5,000 $1,435, 000<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $6,00 0 $65,750 $71,750<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A Federal D iscre tio nary $114,0 00 $1,24 9,250 $1,363, 250<br />

$0<br />

Totals $0 $0 $0 $120,0 00 $1,31 5,000 $1,435, 000<br />

28


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Ramp Expansion<br />

Description and Purpose:<br />

Design main ramp expansion to accommodate increased aviation traffic.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $0<br />

Final En gineer ing $90, 000 $90,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $900,0 00 $900,000<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $0 $0 $0 $ 0 $0<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $4, 500 $45,0 00 $49,500<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A Federal D iscre tio nary $85, 500 $855,0 00 $940,500<br />

$0<br />

Totals $0 $0 $90, 000 $900,0 00 $ 0 $990,000<br />

29


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Drainage Master <strong>Plan</strong>/Engineering/Construction<br />

Description and Purpose:<br />

Design Master Drainage <strong>Plan</strong> for current and future expansion needs.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

This plan will ensure that all drainage facilities located on the airfield meet or<br />

exceed FAA criteria. This plan will address the overall drainage issues at the<br />

airport to ensure that any existing development and planned development will<br />

not adversely affect any waterways downstream from the airport property.<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $80 ,000 $80,000<br />

Final En gineer ing $45, 000 $45,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $150,0 00 $150,000<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $80 ,000 $45, 000 $150,0 00 $ 0 $275,000<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $4, 000 $2, 250 $7,50 0 $13,750<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A AI P G rant $76 ,000 $42, 750 $142,5 00 $261,250<br />

$0<br />

Totals $0 $80 ,000 $45, 000 $150,0 00 $ 0 $275,000<br />

30


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Airport Road Relocation – Sawmill Parkway<br />

Description and Purpose:<br />

Design and construction <strong>of</strong> phase-I <strong>of</strong> Sawmill Parkway to address Airport Road<br />

vacating from runway relocation.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

The consultant notes that the original arrangement was to extend the existing<br />

Airport Road to US-42 which was to be funded through an FAA grant. This was<br />

proposed until the Master <strong>Plan</strong> and ALP update was completed and the<br />

disposition <strong>of</strong> the crosswind runway determined. The master plan and ALP<br />

update is not complete. The crosswind runway was eliminated from the ALP<br />

and Airport road is now shown to be relocated south to a new location. This<br />

schedule is to relocate Airport Rd. in 2009/2010. FAA will fund the Airport<br />

Road relocation in an amount equal to the cost to extend Airport Road as<br />

originally planned, which is estimated at $1,000,000.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

P re lim in a ry E n gine er ing $ 0<br />

Fina l E n ginee r ing $ 0<br />

R / W C on sult a nt $ 0<br />

R / W P ur cha s e $ 0<br />

Ad m inst ra t ive $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

C o nst ru ct io n $ 9 9 0 ,0 0 0 $ 9 9 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 0<br />

C o nst ru ct io n En ginee ring $ 0<br />

In s p ec t ion $ 0<br />

T ot a ls $ 1 ,0 0 0 , 0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 ,0 0 0 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

O th e r C ity Fu nd s $ 0<br />

M un icip a l B on d s $ 0<br />

P riva t e F un d in g $ 0<br />

FA A Fed e ra l D is ret ion a ry $ 9 5 0 ,0 0 0 $ 9 5 0 ,0 0 0<br />

$ 0<br />

T ot a ls $ 1 ,0 0 0 , 0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 ,0 0 0 , 0 0 0<br />

31


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Terminal Building <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Expansion <strong>of</strong> existing pilot lounge and install <strong>of</strong> sleep room for pilots, re-side<br />

and re-ro<strong>of</strong> existing building.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Fina l E n gineer ing $ 0<br />

R / W P ur cha se $ 0<br />

Ad m inst ra t ive $ 0<br />

C o nst ru ct io n $ 3 0 0 , 0 0 0 $ 3 0 0 ,0 0 0<br />

In sp ection $ 0<br />

T ot a ls $ 0 $ 0 $ 3 0 0 , 0 0 0 $ 0 $ 0 $ 3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $ 0<br />

FA A Fed era l D iscre tio na ry $ 3 0 0 , 0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s $ 0<br />

P riva t e F un d in g $ 0<br />

Sta te /F ed era l $ 0 $ 0<br />

$ 0<br />

T ot a ls $ 0 $ 0 $ 3 0 0 , 0 0 0 $ 0 $ 0 $ 3 0 0 ,0 0 0<br />

32


CAPITAL IMPROVEMENT PLAN<br />

STREET MAINTENANCE IMPROVEMENTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

REVENUES:<br />

PERMISSIVE TAX (License Fee Fund) 360,000 370,000 380,000 390,000 390,000<br />

STATE LICENSE FEES 17,755 17,755 0 20,000 20,000<br />

STATE GASOLINE TAXES 79,500 79,500 80,000 85,000 85,000<br />

NEW GAS TAXES 340,000 380,000 400,000 410,000 410,000<br />

CDBG BLOCK GRANT (FORMULA FUNDS) 85,000 85,000 85,000 85,000 85,000<br />

SIDEWALK PROGRAM ASSESSMENTS 150,000 150,000 150,000 150,000 150,000<br />

ISSUE II POINT PHASE 1 370,656 0 0 0 0<br />

COUNTY ISSUE II POINT 50,000 0 0 0 0<br />

<strong>CIP</strong> Allocation 136,768 176,906 189,090 170,561 168,761<br />

TOTAL REVENUE 1,589,679 1,259,161 1,284,090 1,310,561 1,308,761<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Bonds - S. Houk Road ($600,000, 10yrs) 75,561 75,561 75,561 75,561 73,761<br />

TOTAL DEBT SERVICE 75,561 75,561 75,561 75,561 73,761<br />

STREET RESURFACING PROGRAM<br />

CDBG Rehabilitation 85,000 85,000 85,000 85,000 85,000<br />

<strong>City</strong> Street Resurfacintg/Maintenance 226,718 798,600 823,529 850,000 850,000<br />

TOTAL STREET RESURFACING PROGRAM 311,718 883,600 908,529 935,000 935,000<br />

STREET IMPROVEMENTS<br />

Point Phase 1 927,400 0 0 0 0<br />

TOTAL STREET IMPROVEMENTS 927,400 0 0 0 0<br />

OTHER IMPROVEMENTS<br />

CSX <strong>Improvement</strong> (Crossing Pavement)<br />

Traffic Signalization 50,000 50,000 50,000 50,000 50,000<br />

Sidewalk and ADA access 25,000 50,000 50,000 50,000 50,000<br />

Sidewalk Program <strong>City</strong> Repairs 50,000 50,000 50,000 50,000 50,000<br />

Sidewalk Program Property Owner Repairs 150,000 150,000 150,000 150,000 150,000<br />

TOTAL OTHER IMPROVEMENTS 275,000 300,000 300,000 300,000 300,000<br />

TOTAL EXPENDITURES 1,589,679 1,259,161 1,284,090 1,310,561 1,308,761<br />

33


THIS PAGE INTENTIONALLY LEFT BLANK<br />

34


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Sidewalk Program<br />

Description and Purpose:<br />

Repair & replacement <strong>of</strong> existing sidewalks in various sections <strong>of</strong> the<br />

community through an annual sidewalk capital program initiative.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

Repairs are required, per city code section 909, by property owners; however<br />

the city can completed the repairs at the election <strong>of</strong> the property owner, and<br />

invoice the property owner for the cost <strong>of</strong> the work.<br />

Pictures and Drawings:<br />

35


Recommended Funding:<br />

Reimbursement to the city is either by direct payment, an agreed upon<br />

payment plan, or by tax assessment if required for uncooperative property<br />

owners.<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

Sid ew a lk & A DA A ccess $ 2 5 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 2 5 ,0 0 0<br />

Sid ew a lk P rg m C it y R ep a irs $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

Sid ew a lk P rg m P r op O w ner $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0<br />

T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d<br />

Sid ew a lk P ro gr am As sm nt s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0<br />

O th er C ity Fu nd s $ 7 5 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 4 7 5 ,0 0 0<br />

P riv at e F un d ing<br />

St a t e/ Fed era l<br />

T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0<br />

36


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Annual Street Resurfacing<br />

Description and Purpose:<br />

Annual program to maintain the surface course <strong>of</strong> pavement through mill & fill,<br />

overlay, slurry seal, and asphalt rejuvenator applications to select city streets.<br />

Without adequate funding, the focus <strong>of</strong> the program continues to be on<br />

preventative maintenance processes on local streets, deferring necessary<br />

surface course replacement until future years.<br />

Department:<br />

Engineering Services & Public Works<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

License Fee (Fund 202)<br />

Inflow/Infiltration (Fund 541)<br />

Justification:<br />

To improve the integrity <strong>of</strong> city streets for the safety <strong>of</strong> the traveling public, and<br />

to protect the city from unaffordable projects that involve total replacement <strong>of</strong><br />

roadways that results from the lack <strong>of</strong> adequate preventative maintenance<br />

operations.<br />

Pictures/Images<br />

37


Recommended Funding:<br />

It is recommended that the funding for this program be gradually increased to<br />

a level that coincides with the calculated amount necessary to properly<br />

maintain the city street network as a whole (according to the city’s pavement<br />

maintenance s<strong>of</strong>tware and recommendations from experts). Small percentage<br />

<strong>of</strong> funding is recommended to come from Fund 541 for manhole casting<br />

improvements that are traditionally made part <strong>of</strong> this project.<br />

R EC OM M EN D ED F UN D IN G<br />

Es tim a te d Expe nditure s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls<br />

Res urfacing P ro gram $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />

To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />

S o urc e o f F unds 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls<br />

General Fund<br />

CDBG Rehabilitatio n $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 425,000<br />

Other <strong>City</strong> Funds /Gas Tax $ 226,718 $ 798,600 $ 823,529 $ 850,000 $ 850,000 $ 3,548,847<br />

P rivate Funding<br />

State/Federal<br />

To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />

38


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Annual Traffic Signalization <strong>Improvement</strong>s<br />

Description and Purpose:<br />

The traffic signalization program provides annual funding for major signal<br />

equipment upgrades and installations for the over 58 existing and proposed<br />

signalized intersection locations in the city.<br />

Department:<br />

Public Works & Department <strong>of</strong> Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

Advances upgrades to signal system equipment including L.E.D. bulb<br />

changeover, battery back-up installation, and closed loop interconnect<br />

improvements.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E s tim a te d E x p e n d itu r e s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />

T r a ffic S ig n a liz a tio n $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

S o u r c e o f F u n d s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />

C a p ita l Im p r o v e m e n ts $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

39


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

The Point Intersection - Phase I <strong>Improvement</strong>s<br />

Description and Purpose:<br />

This project is Phase I <strong>of</strong> a two phase project. It consists <strong>of</strong> the realignment <strong>of</strong><br />

SR 37 in the eastbound direction to a proposed intersection on US 36<br />

approximately 300 feet west <strong>of</strong> the existing US 36/SR 37 “The Point”<br />

intersection. As part <strong>of</strong> the realignment, an eastbound left turn lane will be<br />

included for EBLT to Moore Street. The newly configured intersection on US 36<br />

will include the installation <strong>of</strong> a mast arm traffic signal, which will replace the<br />

existing traffic signal located at the existing intersection. The intersection will<br />

also include the alignment <strong>of</strong> a future public road (south leg <strong>of</strong> the intersection)<br />

along with the necessary widening on US 36 to install a westbound left turn<br />

lane.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

OPWC Round 23/24 S<strong>CIP</strong>/LTIP grant for 44%<br />

$50,000 County Engineer Funds<br />

Pictures/Images:<br />

40


Justification:<br />

The existing intersection operates at a LOS <strong>of</strong> E and has an intersection delay<br />

<strong>of</strong> 69.2 seconds during the peak hours. With these improvements, the LOS will<br />

improve to a C and the intersection delay will be reduced to 29.1 seconds<br />

during the peak hours. The 95 th % Queue Length for westbound US 36/SR 37<br />

will be reduced from 1175’ to 400’ and for eastbound SR 37 it will be reduced<br />

from 720’ to 500’. The installation <strong>of</strong> the traffic signal at the newly configured<br />

intersection to the west and the removal <strong>of</strong> the existing traffic signal at the<br />

existing intersection will provide additional westbound US 36 stacking allowing<br />

for the free flow <strong>of</strong> the westbound SR 37 traffic during most hours <strong>of</strong><br />

operation. The improvements will also provide a signalized access point along<br />

with a left turn lane for ODOT, the <strong>City</strong> Public Works Facility, future business<br />

property, and a future public street connection.<br />

Recommended Funding:<br />

Project was submitted for OPWC Round 23/24 S<strong>CIP</strong>/LTIP grant funding<br />

assistance. Requested OPWC amount funding is 44% <strong>of</strong> project cost.<br />

<strong>Delaware</strong> County has verbally committed $50,000 towards the project.<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

T ra ff ic<br />

E nv ir on m ent a l<br />

P relim in a ry E n gine ering<br />

Fina l E n gineer ing $ 8 5 ,0 0 0 $ 8 5 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha se $ 5 ,0 0 0 $ 5 ,0 0 0<br />

Ad m instra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />

C o nst ru ction $ 6 9 7 ,0 0 0 $ 6 9 7 ,0 0 0<br />

C h an ge O r d er/ C o nt ing enc y $ 6 9 ,7 0 0 $ 6 9 ,7 0 0<br />

C o nst ru ction E ngin eering $ 1 7 ,4 2 5 $ 1 7 ,4 2 5<br />

In sp ect ion $ 5 2 ,2 7 5 $ 5 2 ,2 7 5<br />

T ot a ls $ 9 2 7 ,4 0 0 $ 9 2 7 ,4 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d<br />

O th er C ity Fu nd s $ 5 0 6 ,7 4 4 $ 5 0 6 ,7 4 4<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l $ 3 7 0 ,6 5 6 $ 3 7 0 ,6 5 6<br />

In H ou se (E ng ineer in g) $ 0<br />

C o un ty Fu nd s $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

T ot a ls $ 9 2 7 ,4 0 0 $ 9 2 7 ,4 0 0<br />

42


CAPITAL IMPROVEMENT PLAN<br />

TRANSPORTATION IMPROVEMENTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

REVENUES:<br />

<strong>CIP</strong> ALLOCATION 181,489 175,784 0 0 0<br />

COUNTY CONTRIBUTION - ISSUE II 50,000 50,000 0 0 0<br />

STATE ISSUE II<br />

Belle Avenue Intersection<br />

US36/Houk Rd. Turn Lane <strong>Improvement</strong>s 160,151<br />

William/Cheshire/Channing Intersection 27,060 221,216<br />

US23/SR315 INTERSECTION<br />

ODOT 25,000 125,000 100,000 250,000 1,611,000<br />

MORPC ALLOCATION<br />

US 23/Pennsylvania Interchange 200,000 150,000 0 0 0<br />

VETERAN'S PARKWAY<br />

Federal Funds 400,000 3,000,000 6,000,000 42,950,000<br />

TOTAL REVENUE 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />

EXPENDITURES:<br />

MORPC TRANSPORTATION PLANNING<br />

Veteran's Parkway - Alt. 16 400,000 3,000,000 6,000,000 42,950,000<br />

US23/Pennsylvania Intersection 200,000 150,000 0 0 0<br />

DEVELOPMENT IMPROVEMENT PROJECTS<br />

GRADY BLVD. IMPROVEMENTS 0<br />

Intersection <strong>Improvement</strong>s 0<br />

ISSUE II IMPROVEMENTS<br />

BELLE AVENUE INTERSECTION<br />

US36/HOUK RD. TURN LANE IMPROVEMENTS 357,200<br />

WILLIAM & CHESHIRE/CHANNING INTERSECT. 61,500 447,000<br />

CHANNING ST. INTERSECTION 0 0 0<br />

OLENTANGY ST. INTERSECTION/BIKE PATH 0 0 0<br />

US 36 CURTIS ST. TURN LANE INTERSECTION 0 0<br />

US 23/SR 315 INTERSECTION 25,000 125,000 100,000 250,000 1,611,000<br />

TOTAL EXPENDITURES 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />

PURPOSE: The Transportation <strong>Improvement</strong> <strong>CIP</strong> identifies future improvements/expansion <strong>of</strong> the<br />

