Progress after the last meeting T. Tsuboyama (KEK) 18 March 2009 Belle upgrade meeting
- Page 2 and 3: HPK DSSD production At end of Dece
- Page 4 and 5: Super Beast In the last meeting, I
- Page 6 and 7: Software Online: Cluster finding
- Page 8 and 9: Readout APV25 hybrid Normal and O
- Page 10 and 11: Infrastructures Monitor Radiation
- Page 12 and 13: Forward detector Talk by Iwasaki
- Page 14: Production speed 100-150 DSSD per
Progress after<br />
the last meeting <br />
T. <strong>Tsuboyama</strong> (<strong>KEK</strong>)<br />
18 March 2009<br />
Belle upgrade meeting
HPK DSSD production<br />
At end of December 2009, Prof. Aihara<br />
(Tokyo) has a discussion with HPK<br />
semiconductor division people. Aihara is<br />
organizing not only high-energy physics<br />
groups but also Jaxa, ICRR and<br />
APV25 purchase<br />
After struggles, we find a way to pay<br />
money from <strong>KEK</strong> to CERN directly. We paid<br />
9.5 M yen for 4,000 chips. Detail report<br />
from M. Friedl.
IR discussions<br />
As M. Iwasaki calculated huge heat<br />
from beam, a new IR design with<br />
quadrupole magnets closer to the IP<br />
was proposed by <strong>KEK</strong>B people. Now<br />
low-emittance option is also<br />
discussed.<br />
Engineering discussion started<br />
A <strong>KEK</strong> engineers team started a<br />
serious discussion of Belle structure<br />
design.
Super Beast<br />
In the last meeting, I proposed NOT to<br />
install DEPFET and SVD at T=0.<br />
Gary Varner reminded me that we<br />
need to consider a radiation monitor<br />
system around the IR chamber, which<br />
was called in <strong>KEK</strong>B in 1998 as Beast.<br />
Haba san’s luxury.<br />
Hara san<br />
He moved from Osaka University to <strong>KEK</strong>.<br />
His main job is to build the Super Belle<br />
computer / software system.<br />
We need his successors. Hara san will<br />
help him/her. The job list is shown later.
Task list<br />
T. <strong>Tsuboyama</strong> (<strong>KEK</strong>)<br />
18 March 2009<br />
Belle upgrade meeting
Software<br />
Online:<br />
Cluster finding and time reconstruction<br />
Calibration<br />
Performance monitor<br />
Offline<br />
Data quality monitor<br />
Quality assurance monitor<br />
Calibration / Database<br />
Alignment<br />
Tracking<br />
CDC track extrapolation<br />
Local SVD/Pixel tracking<br />
Simulations<br />
Detector optimization
DSSD production<br />
No news from HPK<br />
Test production by other companies (Talk by Bergauer)<br />
R&D in Tata institute (Talk by K. Rao)<br />
R&D in Kyunphook Univ. (Talk by Kah)<br />
Mass production<br />
Sensor characterization.<br />
Quality control
Readout<br />
APV25 hybrid<br />
Normal and Origami<br />
Production<br />
Quality control --- Test<br />
Repeater<br />
Mechanical and Electric design<br />
Mass production<br />
Backend<br />
COPPER/FINNESSE performance / alternative<br />
Mass production<br />
DAQ software<br />
Slow control
Mechanics<br />
Support<br />
Connection to CDC/IR/DEPFET<br />
Design: Cooling of normal hybrids<br />
Construction<br />
Ladder production<br />
Design<br />
DSSD test<br />
Hybrid test<br />
Assembly<br />
Storage<br />
Booking<br />
Ladder test
Infrastructures<br />
Monitor<br />
Radiation and Beam abort<br />
Temperature<br />
Cooling<br />
Chiller/coolant<br />
tubing<br />
Special consideration of Origami cooling tubes<br />
Cables<br />
Power supply / signal / control /<br />
Power supply<br />
Design, construction (purchase)<br />
Place<br />
Readout<br />
Crates
System integration<br />
Definition of Integration strategy.<br />
Ladder mount<br />
Test with source /laser (?)<br />
Debugging hardware and software<br />
Calibration<br />
Cosmic ray test
Forward detector<br />
Talk by Iwasaki<br />
Purpose<br />
Improve physics performance<br />
Beam size measurement<br />
Design should be done in parallel to the SVD design.<br />
How about just extend the acceptance of the SVD.
Production schedule<br />
Thomas’s chart (modified)in a previous meeting.<br />
system test<br />
3 years for sensor production with some spares.<br />
Final ladder production will be done in 2013.<br />
0.5-1 year system test before installation.<br />
SVD and DEPFET installation should be done after we<br />
understand background conditions, e.g., 0.5 years.
Production speed <br />
100-150 DSSD per year * 3 years.<br />
24 ladders per year * 3 years.<br />
72 ladders installation in the last year.<br />
DSSD production hopefully starts at end of 2009.