Section 5 - Start Up For Models: JGH:E:K:T START-UP CHECK LIST - INSTRUMENTATION Description Date Checked Date Verified 1. Check and verify the set point for the high compressor oil Commissioning Agent: temperature shutdown at 190°F (88°C) maximum. __________________ 2. Check and verify proper vibration shutdown installation and operation. Record alarm and shut down settings. ________________________________________ ________________________________________ ________________________________________ ________________________________________ 3. Verify operation of suction pressure, inter-stage pressure, and discharge pressure shutdowns. Record alarm and shutdown settings. ________________________________________ ________________________________________ ________________________________________ ________________________________________ 4. Verify gas discharge temperature shutdowns operation. Record alarm and shutdown settings. ________________________________________ ________________________________________ ________________________________________ ________________________________________ 5. Check, verify, and record the over speed setting. _____________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ START-UP CHECK LIST - FORCE FEED LUBRICATION SYSTEM Description Date Checked Date Verified 1. Check and verify force feed lubricator box for proper oil Commissioning Agent: level. __________________ 2. Prime the force feed lubrication system through the purge port at the force feed pump discharge manifold. Check and verify each tube connection for tightness 3. Check and verify operation of force feed lubrication system no flow shutdowns. 4. Record color of force feed blow out discs (see Customer Technical Bulletin CTB-137 for disc ratings). ________________ 5. Check, verify, and record recommended lube feed rates from lubricator data plate or “Parts Book” Cylinder Lubrication sheet. ____________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ PAGE 5-6 3/11
For Models: JGH:E:K:T Section 5 - Start Up FINAL PRE-START CHECK LIST Description Date Checked Date Verified 1. Operate pre-lube system. Record pre-lube pressure. ______________________ 2. For engine driven units, disable the ignition and roll the engine with the starter to check and verify the compressor rolls freely. Check and verify oil pressure increases noticeably while rolling on the starter. Commissioning Agent: __________________ 3. For electric motors, bar the compressor over manually to check and verify it rolls freely. 4. For machines compressing a combustible gas, purge the entire system including the piping, by-pass, recycle line, and compressor cylinders of all air. 5. Review start-up instructions for all other package components. 6. Complete the required review of the Start-Up and Operating Instructions for the unit with the unit operator. Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ INITIAL POST START-UP CHECK LIST Description Date Checked Date Verified 1. Check and verify immediate oil pressure increase. Enable oil pressure shutdown and bearing temperature shutdowns. Record initial pressure at operating speed. ______________________ 2. Check and verify oil filter pressure gauges. Record initial differential. ___________________ 3. Check and verify the low oil pressure shutdown is active and set at 45 psig (3.1 bar g ). 4. Check and verify lube oil pressure set at 50 to 60 psig (3.5 to 4.2 bar g ) at operating speed and temperature (see Technical Manual, Section 4). Record final setting. ______________________ 5. Record oil filter maximum differential reference value listed on the compressor top cover filter data plate. ___________________ 6. Listen and feel for any strange noises or vibration in the compressor or piping. Record any occurrences. ________________________________________ ________________________________________ ________________________________________ ________________________________________ 7. Check and verify high discharge gas temperature shutdowns are set about 10% above normal operating temperature (350 °F (177 °C) maximum) and functioning. Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ 3/11 PAGE 5-7
- Page 56 and 57: Section 3 - Maintenance For Models:
- Page 58 and 59: Section 4 Part Replacement For Mode
- Page 60 and 61: Section 4 Part Replacement For Mode
