Non-mining MSGP 2010 General Permit Arizona Water (see Part 1.1.4.6) is required to submit a copy of the SWPPP, to the Department for review, along with the NOI in subsection (e); e. Submit to the Department a complete and accurate Notice of Intent (NOI) Form (either an original, or a photocopy/reproduction) in accordance with A.A.C. R18-9-C901(D) to the address listed in Part 7.6. Other NOI options (i.e., electronic submission) may also be used if ADEQ makes the information available on the Internet or by public notice. If the facility has the potential to discharge to a regulated municipal separate storm sewer system (MS4), the applicant must provide: o The name of the MS4 operator in Section E of the NOI; and o Name of closest surface water receiving the discharge. The NOI form is available at http://www.azdeq.gov/environ/water/permits/stormwater.html 2. Authorization to Discharge a. Routine Authorizations Unless otherwise notified, the applicant is authorized to discharge stormwater from an eligible facility upon either: receipt of the Authorization to Discharge; or 7 calendar days after a complete and accurate NOI is received by the Department, whichever is earlier. However, in order to rely on this 7 calendar day provision, the operator must submit the NOI in a manner that documents the date of ADEQ’s receipt (i.e., certified mail, hand delivery, fax, etc.). b. Authorizations to Discharge for New Dischargers to Impaired Waters and New or Expanded Discharges to Tributaries of OAWs Unless otherwise notified, an applicant subject to Part 1.1.4.5 or 1.1.4.6 is authorized to discharge stormwater from an eligible facility upon receipt of the Authorization to Discharge or 32 business days after a complete and accurate NOI is received by the Department, whichever is earlier. c. NOIs Requiring Additional Evaluation. ADEQ may inform an applicant that authorization to discharge will not occur for up to 32 business days in the event that screening of the NOI provides information requiring further evaluation. ADEQ’s notification may be made either in writing, electronically, by fax or phone. The notification typically will be made within 7 calendar days after receipt of the NOI. Applicants who receive notice of a delay in coverage may discharge 32 business days after the date the NOI is received unless further notice is received from ADEQ during this timeframe. Such notice may confirm authorization to discharge, or request additional information to comply with the requirements of this permit. d. Requirement to Obtain Alternate Coverage. ADEQ may require the operator to submit an application for an individual AZPDES permit, as detailed in Part 1.6.1. In these instances, ADEQ will notify the operator in writing of: 1) the delay; or 2) the request for submission of an individual AZPDES permit application. e. Discharges to a regulated MS4. Permittees with discharges to a regulated MS4 shall submit to the MS4 operator a copy of the Department’s Authorization to Discharge. 3. Incomplete NOI Submitted. If ADEQ notifies the applicant that an NOI is incomplete or incorrect, the applicant must resubmit an amended NOI if the applicant still intends to obtain (or retain) coverage under this permit. 4. The time frames for discharge authorization are presented in Table 1-2, below. Stormwater Discharges Associated with Industrial Activity 5