<strong>City</strong>'s public works infrastructure.<br />

FUNDING SOURCE: Funding for these projects comes primarily from the Federal and State<br />

governments in the form <strong>of</strong> grants and allocated federal and state revenues. The <strong>City</strong>'s matching<br />

contributions and funding for projects not receiving grant funding comes from the same sources<br />

used for street maintenance projects.<br />

43


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 36 & Houk Road Turn Lane <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Construction <strong>of</strong> dedicated southbound right turn lane and lengthening <strong>of</strong> the<br />

existing southbound left turn lane on Houk Road at US-36. Project involves<br />

widening <strong>of</strong> an existing culvert and signal modifications to accommodate the<br />

new lane configuration.<br />

Department:<br />

Engineering Services<br />

Fund and Account:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

OPWC LTIP Grant ($160,151)<br />

<strong>Delaware</strong> County Engineer ($50,000)<br />

Justification:<br />

Project was prioritized based on previous <strong>City</strong> Council concerns over this<br />

intersection. The project has been awarded OPWC LTIP Grant funds for design<br />

and construction.<br />

Recommended Funding:<br />

Funding was awarded by OPWC LTIP grant for this project in Round 22 (2008),<br />

in addition to a contribution from the County. Final engineering for the project<br />

commenced in 2008. Recommended funding slightly higher than OPWC<br />

estimates in an attempt to cover anticipated rise in material prices.<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Fina l E n ginee r ing $ 5 ,0 0 0 $ 5 ,0 0 0<br />

R / W P ur cha s e $ 3 ,7 0 0 $ 3 ,7 0 0<br />

Ad m inst ra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />

C o nst ru ct io n $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 3 0 ,0 0 0 $ 3 0 ,0 0 0<br />

C o nst ru ct io n En ginee ring $ 2 ,5 0 0 $ 2 ,5 0 0<br />

In s p ec t ion $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

T ot a ls $ 3 5 7 ,2 0 0 $ 3 5 7 ,2 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

O th e r C ity Fu nd s $ 1 4 7 ,0 4 9 $ 1 4 7 ,0 4 9<br />

Sta te /F ed e ra l $ 1 6 0 ,1 5 1 $ 1 6 0 ,1 5 1<br />

D e law a re C ou nt y $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

T ot a ls $ 3 5 7 ,2 0 0 $ 3 5 7 ,2 0 0<br />

45


Pictures and Drawings:<br />

46


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 36 & Cheshire-Channing Intersection <strong>Improvement</strong>s<br />

Description and Purpose:<br />

The project involves widening US 36 to provide left turn lanes for traffic from<br />

US 36 westbound to Ann Street and Cheshire Street and US 36 eastbound to<br />

Channing Street. Also included is the conversion <strong>of</strong> Channing Street to “oneway”<br />

to the north and the establishment <strong>of</strong> a dedicated bus loading zone on the<br />

east side <strong>of</strong> Channing Street for the adjacent school. The traffic signal at Ann<br />

Street will be removed and a new mast arm signal will be installed at Cheshire<br />

Street and coordinated with an updated mast arm signal at Channing Street.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

OPWC S<strong>CIP</strong>/LTIP Grant Funding (44% <strong>of</strong> construction)<br />

$50,000 County Engineer Funds<br />

Justification:<br />

Recent traffic analysis indicates that a signal is warranted at US 36 and<br />

Cheshire Street and a signal is no longer warranted at US 36 and Ann Street.<br />

Left turn movements from US 36 to both Cheshire Street and Channing Street<br />

obstruct through traffic movements, especially during the peak traffic hours.<br />

Travel direction and access changes along Channing Street, between US 36<br />

and Winter Street, are included to improve the safety <strong>of</strong> the school bus loading<br />

zone and the signal operation at US 36. Most importantly, with the<br />

consideration <strong>of</strong> other roadway improvements to The Point, the traffic demand<br />

on this intersection will be greater.<br />

Pictures and Drawings: See drawing on next page<br />

47


Recommended Funding:<br />

The project was submitted for OPWC S<strong>CIP</strong>/LTIP Round 23/24 grant funding<br />

assistance. Requested amount <strong>of</strong> funding is $221,216. <strong>Delaware</strong> County has<br />

verbally committed $50,000 towards the project.<br />

R E C O MM E N D E D F U N D IN G<br />

E st im a t e d E x p e nd it ur e s 2 00 9 20 10 20 11 201 2 2 01 3 To t als<br />

T ra f f ic<br />

E n vi r on m ent al<br />

P re li m ina r y E n gi nee r ing<br />

F in a l E ng in eer in g $ 6 0 ,0 0 0 $ 6 0 , 0 0 0<br />

R / W C on su lta n t<br />

R / W P ur ch a se $ 1 , 5 0 0 $ 1 , 5 0 0<br />

A d m i nst ra ti ve $ 1 , 0 0 0 $ 1 , 0 0 0<br />

C on str u cti on $ 3 8 5 , 0 0 0 $ 3 8 5 , 0 0 0<br />

C ha n ge O rd er / C o nti ng enc y $ 3 8 ,5 0 0 $ 3 8 , 5 0 0<br />

C on str u cti on E n gi ne er in g $ 2 , 5 0 0 $ 2 , 5 0 0<br />

In sp e cti on $ 2 0 ,0 0 0 $ 2 0 , 0 0 0<br />

T ota l s $ 6 1 ,5 0 0 $ 4 4 7 , 0 0 0 $ 5 0 8 , 5 0 0<br />

S o u rc e o f F un d s 2 00 9 20 10 20 11 201 2 2 01 3 To t als<br />

G en er a l F u nd<br />

O th er C ity F u nd s $ 3 4 ,4 4 0 $ 1 7 5 , 7 8 4 $ 2 1 0 , 2 2 4<br />

M u ni cip a l B o nd s<br />

P ri va te F un d i ng<br />

S ta te / F ed e ra l $ 2 7 ,0 6 0 $ 2 2 1 , 2 1 6 $ 2 4 8 , 2 7 6<br />

D el a w a r e C o un ty $ 5 0 ,0 0 0 $ 5 0 , 0 0 0<br />

T ota l s $ 6 1 ,5 0 0 $ 4 4 7 , 0 0 0 $ 5 0 8 , 5 0 0<br />

49


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 23 – SR 315 Intersection <strong>Improvement</strong>s<br />

Description and Purpose:<br />

The project will begin with the preparation <strong>of</strong> a safety study that will include<br />

the U. S. Route 23/State Route 315/Stratford Road Intersection and the U. S.<br />

Route 23/Pollock Road. The realignment <strong>of</strong> State Route315 and Stratford Road<br />

intersection will be evaluated along with signal retiming for the existing<br />

intersections. If the safety study results in a conclusion that requires<br />

additional preliminary engineering and planning, the consultant will then be<br />

scoped to complete the Steps <strong>of</strong> the Minor Project Development Process as<br />

directed by the <strong>City</strong> and ODOT.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

HSP (Highway Safety Program Funds) – $1,156,003<br />

Federal Earmark for US 23 – $850,850<br />

TRC (ODOT Toll Revenue Credits) - $128,445<br />

Justification:<br />

The safety and efficiency <strong>of</strong> this intersection is critical to the entire US 23<br />

corridor through the city. The project was initially identified by ODOT’s US 23<br />

Access Management <strong>Plan</strong> as an intersection requiring improvement.<br />

Recommended Funding:<br />

Funding is from a combination <strong>of</strong> state Highway Safety Project (HSP) Funds,<br />

ODOT earmark funds and Toll Revenue Credits (TRC’s) which are to be applied<br />

to <strong>of</strong>fset the city’s required 20% cost <strong>of</strong> the R/W and construction costs, and<br />

100% <strong>of</strong> the design. Project start has been delayed due to ODOT’s requirement<br />

to repeat the consultant selection process. All design expenses are<br />

reimbursable on an as-invoiced basis through ODOT. <strong>City</strong> will have to fund PE<br />

portion directly, though reimbursement is 100%. R/W, utility relocation and<br />

construction is 100% city funded. Documented TRC, earmark, and HSP funds<br />

allocated to the project total $2,135,298.<br />

50


Recommended Funding Cont’d.:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

E nvir on m ent a l $ 7 5 ,0 0 0 $ 7 5 ,0 0 0<br />

P re lim in a ry E n gine er ing $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

Fina l E n ginee r ing $ 1 0 0 , 0 0 0 $ 1 0 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

Ad m inst ra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />

C o nst ru ct io n $ 1 ,4 0 0 ,0 0 0 $ 1 ,4 0 0 , 0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

C o nst ru ct io n En ginee ring $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

In s p ec t ion $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

T ot a ls $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />

T ot a ls $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />

51


Pictures and Drawings:<br />

52


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 23-Pennsylvania Avenue Interchange <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Project includes the study, design, and construction <strong>of</strong> a modified interchange<br />

to provide full movement access between Pennsylvania Avenue and US-23.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

MORPC STP Sub-allocation Funds<br />

Pictures and Drawings:<br />

Justification:<br />

Ongoing study <strong>of</strong> interchange modifications which commenced in 2005 and<br />

administered through the ODOT 10-Step Minor PDP process. Initial project<br />

study costs are being funded utilizing State STP-M funding through the annual<br />

MORPC allocation toward <strong>Delaware</strong>.<br />

53


Recommended Funding:<br />

Project continues under preliminary development in the ODOT PDP process for<br />

minor projects. All design expenses are 100% reimbursable through ODOT.<br />

Construction could begin in 2012 and is a candidate for funding split <strong>of</strong> 80%<br />

MORPC funds (STP) and 20% <strong>City</strong> funds (as is right-<strong>of</strong>-way purchase). Based<br />

on the projected 2012 STP available funds to cover remaining environmental<br />

and engineering costs (this project only), approximately $2,600,000 should be<br />

available for right-<strong>of</strong>-way and construction cost reimbursement. Our current<br />

estimate for right-<strong>of</strong>-way and construction is $2,875,000 (80% <strong>of</strong> this amount<br />

is $2,300,000).<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

T ra ff ic<br />

E nv ir on m ent a l $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

P relim in a ry E n gine ering $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

Fina l E n gineer ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha se<br />

Ad m instra t ive<br />

C o nst ru ction<br />

C h an ge O r d er/ C o nt ing ency<br />

C o nst ru ction E ngin eering<br />

In sp ect ion<br />

T ot a ls $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />

T ot a ls $ 3 5 0 ,0 0 0<br />

54


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Veterans Parkway<br />

Description and Purpose:<br />

<strong>Plan</strong>ning, design, and construction <strong>of</strong> a limited access highway from the US 23<br />

to the intersection <strong>of</strong> Glenn Road and Mill Run Crossing (as recently defined in<br />

determining the study area with ODOT). Identified as a Tier II project on<br />

ODOT’s TRAC list (PID 80824) – called the <strong>Delaware</strong> Southeast By-Pass. Project<br />

AKA Alternate #16 from the 2001 Thoroughfare <strong>Plan</strong>.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

Project is identified as a high priority project on the <strong>City</strong>’s thoroughfare plan by<br />

both the <strong>City</strong> and County. $4.48 million in federal earmark funds were<br />

authorized in the current SAFETEA-LU Transportation bill supported by U.S.<br />

House <strong>of</strong> Representative Patrick Tiberi’s <strong>of</strong>fice, with up to $4,082,813 Million<br />

available for the project study and design. The <strong>City</strong>’s 20% matching obligation<br />

for the federal earmark funds is to be <strong>of</strong>fset by ODOT assigned TRC’s (Toll<br />

Revenue Credits).<br />

Recommended Funding:<br />

Project must follow the ODOT 14-Step Project Development Process (PDP).<br />

Project negotiations were completed with pr<strong>of</strong>essional service contract approved<br />

in June 6, 2008 for $356,491 which has been encumbered through ODOT.<br />

<strong>City</strong> to front cost <strong>of</strong> all design work with reimbursement on an as-invoiced<br />

basis. Also, Senator Voinovich, Congressman Tiberi, and Senator Brown all<br />

submitted an appropriation questionnaire for FY 2009 for $38 million in<br />

additional federal earmark request for construction funding, though approval is<br />

unlikely.<br />

Recommended funding for construction is based on assumptions made during<br />

pre-planning process, absent <strong>of</strong> a preferred alignment. Estimates are provided<br />

only to illustrate the magnitude <strong>of</strong> the construction costs. Estimates based on<br />

2.6 miles <strong>of</strong> two-lane “super-two” highway and four (4) bridges.<br />

2013+ costs are shown to capture the magnitude <strong>of</strong> future additional funds<br />

required for the project construction and it is anticipated that the actual<br />

schedule for construction will be revised to subsequent years.<br />

55


Recommended Funding Cont’d:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing $ 4 0 0 ,0 0 0 $ 4 0 0 ,0 0 0<br />

Fina l E n ginee r ing $ 3 ,0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e $ 6 , 0 0 0 ,0 0 0 $ 6 ,0 0 0 , 0 0 0<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 3 7 ,0 0 0 ,0 0 0 $ 3 7 ,0 0 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 3 ,7 0 0 ,0 0 0 $ 3 ,7 0 0 , 0 0 0<br />

C o nst ru ct io n En ginee ring $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

In s p ec t ion $ 2 ,0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />

T ot a ls $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 5 2 ,3 5 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 0<br />

O th e r C ity Fu nd s<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 3 ,4 0 0 , 0 0 0<br />

Fu tu re Fed er era l Fu nd in g $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 4 8 ,9 5 0 ,0 0 0<br />

T ot a ls $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 5 2 ,3 5 0 ,0 0 0<br />

56


Pictures and Drawings:<br />

This pictures shows the study area for Veteran’s Parkway.<br />

57


REVENUES:<br />

CAPITAL IMPROVEMENT PLAN<br />

PARKS IMPROVEMENT FUND<br />

2009 - 2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

Neighborhood Park Exaction Fees 315,000 15,000 15,000 15,000 15,000<br />

ODNR Grant<br />

<strong>CIP</strong> Allocation 0 37,200 14,000 17,500 10,000<br />

TOTAL REVENUES 315,000 52,200 29,000 32,500 25,000<br />

EXPENDITURES:<br />

COMMUNITY PARKS<br />

MINGO PARK<br />

- Gym Floor Replacement 36,000<br />

GLEN ROSS PARK<br />

- Park Construction 240,000<br />

SMITH PARK<br />

- Field <strong>Improvement</strong>s 0 10,000<br />

NEIGHBORHOOD PARK IMPROVEMENTS 75,000 15,000 15,000 15,000 15,000<br />

PARKING LOT RESURFACING/SEAL COATING<br />

- Eastside Park 1,200<br />

- Smith Park 14,000<br />

- Mingo and Blue Limestone 17,500<br />

TOTAL EXPENDITURES 315,000 52,200 29,000 32,500 25,000<br />

PURPOSE: The Parks <strong>Improvement</strong> Fund/ Non-Impact Fee <strong>Plan</strong> identifies future improvements<br />

to the <strong>City</strong>'s parks and recreation system that cannot be funded from parks impact fees.<br />

FUNDING SOURCES: The projects in this plan are funded by an allocation <strong>of</strong> the general fund<br />

income tax proceeds. Grant funds are also leveraged when possible to <strong>of</strong>fset the cost to the<br />

general fund. The <strong>City</strong> also has a parks exaction policy that requires new developers to dedicate<br />

parkland for public recreational purposes <strong>of</strong> approximately 10% <strong>of</strong> the acreage developed. In<br />

lieu <strong>of</strong> the required land dedication, Council may accept cash equivalent to the value <strong>of</strong> the land<br />

otherwise required to be dedicated. These funds are allocated in this plan.<br />

59


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Parking Lot/Pavement Resurfacing<br />

Description and Purpose:<br />

Seal coating parking lots/pavement in parks to extend the life <strong>of</strong> the existing<br />

pavement.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

Park <strong>Improvement</strong> Fund<br />

Justification:<br />

Seal coating extends the life <strong>of</strong> the pavement, improves aesthetics <strong>of</strong> the parks,<br />

and eliminates safety hazards from holes or cracks.<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

M ingo a nd B lue L im est on e<br />

E a st Sid e P a r k / R heem St . $ 1 ,2 0 0 $ 1 ,2 0 0<br />

Sm ith P a rk $ 1 4 ,0 0 0 $ 1 4 ,0 0 0<br />

M ingo a nd B lue L im est on e $ 1 7 ,5 0 0 $ 1 7 ,5 0 0<br />

T ot a ls $ 3 2 ,7 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 1 ,2 0 0 $ 1 4 ,0 0 0 $ 1 7 ,5 0 0 $ 3 2 ,7 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l<br />

