Non-mining MSGP 2010 General Permit 4.1.3 Exceptions to Routine Facility Inspections Inactive and Unstaffed Sites: The requirement to conduct routine facility inspections on a quarterly basis does not apply to a facility that is inactive and unstaffed, provided that no industrial materials or activities are exposed to stormwater. Such a facility is only required to conduct an annual comprehensive facility inspection in accordance with the requirements of Part 4.3. To invoke this exception, the permittee shall do the following: Maintain a statement in the SWPPP pursuant to Part 5.1.5.2 indicating that the facility is inactive and unstaffed, and that there are no industrial materials or activities exposed to precipitation, in accordance with the substantive requirements in 40 CFR 122.26(g)(4)(iii). The statement must be signed and certified in accordance with Appendix B, Subsection 9. If circumstances change and industrial materials or activities become exposed to stormwater or the facility becomes active and/or staffed, this exception no longer applies and the permittee shall immediately resume quarterly inspections. If, during the period of coverage under this permit, the facility becomes qualified for the inactive and unstaffed exception, and there are no industrial materials or activities exposed to stormwater, then the permittee shall include the same signed and certified statement as above and retain it pursuant to Part 5.4. For permittees with inactive and unstaffed facilities that are unable to meet the “no industrial materials or activities exposed to stormwater” standard, the frequency of inspections is reduced to one routine inspection and one CFI each calendar year. These two inspections shall be conducted in the opposing wet seasons and at least three months apart. The SWPPP shall include documentation that the facility is unable to meet this standard and the results of the inspections. Compliance with any additional sector-specific conditions in Part 8 is still required. 4.2 Visual Assessment of Stormwater Discharges The permittee shall perform two visual assessments during the summer wet season and two visual assessments during the winter wet season when the facility is discharging. Wet seasons, for the purposes of visual assessments, are defined as follows: Summer wet season: June 1 – October 31 Winter wet season: November 1 – May 31 The term ‘wet season’ applies statewide and includes areas of the state where freezing conditions exist that prevent runoff from occurring for extended periods. In areas where freezing conditions exist, the four visual assessments may be distributed during seasons when precipitation runoff occurs. Visual assessment monitoring requirements in this permit begin immediately after authorization to discharge is received by the permittee unless authorization is received 90 calendar days or more after a wet season has begun, in which case visual assessment monitoring shall commence with the start of the next wet season. 4.2.1 Visual Assessment Procedures Visual assessment samples are not required to be collected consistent with 40 CFR Part 136 procedures. The visual assessment shall be made: Of a sample in a clean, clear glass, or plastic container, and examined in a well-lit area; On samples collected within the first 30 minutes of an actual discharge from a storm event. If it is not possible to collect the sample within the first 30 minutes of discharge, the sample must be collected as soon as practicable after the first 30 minutes and the permittee shall document why it was not possible to take samples within the first 30 minutes. In the case of Stormwater Discharges Associated with Industrial Activity 15
Non-mining MSGP 2010 General Permit snowmelt, samples shall be taken during a period with a measurable discharge from the facility (see also Part 6.1.2.3); and On discharges that occur at least 72 hours (3 calendar days) from a previous discharge (see also Part 6.1.2.2). The permittee shall visually inspect the sample for the following water quality characteristics: Color; Odor; Clarity; Floating solids; Settled solids; Suspended solids; Foam; Oil sheen; and Other obvious indicators of stormwater pollution. 