Non-mining MSGP 2010 General Permit Table 1-2. NOI Submittal Deadlines Category NOI Submission Deadline Discharge Authorization Status Existing Dischargers – authorized for coverage under MSGP 2000. Other Eligible Dischargers – in operation prior to the effective date of this permit, but did not obtain coverage under the MSGP 2000 or another AZPDES permit. New Dischargers – will commence discharging after the effective date of this permit Change of ownership and/ or operation to a new owner/operator of an existing facility (discharger) whose discharge is authorized under this permit. The operator shall revise SWPPP documents to conform with this permit and apply for coverage no later than May 31, 2011. The operator shall develop SWPPP documents to conform with this permit and apply for coverage no later than May 31, 2011. As soon as possible, and at least 32 business days before discharge is anticipated. Permitted owner/operator shall submit a NOT to ADEQ within 30 calendar days after the new owner/operator assumes responsibility for the facility. New owner/ operator shall submit a NOI to ADEQ 7 calendar days before taking over operational control or initiating activities at the facility. Coverage under the MSGP 2000 is administratively continued until ADEQ: Grants the applicant coverage under this permit (in accordance with Part 1.3.1(2)); or Issues or denies an alternative permit in accordance with Part 1.6.1. Coverage will begin upon ADEQ issuance of an Authorization to Discharge (in accordance with Part 1.3.1(2)). Coverage begins upon ADEQ’s issuance of an Authorization to Discharge (in accordance with Part 1.3.1(2)). New owner/ operator obtains coverage. 1.3.2 Continuation of this Permit If this permit is not reissued or replaced prior to the expiration date, it will be administratively continued in accordance with A.A.C. R18-9-C903(A) and remain in force and effect. If the operator is authorized to discharge under this permit prior to the expiration date, any discharges authorized under this permit will automatically remain covered by this permit until the earliest of: 1. The operator submits a timely, complete, and accurate NOI requesting authorization to discharge under a renewal or revision of this permit and ADEQ issues an Authorization to Discharge; or 2. The operator submits a Notice of Termination; or 3. ADEQ denies coverage under this general permit or denies or issues coverage under an individual permit or other alternative permit for the facility’s discharges; or 4. A formal permit decision is made by ADEQ not to reissue this general permit, at which time ADEQ will identify a reasonable time period for covered dischargers to seek coverage under Stormwater Discharges Associated with Industrial Activity 6
- Page 23 and 24: Activities Pollutants AVE Maintenan
- Page 25 and 26: 8. Uncontaminated groundwater or sp
- Page 27 and 28: Section 5 - Description of Control
- Page 29 and 30: A current listing of construction p
- Page 31 and 32: Section 6 - Schedules and Procedure
- Page 33 and 34: The annual training consists of a M
- Page 35 and 36: more than 14 days is required to ad
- Page 37 and 38: In some instances, follow up inspec
- Page 39 and 40: Section 7 - Reporting and Recordkee
- Page 41 and 42: Section 8 - Signature Requirements
- Page 43 and 44: Section 9 - SWPPP Modifications As
- Page 45 and 46: Section 10 - SWPPP Availability As
- Page 47: Tables
- Page 50 and 51: Table 2.1 Pollution Prevention Team
- Page 52 and 53: Table 2.1 Pollution Prevention Team
- Page 54 and 55: Table 2.1 Pollution Prevention Team
- Page 57 and 58: Table 4.1 Tenant's Industrial Activ
- Page 59 and 60: Table 4.1 Tenant's Industrial Activ
- Page 61 and 62: Table 4.1 Tenant's Industrial Activ
- Page 63: Figures Figures are not included wi
- Page 68 and 69: AZPDES MULTI-SECTOR GENERAL PERMIT
- Page 70 and 71: Non-mining MSGP 2010 General Permit
- Page 72 and 73: Non-mining MSGP 2010 General Permit
- Page 76 and 77: Non-mining MSGP 2010 General Permit
- Page 78 and 79: Non-mining MSGP 2010 General Permit
- Page 80 and 81: Non-mining MSGP 2010 General Permit
- Page 82 and 83: Non-mining MSGP 2010 General Permit
- Page 84 and 85: Non-mining MSGP 2010 General Permit
- Page 86 and 87: Non-mining MSGP 2010 General Permit
- Page 88 and 89: Non-mining MSGP 2010 General Permit
- Page 90 and 91: Non-mining MSGP 2010 General Permit
- Page 92 and 93: Non-mining MSGP 2010 General Permit
- Page 94 and 95: Non-mining MSGP 2010 General Permit
- Page 96 and 97: Non-mining MSGP 2010 General Permit