T ot a ls $ 0 $ 1 ,2 0 0 $ 1 4 ,0 0 0 $ 1 7 ,5 0 0 $ 3 2 ,7 0 0<br />

61


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Gym Floor Replacement<br />

Description and Purpose:<br />

Replace existing gym floor with new tiles, underlayment and molding.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The flooring tiles currently in the gym are original to the facility. They are<br />

worn, coming loose in places, and are beginning to pose safety concerns. The<br />

gym has received a large increase in usage with the upgrades at Mingo Park<br />

and the gym floor won’t hold up as is much longer. In order to upgrade<br />

programming, increase the number <strong>of</strong> activities in the gym, and to maintain<br />

safety the floor needs to be addressed within the next 2 years.<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ym F loor $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

T ot a ls $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l<br />

T ot a ls $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

62


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Smith Park Field <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Improve the fields at Smith Park to improve field conditions and drainage on<br />

each <strong>of</strong> the four fields. Field improvements needed include bringing in soil and<br />

regarding the infields on each <strong>of</strong> the four fields. Install dugouts at each <strong>of</strong> the<br />

four fields (8 dugouts). The dugouts would be built in-house and would be<br />

built using a concrete pad and concrete blocks, with posts going up to a ro<strong>of</strong>.<br />

Currently we only have benches with no dugout fencing or separation. Build<br />

SST Waterless restrooms on the site to provide improved restroom facilities and<br />

to alleviate the on-going rentals <strong>of</strong> the port-a-johns currently in use. The<br />

waterless restrooms could then be converted once city water reaches Smith<br />

Park.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong>s Fund (Fund 410)<br />

Justification:<br />

Smith Park is one <strong>of</strong> our three community parks in <strong>Delaware</strong>. As a community<br />

park, the appearance and functionality <strong>of</strong> the park reflects on our entire park<br />

system and image <strong>of</strong> the city as a whole. It is the home <strong>of</strong> our adult s<strong>of</strong>tball<br />

fields and has the potential to become more <strong>of</strong> a destination for teams and<br />

tournaments. The field conditions are below average due to drainage issues<br />

and the site as a whole is in need <strong>of</strong> improvements (dugouts, restrooms) to<br />

provide an environment competitive with those found at other similar facilities<br />

that our players and potential players can access.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

V ar iou s im p r ovem ent s $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

T ot a ls $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

O th er C ity Fu nd s<br />

T ot a ls $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

63


CAPITAL IMPROVEMENT PLAN<br />

EQUIPMENT REPLACEMENT FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 303,598 372,398 56,898 18,398 132,398<br />

REVENUES:<br />

<strong>CIP</strong> Allocation 275,000 500,000 775,000 700,000 765,000<br />

TOTAL REVENUE 275,000 500,000 775,000 700,000 765,000<br />

EXPENDITURES:<br />

PUBLIC WORKS<br />

Pickup Trucks 0 115,000 20,000 15,000<br />

2 Ton Dump Truck 0 95,000 97,000 0 104,000<br />

1 Ton Dump Truck 99,000<br />

1 Ton Sign Truck 46,000<br />

Street Sweeper (3yr. Lease) 55,000 55,000 55,000<br />

Tandem Axle Dump Truck 116,000<br />

Backhoe 91,500<br />

Loader 110,000<br />

Skid Steer 33,000<br />

Crack Seal Machine 55,000<br />

Asphalt Roller 38,000<br />

Asphalt Saw 32,000<br />

Asphalt <strong>Plan</strong>ner 10,500<br />

Utility Van 21,500<br />

TOTAL PUBLIC WORKS 55,000 330,500 419,500 168,500 290,000<br />

PARKS AND RECREATION<br />

3/4 Ton Pickup Truck 0 24,000 25,000<br />

72" Outfront Mower 9,200 13,000 14,000 15,000 15,000<br />

45 HP 4WD Tractor 24,000<br />

55 HP Tractor 28,000<br />

1 Ton Dump Truck 55,000<br />

TOTAL PARKS AND RECREATION 9,200 61,000 67,000 70,000 15,000<br />

AIRPORT<br />

Rebuilt Tug 5,500<br />

Ground Power Unit 12,000<br />

Utility Vehicle 14,000<br />

Jet A Truck 56,500<br />

TOTAL AIRPORT 14,000 0 12,000 56,500 5,500<br />

POLICE DEPARTMENT<br />

Police Cruiser Replacements 128,000 134,000 140,000 146,000 146,000<br />

Detective Vehicle 25,000<br />

Chief Car 25,000<br />

Weight Enforcement Truck 25,000<br />

Parking Control Vehicle 20,000<br />

TOTAL POLICE 128,000 159,000 190,000 166,000 146,000<br />

FIRE DEPARTMENT<br />

EMS Medic Vehicle Replacement 240,000 250,000<br />

Vehicle Replacement 25,000<br />

Engine Truck Replacement (Lease Payment) 65,000<br />

Fire Ladder Replacement (Lease Payment) 125,000 125,000 125,000<br />

TOTAL FIRE 0 265,000 125,000 125,000 440,000<br />

TOTAL EXPENDITURES 206,200 815,500 813,500 586,000 896,500<br />

CARRY OVER BALANCE 372,398 56,898 18,398 132,398 898<br />

PURPOSE: The Equipment Replacement Fund schedules replacement <strong>of</strong> existing equipment<br />

utilized in the Public Works, Parks and Recreation, and Airport. The fund also schedules<br />

replacement <strong>of</strong> Police and Fire vehicles not covered by impact fees.<br />

FUNDING SOURCE: Funding for these equipment purchases comes from the general income<br />

tax allocation.<br />

65


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Public Works Equipment Replacement<br />

Description and Purpose:<br />

The Public Works Department vehicles are used for variety <strong>of</strong> roadway and<br />

public works projects. Vehicles and equipment is replaced based on a vehicle<br />

replacement schedule based on the number <strong>of</strong> hours <strong>of</strong> operations and mileage<br />

and service needs.<br />

Department:<br />

Public Works Department<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

The Public Works Department uses a replacement schedule to minimize the<br />

overall maintenance costs and depreciation loss to the <strong>City</strong> for equipment<br />

expenditures. The proposed purchases will replace items that range from 8 to<br />

12 years old.<br />

Recommended Funding:<br />

RE CO M M E ND ED F UND ING<br />

E st im a t ed Expe n dit ur e s 2 00 9 20 10 201 1 2 012 20 13 + T ota l s<br />

U tility V a n $21 ,500 $21,5 00<br />

Picku p tru cks $115,00 0 $ 20,000 $15 ,000 $150,0 00<br />

2 To n D u m p $95,000 $ 97,000 $104, 000 $296,0 00<br />

1 To n D u m p $99 ,000 $99,0 00<br />

1 To n S ign Tru ck $ 46,000 $46,0 00<br />

Stre et Sw eeper (3 yr. Leas e $55 ,000 $55,000 $ 55,000 $165,0 00<br />

Ta ndem A xle D u m p $116, 000 $116,0 00<br />

Ba ckh oe $ 91,500 $91,5 00<br />

Loa der $ 110,000 $110,0 00<br />

Skid Steer $33 ,000 $33,0 00<br />

Cr ack Sea l M a chin e $55,000 $55,0 00<br />

As pha lt Ho t Bo x $0<br />

As pha lt <strong>Plan</strong> ner $10,500 $10,5 00<br />

As pha lt Roller $38,0 00 $38,0 00<br />

As pha lt Sa w $32,0 00 $32,0 00<br />

Tota ls $55 ,000 $330,50 0 $ 419,500 $168 ,500 $290, 000 $1, 263,500<br />

So ur ce <strong>of</strong> Fu nd s 2 00 9 20 10 201 1 2 012 20 13 + T ota l s<br />

Tra n sfer fro m CI P $55 ,000 $330,50 0 $ 419,500 $168 ,500 $290, 000 $1, 263,500<br />

67


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Police Equipment Replacement<br />

Description and Purpose:<br />

The Police Department’s vehicles are typically replaced before the vehicle<br />

mileage exceeds 90,000 miles and an estimated use <strong>of</strong> approximately 27,000<br />

miles per year. The Department usually replaces one or two vehicles a year to<br />

avoid large capital expenditures. This incremental approach minimizes down<br />

time for cruiser transition, excessive maintenance expenses and a more<br />

systematic approach to fleet replacement. Also, the addition <strong>of</strong> new cruisers is<br />

consistent with anticipated increases in the work load and work force. In<br />

addition to standard cruiser replacement, the Department plans to replace the<br />

Chief’s vehicle and CSO Vehicle in 2009, and one <strong>of</strong> the current detective<br />

vehicles in 2010.<br />

Department:<br />

Police Department<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

Replacement <strong>of</strong> police vehicles based on estimated useful life, service needs,<br />

and mileage limits.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a t ed<br />

E x pe n di tu re s 20 09 2 01 0 20 11 201 2 20 13 T o ta ls<br />

P olice C ru is ers $ 1 2 8 ,0 0 0 $ 1 3 4 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 6 9 4 ,0 0 0<br />

D e te ctiv e V e hic le $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

C h ie f C a r $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

C S O V ehicle $ 0<br />

T ru ck W e igh t E n f. $ 2 5 , 0 0 0 $ 2 5 ,0 0 0<br />

P a rk in g C o nt ro l $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />

T ot a ls $ 1 2 8 ,0 0 0 $ 1 5 9 ,0 0 0 $ 1 9 0 ,0 0 0 $ 1 6 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 7 8 9 ,0 0 0<br />

So ur ce o f Fu nd s 20 09 2 01 0 20 11 201 2 20 13 T o ta ls<br />

T ra n sfe r fro m C I P $ 1 2 8 ,0 0 0 $ 1 5 9 ,0 0 0 $ 1 9 0 ,0 0 0 $ 1 6 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 7 8 9 ,0 0 0<br />

68


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fire Fleet Vehicle Replacement<br />

Description and Purpose:<br />

- Replacement <strong>of</strong> Existing Fleet Vehicles<br />

o Vehicle Replacement Schedule<br />

o Insurance Services Report – October 22, 1998<br />

o T.G. Fire/EMS Services Inc., 2001 Study<br />

o Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />

Goal #2 - Improve Facilities to Match Resource to Risk<br />

Reduce Response Times<br />

o Fire Department Strategic <strong>Plan</strong> – Service Gap<br />

Meet international benchmarks and standard <strong>of</strong> care<br />

Upgrade and modernize existing facilities<br />

Deployment analysis to identify appropriate location <strong>of</strong><br />

facilities to meet the standards <strong>of</strong> coverage.<br />

Department:<br />

Fire Department<br />

Fund and Account:<br />

General Fund (Fund 101)<br />

Fire Impact Fee Fund (Fund 493)<br />

Justification:<br />

The Fire Department fleet vehicles are aging. In 2007, the Fire Department lost<br />

a staff vehicle due to mechanical problems, and it has not been replaced. The<br />

purchase <strong>of</strong> new fleet vehicles in 2009 and 2010 would include the purchase <strong>of</strong><br />

a command vehicle and a training vehicle through Impact Fees. The<br />

Department has proposed a plan to develop a rotation based on the<br />

Department’s Vehicle Replacement <strong>Plan</strong>. These vehicles would allow the<br />

Department to be prepared for Fire Department operations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a t ed E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

E M S M e d ic V eh R eplcm t $ 2 4 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

V ehicle R ep lac em ent $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

E ng in e R ep lcm t (Le ase) $ 6 5 ,0 0 0 $ 6 5 ,0 0 0<br />

L a d d er R ep lcm t (L ea se) $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 3 7 5 ,0 0 0<br />

T ot a ls $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

T ra n sfer fro m C I P $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />

T ot a ls $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />

69


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Airport Equipment Replacement<br />

Description and Purpose:<br />

Similar to other departments, the Airport uses a vehicle replacement schedule<br />

to replace its vehicles and or airport equipment based on estimated useful life,<br />

service needs, and mileage limits.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

In 2009 the Department plans to add an all terrain vehicle to service airfield<br />

perimeter maintenance areas and drainage areas. The remaining equipment<br />

will be utilized to address increased demand for service.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E st im a t ed<br />

E x pe n di tu re s 20 09 2 01 0 20 11 201 2 20 13 T o t a ls<br />

R eb u ilt T ug $ 5 ,5 0 0 $ 5 ,5 0 0<br />

G rou n d P ow e r Un it $ 1 2 ,0 0 0 $ 1 2 ,0 0 0<br />

U tilit y V eh icle $ 1 4 ,0 0 0 $ 1 4 ,0 0 0<br />

3 / 4 T o n P ick up $ 0<br />

J e t A T ru ck $ 5 6 ,5 0 0 $ 5 6 ,5 0 0<br />

T ot a ls $ 1 4 ,0 0 0 $ 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 8 8 ,0 0 0<br />

So ur ce o f Fu nd s 20 09 2 01 0 20 11 201 2 20 13 T o t a ls<br />

T ra n s fe r fro m C I P $ 1 4 ,0 0 0 $ 2 5 , 5 0 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 1 1 3 ,5 0 0<br />

T ot a ls $ 1 4 ,0 0 0 $ 2 5 , 5 0 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 1 1 3 ,5 0 0<br />

70


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Parks and Recreation Equipment Replacement<br />

Description and Purpose:<br />

The Parks and Recreation Department uses various pieces <strong>of</strong> equipment for<br />

special park projects as well as park mowing. Prudent replacement <strong>of</strong><br />

equipment allows for optimum usage and minimizes lost time in repairs and<br />

service issues with damaged or inoperable equipment.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

Replacement <strong>of</strong> parks and recreation department vehicles and equipment is<br />

based on estimated useful life, service needs, and mileage limits. Out-front<br />

mowers are highly maneuverable and designed to meet the varied and<br />

demanding conditions found in the <strong>City</strong>’s park system. Many <strong>of</strong> these models<br />

include hydraulic mower lifts, have shaft driven mowers and transmission and<br />

have power steering. In most conditions, they out-mow larger decked mowers<br />

due to their mowing speed tolerance, maneuverability (less trimming) and<br />

versatility. The purchase <strong>of</strong> a fourth mower is the result <strong>of</strong> increasing mowing<br />

acreage and the loss <strong>of</strong> productivity in loading and unloading mowers,<br />

transporting across town, etc. Having a fourth mower will allow for split<br />

mowing crews when efficiency would benefit. The 45 HP and 55 HP tractors<br />

have high powered engines with high torque and will be used for a variety <strong>of</strong><br />

projects such as excavation, hauling, leveling, plowing, etc. The ¾ Ton Pick-up<br />

and 1 Ton Dump Truck purchases are replacement for current inventory that<br />

will all be 10 years old or older at time <strong>of</strong> replacement.<br />

71


Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

3 / 4 To n P ick -u p $ 2 4 ,0 0 0 $ 2 5 ,0 0 0 $ 4 9 ,0 0 0<br />

7 2 " O ut fr on t M ow er $ 9 ,2 0 0 $ 1 3 ,0 0 0 $ 1 4 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 6 6 ,2 0 0<br />

4 5 H P 4 W D T r act or $ 2 4 ,0 0 0 $ 2 4 ,0 0 0<br />

5 5 H P T ra cto r $ 2 8 ,0 0 0 $ 2 8 ,0 0 0<br />

1 T o n D u m p T ru ck $ 5 5 ,0 0 0 $ 5 5 ,0 0 0<br />

T ot a ls $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 1 5 ,0 0 0 $ 2 2 2 ,2 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 1 5 ,0 0 0 $ 2 2 2 ,2 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

T ot a ls $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 2 0 7 ,2 0 0 $ 2 2 2 ,2 0 0<br />

72


REVENUES:<br />

CAPITAL IMPROVEMENT PLAN<br />

TECHNOLOGY IMPROVEMENTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

<strong>CIP</strong> Allocation 177,000 347,000 262,000 287,000 212,000<br />

TOTAL REVENUE 177,000 347,000 262,000 287,000 212,000<br />

EXPENDITURES:<br />

Telephone System Lease (5yrs. $250,000) 60,000 60,000 60,000 60,000 60,000<br />

<strong>Plan</strong>ning S<strong>of</strong>tware (5yrs. $200,000) 47,000 47,000 47,000 47,000 47,000<br />