4.2.2 Visual Assessment Documentation The permittee shall document the results of the visual assessments and maintain this documentation with the SWPPP as required in Part 5.4. The visual assessment findings need not be submitted to ADEQ, unless specifically requested by the Department. At a minimum, the documentation of the visual assessment shall include: Sample location(s); Sample collection date and time, and visual assessment date and time for each sample; Personnel collecting the sample and performing visual assessment, and their signatures; Nature of the discharge (i.e., runoff or snowmelt); Results of observations of the stormwater discharge; Probable sources of any observed stormwater contamination; and If applicable, why it was not possible to take samples within the first 30 minutes. 4.2.3 Exceptions to Visual Assessments Absence of Discharge: If no storm event results in a discharge from the facility or outfall(s) during a wet season, the permittee is excused from visual assessment for the facility or outfall(s) for that season provided the permittee documents in the monitoring records and retains with the SWPPP why a sample could not be collected. Adverse Conditions: Adverse conditions are those that are dangerous or create inaccessibility for personnel, such as local flooding, high winds, or electrical storms, or situations that otherwise make sampling unsafe. When adverse conditions prevent the collection of either visual assessment sample in a given wet season, the permittee shall document those conditions with the SWPPP and resume visual assessment monitoring in the subsequent wet season. Inactive and unstaffed sites: The requirement for a routine visual assessment does not apply at a facility that is inactive and unstaffed, provided that no industrial materials or activities are exposed to stormwater. To invoke this exception, the permittee shall do the following: Maintain a statement in the SWPPP as required in Part 5.1.5.2 indicating that the facility is inactive and unstaffed, and that there are no industrial materials or activities exposed to precipitation, in accordance with the substantive requirements in 40 CFR 122.26(g)(4)(iii). The statement must be signed and certified in accordance with Appendix B, Subsection 9. Stormwater Discharges Associated with Industrial Activity 16
- Page 33 and 34: The annual training consists of a M
- Page 35 and 36: more than 14 days is required to ad
- Page 37 and 38: In some instances, follow up inspec
- Page 39 and 40: Section 7 - Reporting and Recordkee
- Page 41 and 42: Section 8 - Signature Requirements
- Page 43 and 44: Section 9 - SWPPP Modifications As
- Page 45 and 46: Section 10 - SWPPP Availability As
- Page 47: Tables
- Page 50 and 51: Table 2.1 Pollution Prevention Team
- Page 52 and 53: Table 2.1 Pollution Prevention Team
- Page 54 and 55: Table 2.1 Pollution Prevention Team
- Page 57 and 58: Table 4.1 Tenant's Industrial Activ
- Page 59 and 60: Table 4.1 Tenant's Industrial Activ
- Page 61 and 62: Table 4.1 Tenant's Industrial Activ
- Page 63: Figures Figures are not included wi
- Page 68 and 69: AZPDES MULTI-SECTOR GENERAL PERMIT
- Page 70 and 71: Non-mining MSGP 2010 General Permit
- Page 72 and 73: Non-mining MSGP 2010 General Permit
- Page 74 and 75: Non-mining MSGP 2010 General Permit
- Page 76 and 77: Non-mining MSGP 2010 General Permit
- Page 78 and 79: Non-mining MSGP 2010 General Permit
- Page 80 and 81: Non-mining MSGP 2010 General Permit
- Page 82 and 83: Non-mining MSGP 2010 General Permit
- Page 86 and 87: Non-mining MSGP 2010 General Permit
- Page 88 and 89: Non-mining MSGP 2010 General Permit
- Page 90 and 91: Non-mining MSGP 2010 General Permit
- Page 92 and 93: Non-mining MSGP 2010 General Permit
- Page 94 and 95: Non-mining MSGP 2010 General Permit
- Page 96 and 97: Non-mining MSGP 2010 General Permit
- Page 98 and 99: Non-mining MSGP 2010 General Permit
- Page 100 and 101: Non-mining MSGP 2010 General Permit
- Page 102 and 103: Non-mining MSGP 2010 General Permit
- Page 104 and 105: Non-mining MSGP 2010 General Permit
- Page 106 and 107: Non-mining MSGP 2010 General Permit
- Page 108 and 109: Non-mining MSGP 2010 General Permit
- Page 110 and 111: Non-mining MSGP 2010 General Permit
- Page 112 and 113: Non-mining MSGP 2010 General Permit
- Page 114 and 115: Non-mining MSGP 2010 General Permit
- Page 116 and 117: Non-mining MSGP 2010 General Permit
- Page 118 and 119: Non-mining MSGP 2010 General Permit
- Page 120 and 121: Non-mining MSGP 2010 General Permit