- Page 98 and 99: Non-mining MSGP 2010 General Permit
- Page 100 and 101: Non-mining MSGP 2010 General Permit
- Page 102 and 103: Non-mining MSGP 2010 General Permit
- Page 104 and 105: Non-mining MSGP 2010 General Permit
- Page 106 and 107: Non-mining MSGP 2010 General Permit
- Page 108 and 109: Non-mining MSGP 2010 General Permit
- Page 110 and 111: Non-mining MSGP 2010 General Permit
- Page 112 and 113: Non-mining MSGP 2010 General Permit
- Page 114 and 115: Non-mining MSGP 2010 General Permit
- Page 116 and 117: Non-mining MSGP 2010 General Permit
- Page 118 and 119: Non-mining MSGP 2010 General Permit
- Page 120 and 121: Non-mining MSGP 2010 General Permit
- Page 122 and 123: Part 8 - Sector-Specific Requiremen
Non-mining MSGP 2010 General Permit<br />
Table 1-2. NOI Submittal Deadlines<br />
Category NOI Submission Deadline Discharge Authorization Status<br />
Existing Dischargers –<br />
authorized for coverage under<br />
MSGP 2000.<br />
Other Eligible Dischargers –<br />
in operation prior to the effective<br />
date of this permit, but did not<br />
obtain coverage under the<br />
MSGP 2000 or another<br />
AZPDES permit.<br />
New Dischargers – will<br />
commence discharging after the<br />
effective date of this permit<br />
Change of ownership and/ or<br />
operation to a new<br />
owner/operator of an existing<br />
facility (discharger) whose<br />
discharge is authorized under<br />
this permit.<br />
The operator shall revise<br />
SWPPP documents to<br />
conform with this permit and<br />
apply for coverage no later<br />
than May 31, 2011.<br />
The operator shall develop<br />
SWPPP documents to<br />
conform with this permit and<br />
apply for coverage no later<br />
than May 31, 2011.<br />
As soon as possible, and at<br />
least 32 business days before<br />
discharge is anticipated.<br />
Permitted owner/operator<br />
shall submit a NOT to ADEQ<br />
within 30 calendar days after<br />
the new owner/operator<br />
assumes responsibility for the<br />
facility.<br />
New owner/ operator shall<br />
submit a NOI to ADEQ 7<br />
calendar days before taking<br />
over operational control or<br />
initiating activities at the<br />
facility.<br />
Coverage under the MSGP 2000 is<br />
administratively continued until<br />
ADEQ:<br />
Grants the applicant coverage<br />
under this permit (in accordance<br />
with Part 1.3.1(2)); or<br />
Issues or denies an alternative<br />
permit in accordance with Part<br />
1.6.1.<br />
Coverage will begin upon ADEQ<br />
issuance of an Authorization to<br />
Discharge (in accordance with Part<br />
1.3.1(2)).<br />
Coverage begins upon ADEQ’s<br />
issuance of an Authorization to<br />
Discharge (in accordance with Part<br />
1.3.1(2)).<br />
New owner/ operator obtains<br />
coverage.<br />
1.3.2 Continuation of this Permit<br />
If this permit is not reissued or replaced prior to the expiration date, it will be administratively<br />
continued in accordance with A.A.C. R18-9-C903(A) and remain in force and effect. If the operator is<br />
authorized to discharge under this permit prior to the expiration date, any discharges authorized under<br />
this permit will automatically remain covered by this permit until the earliest of:<br />
1. The operator submits a timely, complete, and accurate NOI requesting authorization to<br />
discharge under a renewal or revision of this permit and ADEQ issues an Authorization to<br />
Discharge; or<br />
2. The operator submits a Notice of Termination; or<br />
3. ADEQ denies coverage under this general permit or denies or issues coverage under an<br />
individual permit or other alternative permit for the facility’s discharges; or<br />
4. A formal permit decision is made by ADEQ not to reissue this general permit, at which time<br />
ADEQ will identify a reasonable time period for covered dischargers to seek coverage under<br />
<strong>Stormwater</strong> Discharges Associated with Industrial Activity 6