Fiber/Infrastructure 0 35,000 35,000 35,000 35,000<br />

Servers/Server Hardware 15,000 15,000 15,000 15,000 15,000<br />

PC Replacement 35,000 35,000 35,000 35,000 35,000<br />

Copier Replacement 20,000 20,000 20,000 20,000 20,000<br />

S<strong>of</strong>tware Systems 50,000 75,000<br />

AS 400 PD 85,000<br />

PD Call Logger (see telephone sys. Sheet) 50,000<br />

TOTAL EXPENDITURES 177,000 347,000 262,000 287,000 212,000<br />

PURPOSE: The Technology <strong>Improvement</strong>s <strong>CIP</strong> identifies significant technology improvements<br />

necessary to address <strong>City</strong>wide technology systems.<br />

FUNDING SOURCES: General fund income tax allocation.<br />

73


34 74


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Annual Server and Network Equipment Purchases and Replacements<br />

Description and Purpose:<br />

Annual Server and Network Equipment Purchases and Replacements. The IT Department maintains a<br />

scheduled replacement <strong>of</strong> all servers in the <strong>City</strong> <strong>of</strong> a maximum <strong>of</strong> 5 years <strong>of</strong> service to the <strong>City</strong> for front-line<br />

services. Once a server reaches this age, the machine may be utilized in a reserve role, or its service to the <strong>City</strong><br />

terminated, depending upon the condition <strong>of</strong> the hardware. A similar plan is in effect for Network equipment,<br />

although that equipment may be used effectively for up to 7 years, at present.<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

In 2009, we have scheduled the removal from service <strong>of</strong> 6 servers. The functionality <strong>of</strong> each <strong>of</strong> these servers will<br />

require replacement. The <strong>City</strong>’s server capacity strategy is to purchase bigger servers, but to divide the use <strong>of</strong><br />

the servers into virtual servers, capable <strong>of</strong> providing more capacity in fewer machines. The servers targeted for<br />

retirement in 2008, 6 in all, were replaced by 2 physical servers. Those two physical servers still have capacity to<br />

provide more services, and are being utilized in the implementation <strong>of</strong> additional s<strong>of</strong>tware systems, such as that<br />

for the <strong>Plan</strong>ning/Development Department.<br />

In this category also comes additional disk capacity within the <strong>City</strong>. The <strong>City</strong> currently has 13 terabytes <strong>of</strong> data<br />

storage capacity. Of this, more than 50% is currently in use in some way. IT intends to extend the <strong>City</strong>’s data<br />

storage capacity, and evaluate disaster recovery systems, and <strong>of</strong>f-site storage in order to continue to provide<br />

adequate file storage to the <strong>City</strong>.<br />

With respect to Network Equipment, the <strong>City</strong> continues to build some network redundancy, particularly between<br />

<strong>City</strong> Hall and the Justice Center. This requires the purchase <strong>of</strong> an additional router, so that connectivity can be<br />

mirrored across the fiber. With 911 consolidation, it may become critical to have two different pathways to the<br />

Justice Center by fiber, so that remote operations are possible.<br />

Backup <strong>of</strong> <strong>City</strong> Data, including High Value Data. The <strong>City</strong> now has a strategic plan for the consolidated storage<br />

<strong>of</strong> general information, and for High Value Data—so that all data in the <strong>City</strong> can reside, in a backup form, in one<br />

location. There are two synergistic goals <strong>of</strong> this strategy: (1) the desire to keep High Value Data (SSNs, personal<br />

information, etc.) private, and (2) to have a reliable <strong>of</strong>f-site storage mechanism with an easy method to both<br />

recover deleted files, and to recover in the event <strong>of</strong> a disaster (DR). This strategy calls for the implementation <strong>of</strong><br />

a mirrored hard drive solution at the new Public Works facility, and/or a major robotic tape library installed at the<br />

new Public Works facility.<br />

Changes and Updates:<br />

Public Records laws will require greater availability <strong>of</strong> information to the public. Without some sort <strong>of</strong><br />

consolidation <strong>of</strong> information, the <strong>City</strong> may have difficulty in complying with these new laws.<br />

Recommended Funding<br />

E s tim a te d<br />

E x p e n d i tu re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 + T o ta ls<br />

S e rv e r R e p la c e m e n t<br />

N e t w o rk E q u ip m e n t<br />

$ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

$ 1 5 ,0 0 0 $ 7 5 ,0 0 0<br />

T o ta ls $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 0 $ 7 5 ,0 0 0<br />

Source <strong>of</strong> Funds<br />

S o u r c e o f F u n d s 2 0 09 2 0 10 2 0 11 2 0 1 2 2 0 1 3 To ta ls<br />

G e n e ra l F u nd $ 1 5 ,00 0 $ 1 5 ,00 0 $1 5 ,0 00 $1 5 ,0 00 $1 5 ,0 00 $ 7 5 ,0 0 0<br />

O th e r C ity F un d s $0<br />

M u n ic ip al B on d s $0<br />

P riv a te Fu n d in g $0<br />

S tate /F ed e ral $0<br />

O th e r G ra n ts $0<br />

T o ta l $ 1 5 ,00 0 $ 1 5 ,00 0 $1 5 ,0 00 $1 5 ,0 00 $1 5 ,0 00 $ 7 5 ,0 0 0<br />

75


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Police Department AS/400 Replacement<br />

Description and Purpose:<br />

Police Department AS/400 Replacement. The <strong>City</strong>’s Police Department currently utilizes the CHIEFS s<strong>of</strong>tware<br />

system, which can only successfully reside on IBM AS/400 mid-range computers. The current AS/400 is<br />

approximately 7 years old.<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

In 2007, the <strong>City</strong> spent approximately $8,000 in order to extend the life <strong>of</strong> the <strong>City</strong>’s AS/400 computer system.<br />

The system, which is now beyond end-<strong>of</strong>-life from a manufacturer’s perspective (IBM no longer supports the<br />

machine), will eventually fail. While these machines are true workhorses among computers, if the Police<br />

Department intends to continue to use the CHIEFS s<strong>of</strong>tware system, will need to be replaced.<br />

Changes and Updates:<br />

Recommended Funding<br />

E s tim a ted<br />

E x p en d itu re s 2 0 09 2 0 10 2 0 11 2 0 1 2 2 0 1 3 2 0 1 4 + T o tals<br />

S erve r<br />

R ep la c e m e n t $ 7 0 ,00 0 $ 7 0,0 0 0<br />

E qu ip m e n t<br />

U pg ra de s $ 0<br />

D R /C o nso lid a tio n $ 1 5 ,00 0 $ 1 5,0 0 0<br />

T o ta ls $ 8 5 ,00 0 $ 0 $ 0 $ 0 $ 0 $ 8 5,0 0 0<br />

Source <strong>of</strong> Funds<br />

So u rc e o f Fu n ds 2009 2010 2011 2012 2013 2013+ T o tals<br />

G e neral F und $ 85,000 $0 $0 $ 85,000<br />

O ther C ity F unds $0<br />

M u nicipal B onds $0<br />

P riva te Fu nding $0<br />

S tate/F edera l $0<br />

O ther G ra nts $0<br />

T otal $ 0 $ 85,000 $0 $0 $0 $0 $ 85,000<br />

76


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

PC Replacements<br />

Description and Purpose:<br />

PC Replacements<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

Commonly, technology used by users in the <strong>City</strong> will last 3 to 5 years, with those using 5 years having<br />

significantly fewer abilities to get high productivity out <strong>of</strong> their pcs as those using 3 year or younger equipment.<br />

We attempt to replace all pcs within a 4 year cycle in order to keep productivity as high as possible from a<br />

technology point <strong>of</strong> view.<br />

Changes and Updates:<br />

Each year, the <strong>City</strong> typically identifies from 30 to 40 computers which are the highest need candidates for<br />

replacement.<br />

The <strong>City</strong> is currently investigating installation <strong>of</strong> “Thin Client” computers, rather than pcs for most departmental<br />

users. The primary advantages to this approach are: (1) lower cost <strong>of</strong> replacement (at a certain point), (2)<br />

lower cost <strong>of</strong> deployment, (3) standardized user experiences, (4) lower cost <strong>of</strong> antivirus and other<br />

management s<strong>of</strong>tware systems, (4) lower energy cost, (5) longer lifecycle, (6) lower maintenance cost <strong>of</strong><br />

machines (no moving parts). In order to achieve this, we have to acquire additional servers (about 1 for each<br />

25 users). In the long term, it should mean overall lower operating cost for all departments except<br />

Engineering, and possibly planning and GIS, where high-end graphics capabilities are required.<br />

For the next several years, the IT Department will be purchasing a combination <strong>of</strong> PCs and Servers/thin client<br />

computers within the PC Replacement line item. This will permit the <strong>City</strong> to take as large an advantage from<br />

the thin client implementation perspective, while still taking into consideration the trade-<strong>of</strong>fs associated with<br />

thin client computing.<br />

Also included in this Project are Laptops, Monitors, Peripherals, and Projectors.<br />

Not included in this Project, are replacements for printers, which are not contained in any <strong>CIP</strong> Project.<br />

Recommended Funding<br />

E stim ate d<br />

E xp e nd itur e s 2 0 09 2 0 10 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4+ T ota ls<br />

P C s/T hi n<br />

L a p top s<br />

P rin ters<br />

M o n itors<br />

$ 3 5 ,00 0 $ 3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $ 17 5 ,0 00<br />

$ 0<br />

P e rip h e ra ls $ 0<br />

P ro je ctors $ 0<br />

T o ta ls $ 3 5 ,00 0 $ 3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $ 0 $ 17 5 ,0 00<br />

Source <strong>of</strong> Funds<br />

So urce o f Fu nd s 2009 2 010 2011 2012 2 013 2014+ To ta ls<br />

G e nera l F u nd $ 35,00 0 $35,000 $3 5,000 $35,0 00 $35,000 $175,000<br />

O th er C ity F unds $0<br />

M unicipal B on ds $0<br />

P rivate Fu nding $0<br />

S tate/F ederal $0<br />

O th er G rants $0<br />

T ota l $ 35,00 0 $35,000 $3 5,000 $35,0 00 $35,000 $ 0 $175,000<br />

77


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Fiber Infrastructure<br />

Description and Purpose:<br />

Fiber Infrastructure; <strong>City</strong> and Consortium fiber infrastructure projects. This project is meant to develop fiber optic<br />

infrastructure in furtherance <strong>of</strong> the <strong>City</strong>’s IT needs, and economic development.<br />

Department:<br />

Information Technology<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

The <strong>City</strong> has committed to building a city-wide fiber infrastructure for use by the <strong>City</strong>, and as an economic<br />

development tool. <strong>City</strong> Council agreed that the fiber optic infrastructure should be considered on the same level as<br />

other infrastructure assets here in the <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>. Cities which are currently experiencing growth, typically<br />

have made significant investment in fiber technology.<br />

Changes and Updates:<br />

To date, 2008 has seen little change in the fiber optic infrastructure itself, here in the <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>. Legal<br />

documents for the formation <strong>of</strong> the Consortium entity, <strong>Delaware</strong> Area Super Highway (D.A.S.H.) have been drafted.<br />

However, absent external funding <strong>of</strong> some kind from DASH members, the infrastructure will not be able to be<br />

completed.<br />

In 2009 and beyond, we hope to work closely with the Public Works Department to develop in-house expertise at<br />

creating fiber-ready infrastructure. That is, we hope to be able to perform all aspects <strong>of</strong> building fiber infrastructure,<br />

from burying conduit, installing handholes, and pushing fiber, except for fiber terminations.<br />

Recommended Funding<br />

E stim ated<br />

Expenditures 2009 2010 2011 2012 2013 2014+ T otals<br />

N etwork<br />

R edundancy $0 $35,000 $35,000 $35,000 $35,000 $35,000 $175,000<br />

Total $0 $35,000 $35,000 $35,000 $35,000 $35,000 $175,000<br />

Source <strong>of</strong> Funds<br />

So urce o f Fu nd s 2009 2 010 2011 2012 2 013 2014+ To ta ls<br />

G e nera l F u nd $ 0 $35,000 $35,000 $35,000 $35,0 00 $3 5,000 $175,000<br />

O th er C ity F unds $0<br />

M unicipal B on ds $0<br />

P rivate Fu nding $0<br />

S tate/F ederal $0<br />

O th er G rants $ 0 $0<br />

T ota l $ 0 $35,000 $35,000 $35,000 $35,0 00 $3 5,000 $175,000<br />

78


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Copier Replacement<br />

Description and Purpose:<br />

Copier Replacement<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

With the implementation <strong>of</strong> the fiber optic network, the new telephone system, and unified messaging, it is paramount<br />

that we maintain current technology in our copier systems. We now utilize copiers as printers and scanners, as well as<br />

photocopy machines. IT’s plan for maintaining current technology was primarily implemented in 2007 with the purchase<br />

<strong>of</strong> 14 current technology copiers. These copiers permit the <strong>City</strong> to take advantage <strong>of</strong> the power <strong>of</strong> the unified<br />

messaging systems we have in place by permitting all users in the <strong>City</strong> to use copiers as scanners, saving files to the<br />

network, and faxing directly from their PCs.<br />

By implementing these changes, the <strong>City</strong> has begun to experience lower operational maintenance cost.<br />

The funding in this project is to pay the payments on a <strong>Capital</strong> Lease, which is the method used to make the purchase<br />

<strong>of</strong> the copiers in 2007.<br />

Changes and Updates:<br />

Recommended Funding<br />

E stim ate d<br />

E xp e nd itur e s 2 0 09 2 0 1 0 2 0 1 1 2 0 1 2 20 1 3 20 1 4 + T ota ls<br />

P rin te r/C o pie r/S ca n n ers $ 2 0 ,00 0 $ 2 0 ,0 00 $2 0 ,0 00 $ 20 ,0 0 0 $ 20 ,0 0 0 $ 2 0,0 0 0 $1 2 0 ,0 00<br />

$ 0<br />

$ 0<br />

$ 0<br />

$ 0<br />

T o ta ls $ 2 0 ,00 0 $ 2 0 ,0 00 $2 0 ,0 00 $ 20 ,0 0 0 $ 20 ,0 0 0 $ 2 0,0 0 0 $1 2 0 ,0 00<br />

Source <strong>of</strong> Funds<br />

So u rce o f Fu n ds 2009 2010 2011 2012 201 3 2014+ T o tals<br />

G e neral F und $20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $20,000 $12 0,000<br />

O ther C ity F unds $ 0<br />

M unicip al B onds $ 0<br />

P rivate Fundin g $ 0<br />

S tate/F ed eral $ 0<br />

O ther G rants $ 0<br />

T otal $20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $20,000 $12 0,000<br />

79


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Telephone System <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Telephone System <strong>Improvement</strong>s<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

This project represents the payment for the telephone system for which implementation began in 2006, and was<br />

completed in 2007.<br />

Changes and Updates:<br />

The <strong>City</strong> did make additional telephone system investment in 2007 to add additional capacity and redundancy for the<br />

Police Department. Additional capacity will be added when the telephone system is expanded to include service at the<br />

new Public Works facility on E. William Street. In conjunction with 911 consolidation, the <strong>City</strong> will need to invest in the<br />

replacement <strong>of</strong> the Police Department’s call logging system. This cost is expected to be about $50,000.<br />

Recommended Funding<br />

E s tim a te d<br />

E x p e nd itur es 2 0 09 20 1 0 20 1 1 2 0 1 2 20 1 3 20 1 4 + T ota ls<br />

T e le p ho n e S y stem $ 6 0 ,00 0 $ 6 0,0 0 0 $ 60 ,0 0 0 $ 60 ,0 0 0 $ 6 0,0 0 0 $ 6 0,0 0 0 $ 3 6 0,0 0 0<br />

P .D . C a ll Lo g g er $ 50 ,0 0 0 $ 5 0 ,0 0 0<br />

$ 0<br />

$ 0<br />

$ 0<br />

T o ta ls $ 6 0 ,00 0 $ 6 0,0 0 0 $ 1 10 ,0 0 0 $ 60 ,0 0 0 $ 6 0,0 0 0 $ 6 0,0 0 0 $ 4 1 0,0 0 0<br />

Source <strong>of</strong> Funds<br />

So u rc e o f Fu n ds 2009 2010 2011 2012 2013 2014+ T o tals<br />

G e neral F und $60,0 00 $60,0 00 $ 60,000 $ 60,000 $60,0 00 $60,00 0 $360 ,0 00<br />

