Heavy Duty Balanced Opposed Compressors - Ariel Corporation

Heavy Duty Balanced Opposed Compressors - Ariel Corporation Heavy Duty Balanced Opposed Compressors - Ariel Corporation

es.arielcorp.com
from es.arielcorp.com More from this publisher
15.11.2012 Views

Section 4 Part Replacement For Models: JGH:E:K:T Before piston rod installation, wipe it with denatured alcohol. Be careful not to leave fingerprints on the rod before it contacts the packing rings. Wipe the rod with denatured alcohol after installation. Clean the head end head or unloader components with denatured alcohol. Use minimal amounts of oil for the bolt-holes to ensure oil does not run into the cylinder. Also install the head end steel gasket without Never-Seez. Disassemble and clean the valves with denatured alcohol, then re-assemble, wipe them again, and install. Clean retainers and high clearance assemblies with denatured alcohol. Use only a thin film of oil for the valve cap O-rings and bolt-holes. Assemble cleaned parts immediately to avoid contamination and corrosion. If cylinder will not commence immediate service, contact Ariel for preservation instructions to ER-34. PAGE 4-44 3/11

For Models: JGH:E:K:T Section 5 - Start Up Warranty Notification - Installation List Data and Start Up Check Lists for JG:A:M:N:P:Q:R:J:H:E:K:T:C:D Reciprocating Compressors The following forms are designed to ensure a successful start-up of smaller Ariel reciprocating compressor models. Ariel warranty coverage requires these completed forms sent to: Administrative Assistant - Sales, Ariel Corporation 35 Blackjack Road • Mount Vernon, Ohio 43050 USA Phone: 740-397-0311 • FAX: 740-397-3856 Warranty Notification - Installation List Data Date:__________________ Name: __________________________________________________ Unassigned Resale Direct Sale Lease-Purchase Rental/Lease Unit Compressor Frame Frame Model:___________________________ Frame Serial #:_________________________________ Frame Lubricant Make and Grade:___________________________________________________________ Package Startup Date:_________________________ Distributor/Fabricator Company:__________________________________ Name:_________________________________ Address:__________________________________________________________________________ City:_______________________ State:_____ Zip:_______________ Country:____________________ Fabricator Unit Number:_______________________________________ Application Air/Nitrogen CNG/GNC FPSO Gathering Fuel Gas Booster Refrigeration Pipeline PRC Injection Storage/Withdrawal Miscellaneous Elevation:_____________________________ H 2 S%:_____________ CO 2 %:_____________ Specific Gravity:_____________ Non-Lube: Yes No 3/11 PAGE 5-1

Section 4 Part Replacement For Models: JGH:E:K:T<br />

Before piston rod installation, wipe it with denatured alcohol. Be careful not to leave fingerprints on<br />

the rod before it contacts the packing rings. Wipe the rod with denatured alcohol after installation.<br />

Clean the head end head or unloader components with denatured alcohol. Use minimal amounts of<br />

oil for the bolt-holes to ensure oil does not run into the cylinder. Also install the head end steel gasket<br />

without Never-Seez.<br />

Disassemble and clean the valves with denatured alcohol, then re-assemble, wipe them again, and<br />

install. Clean retainers and high clearance assemblies with denatured alcohol. Use only a thin film of<br />

oil for the valve cap O-rings and bolt-holes.<br />

Assemble cleaned parts immediately to avoid contamination and corrosion. If cylinder will not commence<br />

immediate service, contact <strong>Ariel</strong> for preservation instructions to ER-34.<br />

PAGE 4-44 3/11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!