- Page 62 and 63: Section 4 Part Replacement For Mode
- Page 64 and 65: Section 4 Part Replacement For Mode
- Page 66 and 67: Section 4 Part Replacement For Mode
- Page 68 and 69: Section 4 Part Replacement For Mode
- Page 70 and 71: Section 4 Part Replacement For Mode
- Page 72 and 73: Section 4 Part Replacement For Mode
- Page 74 and 75: Section 4 Part Replacement For Mode
- Page 76 and 77: Section 4 Part Replacement For Mode
- Page 78 and 79: Section 4 Part Replacement For Mode
- Page 80 and 81: Section 4 Part Replacement For Mode
- Page 82 and 83: Section 4 Part Replacement For Mode
- Page 84 and 85: Section 4 Part Replacement For Mode
- Page 86 and 87: Section 4 Part Replacement For Mode
- Page 88 and 89: Section 4 Part Replacement For Mode
- Page 90 and 91: Section 4 Part Replacement For Mode
- Page 92 and 93: Section 4 Part Replacement For Mode
- Page 94 and 95: Section 4 Part Replacement For Mode
- Page 96 and 97: Section 4 Part Replacement For Mode
- Page 98 and 99: Section 4 Part Replacement For Mode
- Page 100 and 101: Section 4 Part Replacement For Mode
- Page 102 and 103: Section 5 - Start Up For Models: JG
- Page 104 and 105: Section 5 - Start Up For Models: JG
- Page 108 and 109: Section 5 - Start Up For Models: JG
- Page 110 and 111: Section 5 - Start Up For Models: JG
- Page 112 and 113: Section 6 - Troubleshooting For Mod
- Page 114 and 115: Section 6 - Troubleshooting For Mod
- Page 116 and 117: Appendix A Ariel Fasteners and Torq
- Page 118 and 119: Appendix A Ariel Fasteners and Torq
- Page 120 and 121: Appendix A Ariel Fasteners and Torq
- Page 122 and 123: Appendix B - Clearances For Models:
- Page 124 and 125: Appendix B - Clearances For Models:
- Page 126 and 127: Appendix B - Clearances For Models:
- Page 128 and 129: Appendix C - Frame Specifications F
- Page 130 and 131: Appendix C - Frame Specifications F
- Page 132: Appendix D Compressor Clearance, Oi
For Models: JGH:E:K:T Section 5 - Start Up<br />
FINAL PRE-START CHECK LIST<br />
Description Date Checked Date Verified<br />
1. Operate pre-lube system. Record pre-lube pressure.<br />
______________________<br />
2. For engine driven units, disable the ignition and roll the<br />
engine with the starter to check and verify the compressor<br />
rolls freely. Check and verify oil pressure increases noticeably<br />
while rolling on the starter.<br />
Commissioning Agent:<br />
__________________<br />
3. For electric motors, bar the compressor over manually to<br />
check and verify it rolls freely.<br />
4. For machines compressing a combustible gas, purge the<br />
entire system including the piping, by-pass, recycle line,<br />
and compressor cylinders of all air.<br />
5. Review start-up instructions for all other package components.<br />
6. Complete the required review of the Start-Up and Operating<br />
Instructions for the unit with the unit operator.<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
INITIAL POST START-UP CHECK LIST<br />
Description Date Checked Date Verified<br />
1. Check and verify immediate oil pressure increase. Enable<br />
oil pressure shutdown and bearing temperature shutdowns.<br />
Record initial pressure at operating speed.<br />
______________________<br />
2. Check and verify oil filter pressure gauges. Record initial<br />
differential.<br />
___________________<br />
3. Check and verify the low oil pressure shutdown is active<br />
and set at 45 psig (3.1 bar g ).<br />
4. Check and verify lube oil pressure set at 50 to 60 psig (3.5<br />
to 4.2 bar g ) at operating speed and temperature (see Technical<br />
Manual, Section 4). Record final setting.<br />
______________________<br />
5. Record oil filter maximum differential reference value listed<br />
on the compressor top cover filter data plate.<br />
___________________<br />
6. Listen and feel for any strange noises or vibration in the<br />
compressor or piping. Record any occurrences.<br />
________________________________________<br />
________________________________________<br />
________________________________________<br />
________________________________________<br />
7. Check and verify high discharge gas temperature shutdowns<br />
are set about 10% above normal operating temperature<br />
(350 °F (177 °C) maximum) and functioning.<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
3/11 PAGE 5-7