O ther C ity F unds $ 50,000 $ 50,000<br />

M u nicipal B o nds $0<br />

P riva te Funding $0<br />

S tate/F edera l $0<br />

O ther G ra nts $0<br />

T otal $60,0 00 $60,0 00 $110 ,000 $ 60,000 $60,0 00 $60,00 0 $410 ,0 00<br />

80


CAPITAL IMPROVEMENT PLAN<br />

BUILDING MAINTENANCE<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

REVENUES:<br />

<strong>CIP</strong> Allocation 51,100 106,300 54,500 25,500 0<br />

TOTAL REVENUE 51,100 106,300 54,500 25,500 0<br />

EXPENDITURES:<br />

Carpet Replacement <strong>City</strong> Hall 10,000<br />

<strong>City</strong> Hall HVAC Replacement 0 60,000<br />

Justice Center Boiler Replacement 28,000 30,000<br />

Justice Center HVAC Overhaul 23,100 23,800 24,500 25,200 0<br />

HVAC Hilborn Room Mingo 12,500<br />

TOTAL EXPENDITURES 51,100 106,300 54,500 25,200 0<br />

PURPOSE: To plan for major building maintenance projects.<br />

FUNDING SOURCES: General fund income tax allocation.<br />

81


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: <strong>City</strong> Hall Carpet Replacement<br />

Description and Purpose:<br />

<strong>City</strong> Hall Carpet Replacement – 1 S. Sandusky Street<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

<strong>City</strong> Hall renovation occurred 14 years ago and the carpeting is in need <strong>of</strong><br />

replacement. 2010 funding will replace flooring in Council Chambers<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

C a rp e t R e p la ce m ent $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

T o ta ls $ 0 $ 1 0 ,0 0 0 $ 0 $ 0 $ 0 $ 1 0 ,0 0 0<br />

So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

G e n e ra l F u n d $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

T o ta ls $ 0 $ 1 0 ,0 0 0 $ 0 $ 0 $ 0 $ 1 0 ,0 0 0<br />

83


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Justice Center HVAC Overhaul<br />

Description and Purpose:<br />

Aging heat pump replacement program for Justice Center – 70 N. Union Street<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The Justice Center currently has 43 heat pumps that are 15 years old. The<br />

average operation expectation for these units is 12-15 years. The proposed 5<br />

year plan would replace approximately 9 units per year.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

H V A C R e p lac e m en t $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

T o ta ls $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

G e n e ra l F u n d $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

T o ta ls $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

84


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Justice Center Boiler Replacement<br />

Description and Purpose:<br />

Aging heating system boilers replacement program for Justice Center – 70 N.<br />

Union Street<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The Justice Center currently has 3 boilers that are 16 years old. The average<br />

operation expectation for these units is 12-15 years. The proposed 5 year plan<br />

would replace approximately 2 units over the next three years. One boiler was<br />

replaced during the recent renovations however another unit is inoperable.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

H e a t Sy ste m B oiler $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 0 $ 5 8 ,0 0 0<br />

T o ta ls $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 5 8 ,0 0 0<br />

So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

G e n e ra l F u n d $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 0 $ 5 8 ,0 0 0<br />

T o ta ls $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 5 8 ,0 0 0<br />

85


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: <strong>City</strong> Hall HVAC Upgrade<br />

Description and Purpose:<br />

Replacement <strong>of</strong> Johnson Control HVAC Management System to reduce annual<br />

<strong>City</strong> Hall HVAC operating cost<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The HVAC system in <strong>City</strong> Hall HVAC system is 15 years old. The HVAC<br />

management system is a proprietary system and requires a non-competitive<br />

parts & pr<strong>of</strong>essional service arrangement with Johnson Controls to maintain. A<br />

replacement system will be chosen that is a LonMark certified system to insure<br />

the HVAC system control components will be open to allow competitive<br />

purchasing <strong>of</strong> parts and service.<br />

Recommended Funding:<br />

RE C OM M E N D E D FU N DIN G<br />

E s t im a te d E x p e nd it ur es 2 009 2 01 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

H V AC M an a ge m e n t Syst e m $ 6 0 ,0 0 0 $ 6 0 ,0 0 0<br />

T ot a ls $ 6 0 ,0 0 0 $ 0 $ 0 $ 6 0 ,0 0 0<br />

So ur c e o f F un d s 2 009 2 01 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G e ner al F un d $ 6 0 ,0 0 0 $ 6 0 ,0 0 0<br />

T ot a ls $ 6 0 ,0 0 0 $ 0 $ 0 $ 6 0 ,0 0 0<br />

86


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: AC/Furnace in Hilborn Room<br />

Description and Purpose:<br />

HVAC replacement in Hilborn Room at Recreation Center.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

HVAC replacement program schedule.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

H ilb o rn R m HV A C R e p lace $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

T ot a ls $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed era l<br />

T ot a ls $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

87


22 88


CAPITAL IMPROVEMENT PLAN<br />

PARK IMPACT FEE IMPROVEMENT FUND<br />

2009-2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCE FORWARD 965,984 156,968 103,912 70,856 37,800<br />

REVENUES:<br />

Impact Fees 85,000 85,000 85,000 85,000 85,000<br />

TOTAL REVENUES 85,000 85,000 85,000 85,000 85,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Bonds<br />

Pool Imprvmnts ($450,000 10yrs., 2006 Issue) 55,927 55,927 55,927 55,927 55,322<br />

2006 Mingo Expansion ($500,000 10yrs.) 62,129 62,129 62,129 62,129 61,462<br />

Pool Imprvmts ($425,000 notes) 451,942 0 0 0 0<br />

Skate Park (Net) ($300,000 notes.) 319,018 0 0 0 0<br />

TOTAL DEBT SERVICE 889,016 118,056 118,056 118,056 116,784<br />

BIKEWAYS<br />

Henry St. Trail Enhancements 5,000 20,000<br />

TOTAL EXPENDITURES 894,016 138,056 118,056 118,056 116,784<br />

IMPACT FEE BALANCE 156,968 103,912 70,856 37,800 6,016<br />

PURPOSE: The Parks <strong>Improvement</strong> Fund/ Impact Fee <strong>Plan</strong> identifies future projects intended<br />

to increase the capacity <strong>of</strong> the <strong>City</strong>'s community parkland and recreation systems. In 2001 the<br />

<strong>City</strong> enacted a parks and recreation facilities development impact fee <strong>of</strong> $1,226 per new<br />

residential development unit. All revenue collected from this fee must be used for system<br />

improvements<br />

FUNDING SOURCES: Parks and Recreation Development Impact Fees<br />

89


THIS PAGE INTENTIONALLY LEFT BLANK<br />

90


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Henry Street Pedestrian Crossing Enhancements<br />

Description and Purpose:<br />

Safety improvements and enhancements to the existing Springfield Branch<br />

bike path crossing at Henry Street. <strong>Improvement</strong>s may include pedestrian<br />

crossing warning signage mounted on a mast-arm, lighting, brick pavers or<br />

stamped concrete crossing, directional signage (using remnant stone from the<br />

demolished tunnel), landscape beds, and possibly benches.<br />

Department:<br />

Engineering Services and Parks & Recreation<br />

Fund:<br />

Park Impact Fee <strong>Improvement</strong> Fund (Fund 491)<br />

Justification:<br />

<strong>Improvement</strong>s are necessary to make the crossing more noticeable and<br />

attractive. <strong>Improvement</strong>s should make the crossing utilized more <strong>of</strong>ten. This<br />

work was originally part <strong>of</strong> a final phase <strong>of</strong> the bike path project that was<br />

cancelled.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Fina l E n ginee r ing $ 5 ,0 0 0 $ 5 ,0 0 0<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 0 $ 0<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 5 ,0 0 0 $ 2 0 ,0 0 0 $ 2 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 0<br />

O th e r C ity Fu nd s $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />

Sta te /F ed e ra l<br />

In H ou se (E ng in ee rin g) $ 5 ,0 0 0<br />

T ot a ls $ 5 ,0 0 0 $ 2 0 ,0 0 0 $ 2 5 ,0 0 0<br />

91


THIS PAGE INTENTIONALLY LEFT BLANK<br />

92


CAPITAL IMPROVEMENT PLAN<br />

POLICE IMPACT FEE FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 290,000 387,000 359,000 371,000 383,000<br />

REVENUES<br />

Police Impact Fees 185,000 125,000 100,000 100,000 383,000<br />

Bond/Note Proceeds<br />

TOTAL REVENUE 185,000 125,000 100,000 100,000 383,000<br />

IMPACT FEE EXPENDITURES<br />

Police Cruiser ( 14th unit) 40,000<br />

Early Warning System Expansion 25,000<br />

DEBT SERVICE<br />

Justice Center ($1,100,000 20yrs.) 88,000 88,000 88,000 88,000 88,000<br />

TOTAL IMPACT FEE EXPENDITURES 88,000 153,000 88,000 88,000 88,000<br />

IMPACT FEE BALANCE 387,000 359,000 371,000 383,000 678,000<br />

PURPOSE: The Police <strong>Improvement</strong> Fund identifies future projects and equipment purchases<br />

necessary for operation <strong>of</strong> the <strong>City</strong>'s Police Department. In 2001 the <strong>City</strong> enacted a Police<br />

Facilities Development Impact Fee <strong>of</strong> $162 per single family residential unit and approximately<br />

$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Police<br />

equipment and facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be<br />

spent on replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with<br />

impact fee resources. Replacement vehicles for the Police Department are included in the <strong>CIP</strong><br />

replacement fund.<br />

FUNDING SOURCES: Police Impact Fees<br />

93


THIS PAGE INTENTIONALLY LEFT BLANK<br />

94


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Early Warning System<br />

Description and Purpose:<br />

Purchase <strong>of</strong> complete digital Early Warning Siren unit including pole to add to<br />

the current system.<br />

Department:<br />

Police Department<br />

Fund:<br />

Police Impact Fee Fund (Fund 492)<br />

Justification:<br />

Previously slated for 2009; pushed back to 2010 based on system capacity.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 2 00 9 20 10 20 11 20 12 2 01 3 T o ta ls<br />

Sir en $2 5 ,0 0 0 $2 5 ,0 0 0<br />

T ota ls $2 5 ,0 0 0 $2 5 ,0 0 0<br />

So u rc e o f F un ds 2 00 9 20 10 20 11 20 12 2 01 3 T o ta ls<br />

P olice Im pa ct Fee s $2 5 ,0 0 0 $2 5 ,0 0 0<br />

T ota ls $2 5 ,0 0 0 $2 5 ,0 0 0<br />

95


THIS PAGE INTENTIONALLY LEFT BLANK<br />

96


CAPITAL IMPROVEMENT PLAN<br />

FIRE IMPACT FEE FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 388,914 488,914 445,164 445,164 445,164<br />

REVENUES:<br />

Fire Impact Fees 200,000 165,000 140,000 140,000 0<br />

Bond Issue<br />

TOTAL REVENUE 200,000 165,000 140,000 140,000 0<br />

IMPACT FEE EXPENDITURES:<br />

Command Vehicle 25,000<br />

Training Vehicle 83,750<br />

Land Acquisition Area Substation 100,000 100,000<br />

Construction Station #3 $1,750,000<br />

Annual Debt Service 20yrs. 140,000 140,000 140,000<br />

Construction Station #4 $2,000,000<br />

Annual Debt Service 20yrs. 160,000<br />

TOTAL IMPACT FEE EXPENDITURES: 100,000 208,750 140,000 140,000 300,000<br />

IMPACT FEE BALANCE 488,914 445,164 445,164 445,164 145,164<br />

PURPOSE: The Fire <strong>Improvement</strong> Fund identifies future projects and equipment purchases<br />

necessary for operation <strong>of</strong> the <strong>City</strong>'s Fire/EMS Department. In 2001 the <strong>City</strong> enacted a Fire<br />

Facilities Development Impact Fee <strong>of</strong> $314 per single family residential unit and approximately<br />

$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Fire/EMS<br />

equipment and facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be<br />

spent on replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with<br />

impact fee resources.<br />

FUNDING SOURCES: Fire Impact Fees.<br />

97


THIS PAGE INTENTIONALLY LEFT BLANK<br />

98


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fleet Vehicle Replacement<br />

Description and Purpose:<br />

- Replacement <strong>of</strong> Existing Fleet Vehicles<br />

o Vehicle Replacement Schedule<br />

o Insurance Services Report – October 22, 1998<br />

o T.G. Fire/EMS Services Inc., 2001 Study<br />

o Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />

Goal #2 - Improve Facilities to Match Resource to Risk<br />

Reduce Response Times<br />

o Fire Department Strategic <strong>Plan</strong> – Service Gap<br />

Meet international benchmarks and standard <strong>of</strong> care<br />

Upgrade and modernize existing facilities<br />

Deployment analysis to identify appropriate location <strong>of</strong><br />

facilities to meet the standards <strong>of</strong> coverage.<br />

Department:<br />

Fire Department<br />

Fund:<br />

General Fund (Fund 101)<br />

Fire Impact Fee Fund (Fund 493)<br />

Justification:<br />

The Fire Department fleet vehicles are aging. In 2007, the Fire Department lost<br />

a staff vehicle due to mechanical problems, and it has not been replaced. The<br />

purchase <strong>of</strong> new fleet vehicles in 2009 and 2010 would include the purchase <strong>of</strong><br />

a command vehicle and a training vehicle through Impact Fees. The<br />

Department has proposed a plan to develop a rotation based on the<br />

Department’s Vehicle Replacement <strong>Plan</strong>. These vehicles would allow the<br />

Department to be prepared for Fire Department operations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a t ed E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

C o m m a nd V ehicle $ 2 5 ,0 0 0 $ 0 $ 2 5 ,0 0 0<br />

T ra inin g V eh icle $ 8 3 ,7 5 0 $ 8 3 ,7 5 0<br />

T ot a ls $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

Fire Im p act F ees $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />

T ot a ls $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />

99


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: New Fire Stations<br />

Description and Purpose:<br />

-Fire Station #303 – new building in the <strong>City</strong>’s NW quadrant<br />

• Fire Station located on <strong>City</strong> owned property on Lexington Blvd<br />

between W. Central Ave. and W. William St.<br />

• Decrease response times in the <strong>City</strong>’s NW quadrant<br />

• Provide for current and projected growth<br />

• <strong>City</strong> currently owns the associated land for new fire station<br />

• Approximately 10,000 sq ft building<br />

-Fire Station #304 – new building in the <strong>City</strong>’s SE quadrant<br />

• Fire Station is proposed to be located at/in the <strong>City</strong> water tower<br />

located on Cheshire Rd.<br />

• Decrease response times in the <strong>City</strong>’s SE quadrant<br />

• Provide for current and projected growth<br />

• <strong>City</strong> currently owns the associated land for new fire station<br />

• Build out the interior finish <strong>of</strong> the water tower<br />

• Fire Apparatus Bay area attached to the building<br />

-Fire Station #301 – new building in the <strong>City</strong>’s East side<br />

• Fire Station 301 is proposed to be relocated near the<br />

intersection <strong>of</strong> E Winter St. and Lake St.<br />

• Decrease response times in the <strong>City</strong>’s East side<br />

• The Fire Station would serve as the main headquarters and<br />

administrative <strong>of</strong>fices for the Fire Department<br />

• Ohio Wesleyan University has expressed interest in purchasing<br />

the property that Fire Station 301 is located<br />

• Provide for current and projected growth<br />

• Fire Station could serve as the catalyst for redevelopment on the<br />

East side <strong>of</strong> the <strong>City</strong><br />

• <strong>City</strong> currently does not own the associated land for new fire<br />

station<br />

-Fire Station construction costs are currently running @ $200/ sq ft.<br />

-T.G. Fire/EMS Services Inc., 2001 Study<br />

-Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />

• Goal #2 – Improve Facilities to Match Resource to Risk Reduce<br />

Response Times<br />

-Fire Department Strategic <strong>Plan</strong> – Service Gap<br />

• Meet international benchmarks and standard <strong>of</strong> care<br />

• Upgrade and modernize existing facilities<br />

• Deployment analysis to identify appropriate location <strong>of</strong> facilities<br />

to meet the standards <strong>of</strong> coverage.<br />

100


Department:<br />

Fire Department<br />

Fund:<br />

Fire Impact Fee Fund (Fund 493)<br />

Justification:<br />

-Fire Department is currently responding to 57% <strong>of</strong> the calls within 4-<br />

minutes <strong>of</strong> drive time<br />

-<strong>City</strong> Comprehensive <strong>Plan</strong> states within 4-minutes 90% <strong>of</strong> the time<br />