- Page 122 and 123: Part 8 - Sector-Specific Requiremen
- Page 124 and 125: Non-mining MSGP 2010 General Permit
- Page 126 and 127: Part 8 - Sector-Specific Requiremen
- Page 128 and 129: Part 8 - Sector-Specific Requiremen
- Page 130 and 131: Non-mining MSGP 2010 General Permit
- Page 132 and 133: Non-mining MSGP 2010 General Permit
Non-mining MSGP 2010 General Permit<br />
4.1.3 Exceptions to Routine Facility Inspections<br />
Inactive and Unstaffed Sites: The requirement to conduct routine facility inspections on a<br />
quarterly basis does not apply to a facility that is inactive and unstaffed, provided that no<br />
industrial materials or activities are exposed to stormwater. Such a facility is only required to<br />
conduct an annual comprehensive facility inspection in accordance with the requirements of Part<br />
4.3. To invoke this exception, the permittee shall do the following:<br />
<br />
<br />
<br />
Maintain a statement in the SWPPP pursuant to Part 5.1.5.2 indicating that the facility is<br />
inactive and unstaffed, and that there are no industrial materials or activities exposed to<br />
precipitation, in accordance with the substantive requirements in 40 CFR 122.26(g)(4)(iii).<br />
The statement must be signed and certified in accordance with Appendix B, Subsection<br />
9.<br />
If circumstances change and industrial materials or activities become exposed to<br />
stormwater or the facility becomes active and/or staffed, this exception no longer applies<br />
and the permittee shall immediately resume quarterly inspections.<br />
If, during the period of coverage under this permit, the facility becomes qualified for the<br />
inactive and unstaffed exception, and there are no industrial materials or activities<br />
exposed to stormwater, then the permittee shall include the same signed and certified<br />
statement as above and retain it pursuant to Part 5.4.<br />
For permittees with inactive and unstaffed facilities that are unable to meet the “no industrial<br />
materials or activities exposed to stormwater” standard, the frequency of inspections is reduced<br />
to one routine inspection and one CFI each calendar year. These two inspections shall be<br />
conducted in the opposing wet seasons and at least three months apart. The SWPPP shall<br />
include documentation that the facility is unable to meet this standard and the results of the<br />
inspections. Compliance with any additional sector-specific conditions in Part 8 is still required.<br />
4.2 Visual Assessment of <strong>Stormwater</strong> Discharges<br />
The permittee shall perform two visual assessments during the summer wet season and two<br />
visual assessments during the winter wet season when the facility is discharging.<br />
Wet seasons, for the purposes of visual assessments, are defined as follows:<br />
Summer wet season: June 1 – October 31<br />
Winter wet season: November 1 – May 31<br />
The term ‘wet season’ applies statewide and includes areas of the state where freezing<br />
conditions exist that prevent runoff from occurring for extended periods. In areas where freezing<br />
conditions exist, the four visual assessments may be distributed during seasons when<br />
precipitation runoff occurs.<br />
Visual assessment monitoring requirements in this permit begin immediately after authorization to<br />
discharge is received by the permittee unless authorization is received 90 calendar days or more<br />
after a wet season has begun, in which case visual assessment monitoring shall commence with<br />
the start of the next wet season.<br />
4.2.1 Visual Assessment Procedures<br />
Visual assessment samples are not required to be collected consistent with 40 CFR Part 136<br />
procedures.<br />
The visual assessment shall be made:<br />
<br />
<br />
Of a sample in a clean, clear glass, or plastic container, and examined in a well-lit area;<br />
On samples collected within the first 30 minutes of an actual discharge from a storm event. If<br />
it is not possible to collect the sample within the first 30 minutes of discharge, the sample<br />
must be collected as soon as practicable after the first 30 minutes and the permittee shall<br />
document why it was not possible to take samples within the first 30 minutes. In the case of<br />
<strong>Stormwater</strong> Discharges Associated with Industrial Activity 15