-GIS Studies, indicate that this would increase our response times to<br />

77% within 4-minutes<br />

-2007-2012 Fire Department Strategic <strong>Plan</strong> identified internal and<br />

external stakeholders as one <strong>of</strong> the most important issues facing<br />

the Fire Department. This relates specifically to Goal # 2<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

C o nst ru ction St a tio n 3 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 4 2 0 ,0 0 0<br />

C o nst ru ction St a tio n 4 $ 1 6 0 ,0 0 0 $ 1 6 0 ,0 0 0<br />

L a nd A cq . S ub sta t ions $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 0 0 ,0 0 0<br />

T ot a ls $ 0 $ 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 0<br />

Im p ac t F ees/ B o nd s $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />

M un icip a l B on d s $ 0<br />

P riv at e F un d ing (O W U) $ 0<br />

St a t e/ Fed era l $ 0<br />

T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />

101


THIS PAGE INTENTIONALLY LEFT BLANK<br />

102


CAPITAL IMPROVEMENT PLAN<br />

MUNI<strong>CIP</strong>AL SERVICES IMPACT FEE FUND<br />

2009-2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCE FORWARD 466,766 467,266 417,766 343,266 268,766<br />

REVENUES:<br />

Impact Fees 200,000 150,000 125,000 125,000 125,000<br />

Bond/Note Proceeds - Justice Center -<br />

Bond/Note Proceeds - Public Works Garage<br />

TOTAL REVENUES 200,000 150,000 125,000 125,000 125,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Public Works Facility ($1,404,000 20yrs.) 103,500 103,500 103,500 103,500 103,500<br />

Justice Center ($1,200,000 20yrs.) 96,000 96,000 96,000 96,000 96,000<br />

TOTAL EXPENDITURES 199,500 199,500 199,500 199,500 199,500<br />

IMPACT FEE BALANCE 467,266 417,766 343,266 268,766 194,266<br />

PURPOSE: The Municipal Services Fund identifies future projects and equipment purchases<br />

necessary for operation <strong>of</strong> the <strong>City</strong>'s Various Departments. In 2006 the <strong>City</strong> enacted a Municipal<br />

Services Development Impact Fee <strong>of</strong> $366 per single family residential unit and approximately<br />

$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Municipal<br />

facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be spent on<br />

replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with impact fee<br />

resources.<br />

FUNDING SOURCES: Municipal Facilities Impact Fees.<br />

103


104


CAPITAL IMPROVEMENT PROGRAM<br />

WATER FUND CAPACITY PROJECTS<br />

2009-2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCES FORWARD 1,487,102 2,077,697 2,724,392 2,355,101 2,179,810<br />

REVENUES:<br />

Water Capacity Fees 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000<br />

Water Rate Increase 10% 2010 187,500 375,000 382,500 390,000<br />

Water Rate Increase 10% 2011 187,500 375,000 382,500<br />

Water Rate Increase 0% 2012 0 0<br />

JRS Grant 2,000,000<br />

Bond Proceeds 8,205,000 11,000,000 0<br />

TOTAL REVENUES 9,205,000 12,187,500 3,562,500 1,757,500 1,772,500<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Westside Trans. Line ($4,500,000 25 yrs.) 361,520 361,520 361,520<br />

Kingman Hill Tower ($3,545,000 25 yrs.) 239,405 240,805 242,005 243,005 243,005<br />

<strong>Plan</strong>t Expansion ($15,230,000 25yrs.) 1,128,266 1,128,266 1,128,266<br />

TOTAL DEBT SERVICE 239,405 240,805 1,731,791 1,732,791 1,732,791<br />

PLANT CAPACITY PROJECTS<br />

Treatment <strong>Plan</strong>t Expansion<br />

Design 850,000<br />

Construction 500,000 11,000,000<br />

WATER SUPPLY PROJETS<br />

Penry Rd. Wellfield 2,385,000<br />

DISTRIBUTION CAPACITY PROJECTS<br />

Westside Transmission Line 4,000,000<br />

Sawmill Parkway Waterline 100,000 100,000 2,000,000<br />

Panhandle Rd. Waterline (lowhead dam) 340,000<br />

New Line Oversizing 200,000 200,000 200,000 200,000 200,000<br />

TOTAL WATER CAPACITY PROJECTS 8,375,000 11,300,000 2,200,000 200,000 200,000<br />

ENDING FUND BALANCE 2,077,697 2,724,392 2,355,101 2,179,810 2,019,519<br />

105


106


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Sawmill Parkway Waterline Extension<br />

Description and Purpose:<br />

Design and construction <strong>of</strong> a waterline with the Sawmill Parkway Extension.<br />

Department:<br />

Public Utilities & Engineering Departments<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Provide potable water service to the SW area <strong>of</strong> the <strong>City</strong> with a possible Jobs<br />

Ready Grant.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

Fina l E n ginee r ing $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 2 , 0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 , 0 0 0 ,0 0 0 $ 2 ,2 0 0 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

Job s Re a dy Gr a nt $ 2 , 0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />

T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 , 0 0 0 ,0 0 0 $ 2 ,2 0 0 , 0 0 0<br />

107


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Penry Road Raw Water Line<br />

Description and Purpose:<br />

Construction <strong>of</strong> the water transmission line from the Penry Wellfield to the<br />

Water Treatment <strong>Plan</strong>t. The transmission line will double the <strong>City</strong>’s well water<br />

supply from the current 2MGD to 4MGD. The additional well water will help in<br />

lowering nitrates, atrazine, and stage 2 disinfectant by-product levels because<br />

<strong>of</strong> the lower levels <strong>of</strong> organic material in the well water as opposed to the river<br />

water supply.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Fund Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Necessary for additional water treatment capacity. Easements & design work<br />

are currently under way and construction is needed in order to supply water to<br />

the new proposed membrane plant pilot study scheduled as part <strong>of</strong> the Water<br />

Master <strong>Plan</strong>.<br />

Recommended Funding:<br />

E s t im a te d E x p e n d it u r es 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta ls<br />

T ra ff ic<br />

E n v ir o n m e n t a l $ 7 5 ,0 0 0 $ 7 5 ,0 0 0<br />

R / W C on s u lt a n t $ 5 5 ,0 0 0 $ 5 5 ,0 0 0<br />

R / W P u r c h a s e $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

A d m in s t ra t iv e<br />

C o n s t ru c t io n $ 1 ,9 0 0 , 0 0 0 $ 1 ,9 0 0 , 0 0 0<br />

C h an g e O rd e r/ C o n t in g e n c y<br />

R E C O M M E N D E D F U N D I N G<br />

C o n s t ru c t io n En g in e e rin g $ 1 9 0 ,0 0 0 $ 1 9 0 ,0 0 0<br />

In s p e c t io n $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />

S o u r c e o f F u n d s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta ls<br />

G e n e r al F u n d<br />

O th e r C ity F u n d s $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />

M u n ic ip a l B o n d s<br />

T ot a ls $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />

108


Pictures and Drawings:<br />

109


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Panhandle Road Waterline<br />

Description and Purpose:<br />

Project involves construction <strong>of</strong> a 12” water line crossing the river at the<br />

Panhandle Road low-head dam.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536) – Design in 2008 <strong>CIP</strong><br />

Justification:<br />

Larger water line needed to serve existing customers and additional capacity<br />

for future development in our service area. Water line construction is in<br />

conjunction with the removal <strong>of</strong> the low-head dam.<br />

Recommended Funding:<br />

Estim a te d Expe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Ad minstra tive<br />

Co nstru ctio n $3 00,000 $300,000<br />

Ch an ge O rd er/Co ntingen cy<br />

Co nstru ctio n En ginee ring $ 25,000 $25,000<br />

In spection $ 15,000 $15,000<br />

Tota ls $3 40,000 $340,000<br />

Sour c e <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d<br />

O th er C ity Fu nds $3 40,000 $340,000<br />

M un icipa l Bon ds<br />

Priva te F un din g<br />

Sta te /F edera l<br />

Tota ls $3 40,000 $340,000<br />

110


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Groundwater Membrane <strong>Plan</strong>t<br />

Description and Purpose:<br />

The construction <strong>of</strong> a rated 3MGD Groundwater Membrane <strong>Plan</strong>t which<br />

will treat the water coming from all the well fields and then blend it with<br />

the river water being treated by the existing plant. This will increase the<br />

total water treatment capacity by an additional 3 million gallons per day.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

The membrane plant will increase water treatment capacity and help the water<br />

quality by reducing the Stage II Disinfectant by-products, nitrate and atrazine<br />

levels and helping to produce a s<strong>of</strong>ter and higher quality water able to meet the<br />

increasing EPA regulations<br />

Recommended Funding:<br />

Price estimated by engineering firm.<br />

R E C O M M E N DE D FU N D IN G<br />

E s t im a te d E x p e nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Stu d y $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

E nvir on m ent a l $ 9 0 ,0 0 0 $ 9 0 ,0 0 0<br />

P re lim in a ry E n gine er ing $ 1 5 5 ,0 0 0 $ 1 5 5 ,0 0 0<br />

F ina l E n ginee r ing $ 6 0 5 ,0 0 0 $ 5 5 5 ,0 0 0<br />

C o nst ru ct io n $ 1 0 ,6 3 5 ,0 0 0 $ 1 0 ,6 3 5 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

In s p ec t ion $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 1 ,3 5 0 , 0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

C a p a city F ee s/ B ond s $ 1 ,3 5 0 , 0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 5 0 ,0 0 0<br />

Sta te /F ed e ra l<br />

T ot a ls $ 8 0 0 ,0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 5 0 ,0 0 0<br />

111


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Hills-Miller Road 24-inch Water Line Extension<br />

Description and Purpose:<br />

Construction <strong>of</strong> a 13,000 LF extension <strong>of</strong> the 24-inch distribution main along<br />

Hills-Miller Road, west <strong>of</strong> the CSX railway, east and then north along US23 to<br />

the Water <strong>Plan</strong>t.<br />

Department:<br />

Department <strong>of</strong> Engineering Services & Utility Department<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Project is the final phase <strong>of</strong> a necessary improvement to the distribution system<br />

and when complete, provides required redundancy in the system over the 100<br />

year old 16-inch line parallel to US23.<br />

Updates/Changes:<br />

A 400 ft portion <strong>of</strong> this project from Merrick Blvd. to Hills-Miller Rd was<br />

constructed in 2005 in conjunction with the TSC development project on the<br />

west side <strong>of</strong> US-23. Engineering will continue in early 2008 with R/W for<br />

approximately 30 properties. Construction <strong>of</strong> remaining portion <strong>of</strong> extension<br />

estimated to begin in 2009.<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N DI N G<br />

E st im a te d E x pe n dit ur e s 2 009 20 10 20 11 20 12 2 01 3 T o t a ls<br />

C o nst ru ct io n $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 008 20 09 20 10 20 11 2 01 2 T o t a ls<br />

W a t er Fun d s $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

112


Pictures and Drawings:<br />

113


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Waterline Oversizing<br />

Description and Purpose:<br />

Extensions and oversizing <strong>of</strong> water lines per development agreements<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Proper over sizing <strong>of</strong> waterlines as needed per development agreements<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />

Adminstrative<br />

Construction $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

Change Order/Contingency<br />

Construction Engineering<br />

Inspection<br />

RECOMMENDED FUNDING<br />

Totals $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />

General Fund<br />

Other <strong>City</strong> Funds $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

Municipal Bonds<br />

Private Funding<br />

State/Federal<br />

Totals $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

114


CAPITAL IMPROVEMENT PROGRAM<br />

WATER FUND MAINTENANCE PROJECTS<br />

2009 - 2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCES FORWARD 383,750 506,350 11,026,350 1,656,350 1,796,558<br />

REVENUES:<br />

Transfer from Water Fund 677,600 700,000 745,000 790,000 825,000<br />

Transfer from Water Fund Reserve 800,000<br />

Add'l Transfer 10% Rate Increase 2012 0 365,000 370,000<br />

Bond/Note Proceeds 800,000 10,500,000<br />

TOTAL REVENUES 1,477,600 11,200,000 1,545,000 1,155,000 1,195,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Treatment <strong>Plan</strong>t ($10,500,000 - 25 yrs) 0 839,792 839,792<br />

WATER TREATMENT PROJECTS<br />

Treatment <strong>Plan</strong>t Rehabilitation 800,000 10,500,000<br />

Lagoon Cleaning 450,000<br />

TREATMENT PLANT SUB-TOTAL 800,000 0 10,500,000 0 450,000<br />

WATER DISTRIBUTION PROJECTS<br />

Water Meter Replacement 25,000 25,000 25,000 25,000 25,000<br />

Water Meter New Installation 25,000 25,000 25,000 25,000 25,000<br />

Chlorine Booster Tank for SE Highland Tower<br />

Backhoe 90,000<br />

Dump Truck 105,000<br />

Water Line <strong>Improvement</strong>s<br />

Small Main/Service Replacement 50,000 50,000 50,000 50,000 50,000<br />

Fire Flow <strong>Improvement</strong> 75,000 75,000 75,000 75,000 75,000<br />

Hillside Dr. Orchard Lane Waterline 140,000<br />

Blymer St. Waterline 160,000<br />

Fair Ave. Waterline 115,000<br />

Eastwood Ave. Waterline Replacement 100,000<br />

US23 Waterline Replacement 400,000<br />

ODOT William St. Culvert Waterline Relocation 175,000<br />

WATER DISTRIBUTION SUB-TOTAL 555,000 680,000 415,000 175,000 335,000<br />

TOTAL WATER REPAIR AND MAINT. 1,355,000 680,000 10,915,000 1,014,792 1,624,792<br />

ENDING FUND BALANCE 506,350 11,026,350 1,656,350 1,796,558 1,366,766<br />

115


116


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Water Meter New Installation (New Residential)<br />

Description and Purpose:<br />

Purchase <strong>of</strong> water meters for new residential installs.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water meters for new installations. These costs are reimbursed by the builder.<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 To tals<br />

R/W Purchase<br />

Ad minstrative<br />

Construction $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Construction Enginee ring<br />

Inspection<br />

RECOMM ENDE D FUNDING<br />

Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General Fund<br />

Other <strong>City</strong> Funds $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Municipal Bonds<br />

Totals $ 20,000 $20 ,000 $20,000 $20,0 00 $20,000 $125,000<br />

117


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: US 23 Waterline Replacement<br />

Description and Purpose:<br />

Construction <strong>of</strong> an 8” water line on Route US-23 North.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water line to fill in gaps <strong>of</strong> water service along Rt. 23 N to allow taking the old<br />

16” water transmission main out <strong>of</strong> service. Existing 16” water main has been<br />

in continuous service since 1889 and its useful life has been surpassed.<br />

Repairs to this 16 inch main are costly, difficult, and temporarily impairs the<br />

Water <strong>Plan</strong>t capability to provide the necessary flow rates required.<br />

<strong>Improvement</strong>s for this project are defined in the 1986 Water System Master<br />

<strong>Plan</strong> study.<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />

Prelimin ary En gineer ing<br />

Final En gineer ing $45 ,000 $45,000<br />

R/W Pur chase<br />

Ad minstrative<br />

Co nstru ctio n $355 ,000 $355,000<br />

Co nstru ctio n En ginee ring<br />

In spection<br />

Totals $400 ,000 $400,000<br />

Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />

Gener al F un d<br />

Oth er C ity Fu nds $400 ,000 $400,000<br />

Mun icipal Bon ds<br />

State /F ederal<br />

Totals $400 ,000 $400,000<br />

118


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Treatment <strong>Plan</strong>t Rehabilitation<br />

Description and Purpose:<br />

Rehabilitation <strong>of</strong> existing water treatment plant. This project is part <strong>of</strong> the new<br />

Water Master <strong>Plan</strong> to help extent the life <strong>of</strong> the existing water plant.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Program is needed to increase life <strong>of</strong> existing plant. The water plant was built<br />

in 1930’s and has been upgraded several times. A recent condition assessment<br />

showed that the current facilities are not suited for expansion or upgrade. The<br />

original concrete structures will require partial repair / reconstruction due to<br />

age, several unit processes do not meet current EPA design standards, building<br />

code violations have been identified, and the current plant is located within the<br />

Olentangy River flood plain.<br />

Recommended Funding:<br />

Est im a te d Expe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T ot a ls<br />

Tra ff ic<br />

E nv ir on m enta l $120,000 $12 0,000<br />

Prelim in a ry E n gine ering $210,000 $21 0,000<br />

Fina l E n gineer ing $470,000 $47 0,000<br />

Co nstru ction $10,160 ,000 $ 10,160, 000<br />

Ch an ge O r der/ Co nting ency<br />

RE CO M M E ND ED F UND ING<br />

Co nstru ction E ngin eering $ 225,000 $22 5,000<br />

In spection $ 115,000 $11 5,000<br />

Tota ls $800,000 $10,500 ,000 $ 11,300, 000<br />

Sou rc e <strong>of</strong> F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T ot a ls<br />

G ener al Fun d<br />

O th er <strong>City</strong> Fu nds $800,000 $10,500 ,000 $ 11,300, 000<br />

M un icipa l Bon ds<br />

Tota ls $800,000 $10,500 ,000 $ 11,300, 000<br />

119


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Small Main Replacement<br />

Description and Purpose:<br />

Replacement <strong>of</strong> small (4 inch and less) water mains that have been prone to<br />

failures, represent water quality issues.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Will improve reliability <strong>of</strong> the water system, reduce water loss, and improve<br />

water quality issues in the water distribution system. This is a 1986 Water<br />

System Master <strong>Plan</strong> recommendation.<br />

Recommended Funding:<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Ad minstrative<br />

Construction $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

RECOMM ENDE D FUN DIN G<br />

Totals $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

Municipal Bonds<br />

Totals $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

120


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : ODOT Culvert Waterline Relocation Project<br />

Description and Purpose:<br />

Relocation <strong>of</strong> the water main at William St. & Liberty St. prior to the ODOT<br />

Culvert replacement.<br />

Department:<br />

Engineering & Public Utilities Departments<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water main is in conflict with the ODOT culvert project and must be relocated.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />

121


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Lime Lagoon Cleaning<br />

Description and Purpose:<br />

Removal <strong>of</strong> lime sludge from lagoons at the Water Treatment <strong>Plan</strong>t. The lagoons<br />

temporarily store the lime sludge, but when they reach its holding capacity<br />

they must be cleaned.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Sludge lagoons will have reached their holding capacity.<br />

Recommended Funding:<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Ad minstrative<br />

Construction $450,000 $450,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

Totals $450,000 $450,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $450,000 $450,000<br />

Municipal Bonds<br />

Private F unding<br />

State /F ederal<br />

Totals $450,000 $450,000<br />

122


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Hillside Dr / Orchard Lane Waterline<br />

Description and Purpose:<br />

Replacement <strong>of</strong> the existing 2” water line on a section <strong>of</strong> Hillside Drive with an<br />

8” water main. No water main exists on Orchard Lane.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Fire flow capacity improvement and water quality issue resolution. Refer to<br />

recommendations established by the 1986 Water System Master <strong>Plan</strong>.<br />

Recommended Funding:<br />

E s t im a t e d E xp e n d it u re s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 T o t a ls<br />

A d m in s tra tiv e<br />

C o n s truc tio n $ 140 ,00 0 $ 140 ,00 0<br />

C h a ng e O rde r/C o n ting e nc y<br />

C o n s truc tio n E n gin e e ring<br />

Ins p e c tio n<br />

R E C O M M E N D E D F U N D IN G<br />

T o ta ls $ 140 ,00 0 $ 140 ,00 0<br />

S o u rc e o f F u n d s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 T o t a ls<br />

G e n e ra l F u n d<br />

O th e r C ity F u n ds $ 140 ,00 0 $ 140 ,00 0<br />

M u nic ip a l B o n d s<br />

S ta te /F e d e ra l<br />

T o ta ls $ 140 ,00 0 $ 140 ,00 0<br />

123


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fire Flow <strong>Improvement</strong>s<br />

Description and Purpose:<br />

<strong>Improvement</strong> <strong>of</strong> fire flow capacity for existing water mains.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Funds to help increase size <strong>of</strong> water lines for fire flow capacity purposes. This<br />

is a 1986 Water System Master <strong>Plan</strong> recommendation.<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />

Adminstrative<br />

Construction $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

Change Order/Contingency<br />

Construction Engineering<br />

Inspection<br />

RECOMMENDED FUNDING<br />

Totals $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />

General Fund<br />

Other <strong>City</strong> Funds $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

Municipal Bonds<br />

State/Federal<br />

Totals $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

124


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fair Ave. & East St. Waterlines<br />

Description and Purpose:<br />

Replacement <strong>of</strong> existing water small main to improve fire flow capability. No<br />

water main exists on East Street.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Improves fire flow capabilities, and upgrades service line connections. Refer to<br />

recommendation established by the 1986 Water System Master <strong>Plan</strong> study.<br />

Recommended Funding:<br />

Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Prelimin ary En gineer ing<br />

Final En gineer ing<br />

Ad minstrative<br />

Co nstru ctio n $1 15,000 $115,000<br />

Ch an ge O rd er/Co ntingen cy<br />

In spection<br />

R ECO MM ENDE D FUN DIN G<br />

Totals $1 15,000 $115,000<br />

Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Gener al F un d<br />

Oth er C ity Fu nds $1 15,000 $115,000<br />

Mun icipal Bon ds<br />

State /F ederal<br />

Totals $1 15,000 $115,000<br />

125


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Eastwood Ave. Waterline<br />

Description and Purpose:<br />

Replacement <strong>of</strong> an existing aged 6” water main with a history <strong>of</strong> both main and<br />

service line failure, with a new 8” ductile iron main, new service lines and<br />

meter pit connections.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Eliminates frequent repairs to this water main that is prone to failure and<br />

improves fire flow capacity.<br />

Recommended Funding:<br />

Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Final En gineer ing<br />

Ad minstrative<br />

Co nstru ctio n $100, 000 $100,000<br />

Ch an ge O rd er/Co ntingen cy<br />

Co nstru ctio n En ginee ring<br />

In spection<br />

R ECO MM ENDE D FUN DIN G<br />

Totals $100, 000 $100,000<br />

Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Gener al F un d<br />

Oth er C ity Fu nds $100, 000 $100,000<br />

Mun icipal Bon ds<br />

State /F ederal<br />

Totals $100, 000 $100,000<br />

126


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Dump Truck<br />

Description and Purpose:<br />

Purchase <strong>of</strong> a Water Distribution Tandem Axle Dump Truck<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Replacement <strong>of</strong> the existing 2 ton dump truck that has exceeded its useful life<br />

and is prone to repairs.<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />

Adminstrative<br />

Construction<br />

Change Order/Contingency<br />

Construction Engineering<br />

Inspection<br />

RECOMMENDED FUNDING<br />

Totals $105,000 $105,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />

General Fund<br />

Other <strong>City</strong> Funds $105,000 $105,000<br />

Municipal Bonds<br />

Private Funding<br />

State/Federal<br />

Totals $105,000 $105,000<br />

127


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Blymer St Water Main<br />

Description and Purpose:<br />

Construction <strong>of</strong> an 8” water main on Blymer St. from E. Lincoln Ave. to<br />

Fountain Ave. then west on Fountain to N. Union St.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

<strong>Improvement</strong> <strong>of</strong> fire flow capacity with the replacement <strong>of</strong> the existing 4”<br />

waterline. Project defined in the 1986 Water System Master <strong>Plan</strong>.<br />

Recommended Funding:<br />

RECOMM ENDE D FUN DIN G<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Final Engineering<br />

Ad minstrative<br />

Construction $160,000 $160,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

Totals $160,000 $160,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $160,000 $160,000<br />

Municipal Bonds<br />

State /F ederal<br />

Totals $160,000 $160,000<br />

128


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Backhoe<br />

Description and Purpose:<br />

Replacement <strong>of</strong> the Water Distribution existing “front line” backhoe that has<br />

reached the end <strong>of</strong> its current functional life cycle. A reliable properly<br />

configured backhoe is an indispensable piece <strong>of</strong> equipment for the water<br />

distribution daily system maintenance function.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

The existing “front line” back hoe will be retained to replace the existing<br />

“backup” backhoe. The “backup” unit serves to replace the “front line” unit as<br />

needed and as the aggregate loader at the stockpile location. The “backup” unit<br />

has long since been incapable <strong>of</strong> serving as a replacement for the “front line”<br />

unit, and has been prone to many failures.<br />

Recommended Funding:<br />

R ECOMM ENDE D FUN DIN G<br />

Estim ated Expend itures 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Ad minstrative<br />

Construction<br />

Ch an ge Ord er/Contingen cy<br />

Construction En ginee ring<br />

In spection<br />

Totals $ 90,000 $90,000<br />

Source <strong>of</strong> Funds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Gener al F un d<br />

Oth er C ity Funds $ 90,000 $90,000<br />

Mun icipal Bon ds<br />

Totals $ 90,000 $90,000<br />

129


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Water Meter Replacement<br />

Description and Purpose:<br />

Replacement <strong>of</strong> aged inaccurate water meters. Some <strong>of</strong> these meter<br />

installations are also not remoted.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water fund and Waste Water fund share this cost. Inaccurate meters and nonremoted<br />

meters represent income stream and operational inefficiencies. These<br />

meter conditions are being improved on a continuous basis (there are 11,000+<br />

meters <strong>of</strong> various size in the system) for the benefit <strong>of</strong> both Utilities (Water &<br />

Sewer) hence the funding from both.<br />

Recommended Funding:<br />

RECOMM ENDE D FUN DIN G<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Construction $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Municipal Bonds<br />

Private F unding<br />

State /F ederal<br />

Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

130


CAPITAL IMPROVEMENT PROGRAM<br />

SEWER FUND CAPACITY PROJECTS<br />

2009 - 2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCES FORWARD 500,000 227,264 (70,007) (190,672) (272,854)<br />

REVENUES:<br />

Sewer Capacity Fees 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000<br />

SE Highland Sewer ERU Fees 68,250 71,663 75,246 78,000 78,000<br />

Sewer Fees Transfer - 15% 2007 619,000 631,380 644,000 656,890 670,025<br />

Sewer Fees Transfer - 15% 2008 619,000 631,380 644,000 656,890 670,025<br />

Sewer Fees Transfer - 15% 2009 389,600 631,380 644,000 656,890 670,025<br />

JRS Grant 3,000,000<br />

Bond Proceeds - SE Highland Sewer<br />

TOTAL REVENUES 2,795,850 3,065,803 6,107,246 3,148,670 3,188,075<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Land Armstrong Rd./23 N. Sewer $4,715,000 20yrs. 350,815 349,315 352,140 349,293 349,293<br />

230 North Sewer 67,132 66,132 70,132 68,932 68,932<br />

SE Highland Sewer $15,000,000, 5.5%, 25 yrs. 1,036,988 1,045,000 1,051,988 1,051,988<br />

SE Highland Sewer $2,800,000, 20 yrs. OWDA 204,879 204,879 204,879 204,879 204,879<br />

<strong>Plan</strong>t Expansion $21,262,000, 20 yrs. OWDA 1,555,760 1,555,760 1,555,760 1,555,760 1,555,760<br />

TOTAL DEBT SERVICE 2,178,586 3,213,074 3,227,911 3,230,852 3,230,852<br />

COLLECTION CAPACITY PROJECTS<br />

Pr<strong>of</strong>essional Services<br />

US23/US42 30" Sewer Belle Ave. to Cherry St. 490,000<br />

Sawmill Parkway Sewer Extension 150,000 150,000 3,000,000<br />

Columbus Pike Sanitary Sewer 100,000<br />

East St. Sewer 150,000<br />

TOTAL SEWER CAPACITY PROJECTS 890,000 150,000 3,000,000 0 0<br />

ENDING FUND BALANCE 227,264 (70,007) (190,672) (272,854) (315,631)<br />

131


132


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Columbus Pike Sanitary Sewer<br />

Description and Purpose:<br />

The project extends a sanitary sewer along Columbus Pike just north <strong>of</strong><br />

Cheshire Road. Currently, the existing homes on septic systems and the<br />

residents have requested the <strong>City</strong> extend sanitary sewer service to the area.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Capacity Fee Fund (Fund 546)<br />

Justification:<br />

This project eliminates the septic systems and provides sanitary sewer service<br />

in the area. The residents would be required to pay a front footage fee and<br />

applicable capacity fees.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

133


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Sawmill Parkway Sanitary Sewer Extension<br />

Description and Purpose:<br />

Design and construction <strong>of</strong> a sanitary sewer main as a part <strong>of</strong> the Sawmill<br />

Parkway project.<br />

Department:<br />

Public Utilities & Engineering Departments<br />

Fund:<br />

Wastewater Capacity Fee Fund (Fund 546)<br />

Justification:<br />

Project will provide sanitary sewer services to the SW area <strong>of</strong> the <strong>City</strong> with the<br />

Sawmill Parkway extension. Part <strong>of</strong> the <strong>City</strong>’s Jobs Ready Grant application.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

Fina l E n ginee r ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 3 , 0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 , 0 0 0 ,0 0 0 $ 3 ,3 0 0 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

Job s Re a dy Gr a nt $ 3 , 0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 , 0 0 0 ,0 0 0 $ 3 ,3 0 0 , 0 0 0<br />

134


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: US23/RT 42 30-inch Belle Ave/Cherry St Sanitary Sewer<br />

Description and Purpose:<br />

Construction <strong>of</strong> the 30-inch sewer at Belle Ave under US23/RT42 to tie into the<br />

42-inch sewer on Stratford Rd to Cherry St. to provide additional sewer<br />

capacity to the SW area <strong>of</strong> the <strong>City</strong>.<br />

Department:<br />

Public Utilities & Engineering Department<br />

Fund:<br />

Wastewater Capacity fee fund (Fund 546)<br />

Justification:<br />

Project currently in the design phase, field investigations <strong>of</strong> the Stratford<br />

Rd/Cherry St sewer revealed the sewer is deteriorated due to H2S from the<br />

force main. This project is the first phase <strong>of</strong> improvements for the Industrial<br />

Park area as recommended in the 2007 report.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 4 5 0 ,0 0 0 $ 4 5 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

In s p ec t ion $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

T ot a ls $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

135


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: East Street Sewer<br />

Description and Purpose:<br />

The project extends a sanitary sewer along East Street. Currently, existing<br />

homes along East Street use long laterals that connect to existing sewer on<br />

adjacent streets. In addition, there are buildable lots along East Street that do<br />

not have access to sanitary sewer.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Capacity Fee Fund (Fund 546)<br />

Justification:<br />

This project eliminates the existing long laterals and provides sanitary sewer<br />

service to the area. In addition, long laterals are potentially a high infiltration<br />

source.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

136


CAPITAL IMPROVEMENT PROGRAM<br />

SEWER FUND MAINTENANCE PROJECTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 1,000,000 1,496,008 1,732,016 2,497,017 1,853,458<br />

REVENUES:<br />

Transfer from Sewer Fund 1,349,837 1,349,837 1,403,830 1,425,000 1,425,000<br />

TOTAL REVENUES 1,349,837 1,349,837 1,403,830 1,425,000 1,425,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Current Debt Service 357,120 357,120 357,120 357,120 357,120<br />

<strong>Plan</strong>t Rehabilitation ($1,800,000 20 yrs. 3.52%) 131,709 131,709 131,709 131,709 131,709<br />

TOTAL DEBT SERVICE 488,829 488,829 488,829 488,829 488,829<br />

WASTEWATER TREATMENT PROJECTS<br />

Sludge Transport Truck 125,000<br />

Tertiary Filter Building Equipment 500,000<br />

Disinfection 50,000 55,000<br />

WASTEWATER COLLECTION PROJECTS<br />

Inflow/Infiltration Remediation 100,000 100,000 100,000 100,000 100,000<br />

Toledo Street Sewer Rehab 80,000<br />

Columbus Avenue Sewer Rehab 115,000<br />

Weselyan Woods 150,000<br />

William & Liberty Sewer Relocation 220,000<br />

Wastewater Service Area Facilities <strong>Plan</strong> 50,000<br />

Sewer Camera Truck Equipment 20,000<br />

Sewer Jet Truck 300,000<br />

Sewer Cleaning Unit 180,000<br />

Backhoe 90,000<br />

TOTAL SEWER REPAIR/MAINTENANCE 365,000 625,000 150,000 605,000 690,000<br />

ENDING FUND BALANCE 1,496,008 1,732,016 2,497,017 2,828,188 2,099,629<br />

137


138 34


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Toledo Street Sewer Rehabilitation<br />

Description and Purpose:<br />

The sanitary sewer is broken down in several areas and is a significant source<br />

<strong>of</strong> infiltration/inflow. The repairs consist <strong>of</strong> spot repairs, sewer lining, sewer<br />

grouting and lining <strong>of</strong> the manholes.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

A CCTV inspection in February 2008 revealed numerous deficiencies allowing<br />

heavy infiltration to enter the sanitary sewer main. These flows decrease<br />

capacity <strong>of</strong> the WWTP and cause OEPA permit violations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

T ot a ls $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

T ot a ls $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

139


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Sewer Jet Truck<br />

Description and Purpose:<br />

These funds would be used to replace the existing 1999 combination sewer<br />

cleaning truck. This unit is used to perform preventive maintenance and<br />

remove blockages from the collection systems.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The current primary unit (1999 unit) has past its effective life cycle and needs<br />

replaced.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

O th e r $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

140


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />

Project: Sewer Camera Truck Equipment<br />

Description and Purpose:<br />

These funds would be used to replace the existing computer, video capturing<br />

system, and s<strong>of</strong>tware in the collection systems CCTV sewer inspection unit.<br />

Department:<br />

Public Utilities – Sewer Fund - Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

These updates would allow for easier access to the inspection video and would<br />

integrate with our CMMS.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $2 0 ,0 0 0 $ 2 0, 00 0<br />

T o ta ls $2 0 ,0 0 0 $ 2 0, 00 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $2 0 ,0 0 0 $ 2 0, 00 0<br />

T o ta ls $2 0 ,0 0 0 $ 2 0, 00 0<br />

141


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Inflow/Infiltration Remediation<br />

Description and Purpose:<br />

The project consists <strong>of</strong> securing pr<strong>of</strong>essional services to locate, identify, and<br />

repair various sources <strong>of</strong> infiltration and inflow found in the sanitary sewer<br />

system. Infiltration and inflow cause’s sanitary sewer backups into homes and<br />

increases flow to the WWTP. These flows decrease capacity <strong>of</strong> the WWTP and<br />

cause OEPA permit violations. This program has been in effect for the past 4<br />

years and has made significant reductions in local infiltration and inflow<br />

problems. (grouting, sliplining)<br />

Department:<br />

Public Utilities – Sewer Fund – Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The <strong>City</strong>’s CCTV inspection program has identified numerous areas <strong>of</strong><br />

infiltration located within the <strong>City</strong>’s collection system. These areas include<br />

Sunbury Road (405’), William Street (245’), Central Avenue (769’), Smith Street<br />

(214’), Chamberlain Street (245’), Parson Avenue (184’), Winter Street (2521’),<br />

Milo Street (340’) any many others.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

I & I $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

142


Pictures and Drawings:<br />

The impact <strong>of</strong> inflow and infiltration on our network is represented in the following diagram.<br />

Dry weather flows - low inflow / infiltration<br />

Wet weather flows - high inflow / infiltration<br />

Off peak network load Peak network load Off peak network load Peak network load<br />

Wastewater pipes are underground and invisible. Most people do not consider that these pipes need maintenance<br />

like the rest <strong>of</strong> their property. Infiltration is an unseen problem and does not usually alert property owners that<br />

something may be wrong with their wastewater pipes.<br />

143


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Combination Sewer Cleaning Unit<br />

Description and Purpose:<br />

These funds would be used to replace the existing 1988 combination sewer<br />

cleaning truck with a combination sewer cleaning unit. This new smaller unit<br />

would service as the secondary unit to the existing 1999 combination sewer<br />

cleaning truck (replacement 2012). These units are used to perform preventive<br />

maintenance and remove blockages from the collection systems.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The current secondary unit (1988 unit) has past its effective life cycle and is<br />

prone to failures and inefficiencies.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

O th e r $ 1 8 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />

144


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Columbus Avenue Sewer Rehabilitation<br />

Description and Purpose:<br />

The sanitary sewer is broken down in several areas and is a significant source<br />

<strong>of</strong> infiltration/inflow. The repairs consist <strong>of</strong> spot repairs, sewer lining, sewer<br />

grouting and lining <strong>of</strong> the manholes.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

A CCTV inspection in March 2008 revealed numerous deficiencies allowing<br />

heavy infiltration to enter the sanitary sewer main. These flows decrease<br />

capacity <strong>of</strong> the WWTP and cause OEPA permit violations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D I N G<br />

E s t im a t ed<br />

E x p e n d i tu re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta l s<br />

C o n s t ru c t io n $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

S o u r ce o f F u n d s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta l s<br />

O th e r C ity F u n d s $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

145


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />

Project: Backhoe<br />

Description and Purpose:<br />

These funds would be used to replace the 2004 Case 590 Backhoe.<br />

Department:<br />

Public Utilities – Sewer Fund - Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The existing unit has reached its functional life cycle and will need to be<br />

replaced.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $ 9 0 ,0 00 $ 9 0, 00 0<br />

T o ta ls $ 9 0 ,0 00 $ 9 0, 00 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 9 0 ,0 00 $ 9 0, 00 0<br />

T o ta ls $ 9 0 ,0 00 $ 9 0, 00 0<br />

146


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : UV Disinfection Equipment<br />

Description and Purpose:<br />

Replacement <strong>of</strong> existing UV ballasts and lamps for the UV disinfection<br />

equipment.<br />

Department:<br />

Public Utilities<br />

Fund and Account:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Replacement <strong>of</strong> the high intensity lamps that are at the end their recommended<br />

life cycle for meeting the <strong>City</strong>’s NPDES permit requirements.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

O th e r $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

147


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Tertiary Filter Building Equipment<br />

Description and Purpose: Replacement <strong>of</strong> existing filter media and pumps to<br />

continue to meet more stringent NPDES requirements.<br />

Department: Public Utilities<br />

Fund and Account: Wastewater Construction Fund (Fund 541)<br />

Justification: Existing filter media will be at the end <strong>of</strong> its recommended life<br />

cycle and will have to be replaced to ensure the <strong>City</strong> will be able to meet its<br />

NPDES requirements.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 4 5 0 ,0 0 0 $ 4 5 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

148


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Sludge Transport Truck<br />

Description and Purpose:<br />

Purchase <strong>of</strong> a new quad axle roll-<strong>of</strong>f hoist truck to transport WWTP sludge from<br />

plant to the landfill.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Replace the existing 1995 sludge truck that currently has 515,000 miles.<br />

Existing truck has been prone to costly repairs and we have to use a private<br />

hauler when the truck is down for repairs.<br />

Recommended Funding:<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

O th er $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

C o nst ru ct io n En ginee ring<br />

In sp ection<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d<br />

O th er C ity Fu nd s $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed era l<br />

T ot a ls $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

149


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Facilities <strong>Plan</strong>ning Report<br />

Description and Purpose:<br />

Facilities planning document for updating the wastewater service area <strong>of</strong> the<br />

<strong>City</strong>.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Need to update the 2000 wastewater service area document.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

150


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />

Project: Wesleyan Woods Sanitary Sewer<br />

Description and Purpose:<br />

Several sources <strong>of</strong> infiltration/inflow and severe root intrusion into the sanitary<br />

sewer have been located in the Wesleyan Woods area. The project consists <strong>of</strong><br />

trenchless methods <strong>of</strong> infiltration/inflow removal and some limited spot<br />

repairs.<br />

Department:<br />

Public Utilities – Sewer Fund - Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Infiltration and inflow cause’s sanitary sewer backups into homes and<br />

increases flow to the WWTP. These flows decrease capacity <strong>of</strong> the WWTP and<br />

cause OEPA permit violations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

151


152


CAPITAL IMPROVEMENT PLAN<br />

STORM SEWER FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 253,500 408,500 473,500 243,500 253,500<br />

REVENUES:<br />

Storm Sewer Fees 515,000 525,000 540,000 550,000 570,000<br />

TOTAL REVENUE 515,000 525,000 540,000 550,000 570,000<br />

EXPENDITURES:<br />

Catch Basin Replacement 10,000 10,000 10,000 10,000 10,000<br />

Miscellaneous Repair 30,000 30,000 30,000 30,000 30,000<br />

Inflow/Infiltration Remediation 100,000 100,000 100,000 100,000 100,000<br />

N. Sandusky St. to N. Liberty St. 380,000<br />

East Winter Street (Lake St. to Wade St.) 220,000<br />

Bernard Avenue (US 23 to Liberty St.) 75,000<br />

Cherry St. Stormwater Replacement 200,000<br />

Vernon Ave. 535,000<br />

W. William St/Liberty Culvert Replacement 300,000<br />

I & I Report 0 100,000<br />

NPDES Costs 20,000 20,000 20,000 20,000<br />

TOTAL EXPENDITURES 360,000 460,000 770,000 540,000 460,000<br />

UNRESERVED FUND BALANCE 408,500 473,500 243,500 253,500 363,500<br />

PURPOSE: The Storm Sewer <strong>CIP</strong> identifies future projects and studies necessary for<br />

improving and maintaining the <strong>City</strong>'s storm sewer system. The <strong>City</strong> will begin a master plan<br />

process in 2006 to identify issues related to compliance with recently adopted storm sewer<br />

regulations.<br />

FUNDING SOURCES: Storm sewer projects are funded primarily by the previously enacted<br />

storm sewer fees. These fees are assessed to all single and two family residential units<br />

at the rate <strong>of</strong> $2.50 per month. Non-residential and apartments are assesssed a fee based on<br />

an impervious surface calaculation performed on their property.<br />

153


154 12


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Public Works Storm Water Replacement<br />

Description and Purpose:<br />

This project replaces the existing storm water system that is currently located<br />

within the closed landfill located at 241 Cherry Street. The proposed storm<br />

water system would be located and the pipe joints would be water tight.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The <strong>City</strong> received a Notice <strong>of</strong> Violation for the discharge <strong>of</strong> pollutants to “water<br />

<strong>of</strong> the state” without an NPDES permit. The pollutant is the leachate from the<br />

closed landfill that enters the storm water pipe through the pipe joints.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

T o ta ls $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

T o ta ls $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

155


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Storm Sewers from N. Sandusky to N. Liberty St.<br />

Description and Purpose:<br />

<strong>Improvement</strong>s <strong>of</strong> existing storm sewers and installations <strong>of</strong> new storm sewers<br />

and catch basins from N. Sandusky St. to N. Liberty St<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (B-1) to<br />

improve the storm water drainage from N. Sandusky St. to N. Liberty St and<br />

reduction in known I&I.<br />

Recommended Funding:<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

T ot a ls $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th e r C ity Fu nd s $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

T ot a ls $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

156


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Storm Sewers Miscellaneous Repairs<br />

Description and Purpose:<br />

Fees for miscellaneous repairs to the <strong>City</strong>’s Storm sewer system.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Costs to provide repairs to the <strong>City</strong>’s storm sewer system as needed to maintain<br />

the system.<br />

Recommended Funding:<br />

R E C O M M EN D E D F U N D I N G<br />

E st im a te d<br />

E xp e n d it u re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o tal s<br />

M is c ell an e o u s Re p airs $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

T o ta ls $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o tal s<br />

O t h e r C it y F u n d s $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

T o ta ls $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

157


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: East Winter Street Storm Sewer <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Storm sewer improvements on East Winter St. from Lake St. to Wade St<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (O-2) to<br />

improve the storm water drainage on East Winter St. from Lake St. to Wade St<br />

and reduction in known I&I.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

T ot a ls $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

T ot a ls $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

158


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : I&I Report <strong>of</strong> the Storm Sewer System<br />

Description and Purpose:<br />

Comprehensive I&I report <strong>of</strong> the <strong>City</strong>’s storm sewer system. Includes flow<br />

monitoring, smoke & dye testing and modeling to locate sources <strong>of</strong> I&I within<br />

the <strong>City</strong>.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Need to locate sources <strong>of</strong> I&I in the <strong>City</strong> to help reduce amount <strong>of</strong> storm water<br />

at the UOWRC. This report is recommended in the 2000 wastewater report.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

159


Description and Purpose:<br />

CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Catch Basin Replacement<br />

Fees for replacement <strong>of</strong> catch basins within the <strong>City</strong>’s storm water system. A<br />

catch basin (a.k.a., storm drain inlet, curb inlet) is an inlet to the storm drain<br />

system that typically includes a grate or curb inlet where stormwater enters the<br />

catch basin and a sump to capture sediment, debris and associated pollutants.<br />

Catch basins act as pretreatment for other treatment practices by capturing<br />

large sediments. The performance <strong>of</strong> catch basins at removing sediment and<br />

other pollutants depends on the design <strong>of</strong> the catch basin (e.g., the size <strong>of</strong> the<br />

sump), and routine maintenance to retain the storage available in the sump to<br />

capture sediment.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Replacement <strong>of</strong> inoperable catch basins.<br />

Recommended Funding:<br />

R E C O M M EN D E D F U N D I N G<br />

E st im a te d E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />

C at ch B as i n Re p la c e m e n t $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />

O t h e r C it y F u n d s $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

160


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Bernard Ave. Storm Sewer<br />

Description and Purpose:<br />

<strong>Improvement</strong>s to the storm sewer on Bernard Ave. from US 23 to Liberty Street<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (F-3) to<br />

improve the storm water drainage along Bernard Ave. from US 23 to Liberty<br />

Street.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x p e n d it ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th e r C ity F u nd s $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

161


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Fees for MS4 Storm Water Management <strong>Plan</strong><br />

Description and Purpose:<br />

Fees for MS4 storm water management plan as required in the OEPA storm<br />

water NPDES permit.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Provide resources for storm water NPDES permit attainment.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

162


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: West William Street/Liberty Street Culvert Replacement<br />

Description and Purpose:<br />

This project is initiated and administered by ODOT District 6 and involves the<br />

open cut replacement <strong>of</strong> the failing <strong>Delaware</strong> Run pipe arch culvert within the<br />

William Street & Liberty Street right <strong>of</strong> way.<br />

Department:<br />

Department <strong>of</strong> Engineering Services & Public Utilities Department<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Per agreement with ODOT and includes the necessary storm sewer<br />

improvement in keeping with storm sewer master plan.<br />

Recommended Funding:<br />

The city is responsible for project construction costs within the Liberty Street<br />

R/W. The current cost estimate below is provided by ODOT.<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

Stor m S ewe r Fu nd $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

163


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Vernon Avenue Storm Sewer<br />

Description and Purpose:<br />

Construction <strong>of</strong> a storm sewer from Vernon Ave. southwest along Conrail RR to<br />

Branch St. west under Conrail RR underneath Lake St. to the Olentangy River<br />

and the installation <strong>of</strong> a 36” storm sewer pipe from Vernon Ave. to Branch St.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (L-1) to<br />

improve the storm water drainage from Vernon Ave. southwest along Conrail<br />

RR to Branch St. west under Conrail RR underneath Lake St. to the Olentangy<br />

River and the installation <strong>of</strong> a 36” storm sewer pipe from Vernon Ave. to<br />

Branch St.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

T ot a ls $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

T ot a ls $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

164


CAPITAL IMPROVEMENT PLAN<br />

REFUSE FUND<br />

2009 - 2013<br />

REVENUES:<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

Refuse Fees 457,476 428,876 470,276 466,276 466,276<br />

TOTAL REVENUE 457,476 428,876 470,276 466,276 0<br />

EXPENDITURES:<br />

Debt Service<br />

Curve Rd. Leachate Collection ($475,000 10rs.) 61,238 59,438 57,638 58,638 58,638<br />

Equipment<br />

Rear Load 20-Yard Packer - Commercial 140,000 150,000<br />

8 Yard Dump 113,000<br />

Side Load 20-Yard Packer - Residential 165,000 165,000 170,000<br />

Recycling Vehicle - Recycling 170,000 170,000 350,000<br />

Bulk Pickup Vehicle<br />

Pickup Truck 32,000<br />

Skid Steer 45,000<br />

Landfill<br />

Leachate Collection System-Curve Road 61,238 59,438 57,638 57,638 57,638<br />

TOTAL EXPENDITURES 457,476 428,876 470,276 466,276 436,276<br />