Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...
Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ... Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...
Table 4.1 Tenant's Industrial Activities for 2013 Phoenix Sky Harbor International Airport (PHX) Tenant AVE Maintenance AVE Cleaning AVE Storage Material Storage Area Airport Fuel System and Fuel Area Building & Grounds Maintenance OWS, Lavatory & Potable Water Service Aircraft Deicing Oxford Airport Technical Services Pacific Connection Pacific Simon A Papa Sierra Payless Rent-A-Car Piedmont Airlines Ramp Readyjet Salt River Project ServisAir Sixt Rent a Car Sky Harbor Airfield Maintenance Sky Harbor Building Maintenance Sky Harbor Fleet Maintenance Sky Harbor Landside Maintenance Sky Harbor Mechanical Maintenance C Sky Harbor Park Maintenance SkyWest Airlines Southwest Airlines April 2014 Page 4 of 6
Table 4.1 Tenant's Industrial Activities for 2013 Phoenix Sky Harbor International Airport (PHX) Tenant AVE Maintenance AVE Cleaning AVE Storage Material Storage Area Airport Fuel System and Fuel Area Building & Grounds Maintenance OWS, Lavatory & Potable Water Service Aircraft Deicing Spirit D SSP America C Sun Country Swift Aviation Services, Inc. Swissport Fueling Thrifty Rent-A-Car TIMCO Time for Sale (PHX) A Tube Specialties, Inc. D U.S. Airways United Airlines United Parcel Service, Plant Engineering Veolia Transportation Volaris D April 2014 Page 5 of 6
- Page 9 and 10: conducting activities with the pote
- Page 11 and 12: Section 2 - Pollution Prevention Te
- Page 13 and 14: Section 3 - Site Description This s
- Page 15 and 16: Figure 3 depicts the storm drain sy
- Page 17 and 18: Section 4 - Summary of Potential Po
- Page 19 and 20: permission from COPAD to conduct th
- Page 21 and 22: of stormwater pollution for the sto
- Page 23 and 24: Activities Pollutants AVE Maintenan
- Page 25 and 26: 8. Uncontaminated groundwater or sp
- Page 27 and 28: Section 5 - Description of Control
- Page 29 and 30: A current listing of construction p
- Page 31 and 32: Section 6 - Schedules and Procedure
- Page 33 and 34: The annual training consists of a M
- Page 35 and 36: more than 14 days is required to ad
- Page 37 and 38: In some instances, follow up inspec
- Page 39 and 40: Section 7 - Reporting and Recordkee
- Page 41 and 42: Section 8 - Signature Requirements
- Page 43 and 44: Section 9 - SWPPP Modifications As
- Page 45 and 46: Section 10 - SWPPP Availability As
- Page 47: Tables
- Page 50 and 51: Table 2.1 Pollution Prevention Team
- Page 52 and 53: Table 2.1 Pollution Prevention Team
- Page 54 and 55: Table 2.1 Pollution Prevention Team
- Page 57 and 58: Table 4.1 Tenant's Industrial Activ
- Page 59: Table 4.1 Tenant's Industrial Activ
- Page 63: Figures Figures are not included wi
- Page 68 and 69: AZPDES MULTI-SECTOR GENERAL PERMIT
- Page 70 and 71: Non-mining MSGP 2010 General Permit
- Page 72 and 73: Non-mining MSGP 2010 General Permit
- Page 74 and 75: Non-mining MSGP 2010 General Permit
- Page 76 and 77: Non-mining MSGP 2010 General Permit
- Page 78 and 79: Non-mining MSGP 2010 General Permit
- Page 80 and 81: Non-mining MSGP 2010 General Permit
- Page 82 and 83: Non-mining MSGP 2010 General Permit
- Page 84 and 85: Non-mining MSGP 2010 General Permit
- Page 86 and 87: Non-mining MSGP 2010 General Permit
- Page 88 and 89: Non-mining MSGP 2010 General Permit
- Page 90 and 91: Non-mining MSGP 2010 General Permit
- Page 92 and 93: Non-mining MSGP 2010 General Permit
- Page 94 and 95: Non-mining MSGP 2010 General Permit
- Page 96 and 97: Non-mining MSGP 2010 General Permit
- Page 98 and 99: Non-mining MSGP 2010 General Permit
- Page 100 and 101: Non-mining MSGP 2010 General Permit
- Page 102 and 103: Non-mining MSGP 2010 General Permit
- Page 104 and 105: Non-mining MSGP 2010 General Permit
- Page 106 and 107: Non-mining MSGP 2010 General Permit
- Page 108 and 109: Non-mining MSGP 2010 General Permit
Table 4.1<br />
Tenant's Industrial Activities for 2013<br />
<strong>Phoenix</strong> <strong>Sky</strong> <strong>Harbor</strong> International Airport (PHX)<br />
Tenant<br />
AVE<br />
Maintenance<br />
AVE<br />
Cleaning<br />
AVE<br />
Storage<br />
Material<br />
Storage<br />
Area<br />
Airport Fuel<br />
System and<br />
Fuel Area<br />
Building &<br />
Grounds<br />
Maintenance<br />
OWS, Lavatory &<br />
Potable Water<br />
Service<br />
Aircraft<br />
Deicing<br />
Oxford Airport Technical Services <br />
Pacific Connection <br />
Pacific Simon A <br />
Papa Sierra <br />
Payless Rent-A-Car <br />
Piedmont Airlines Ramp <br />
Readyjet <br />
Salt River Project <br />
ServisAir <br />
Sixt Rent a Car <br />
<strong>Sky</strong> <strong>Harbor</strong> Airfield Maintenance <br />
<strong>Sky</strong> <strong>Harbor</strong> Building Maintenance <br />
<strong>Sky</strong> <strong>Harbor</strong> Fleet Maintenance <br />
<strong>Sky</strong> <strong>Harbor</strong> Landside Maintenance <br />
<strong>Sky</strong> <strong>Harbor</strong> Mechanical Maintenance C<br />
<strong>Sky</strong> <strong>Harbor</strong> Park Maintenance <br />
<strong>Sky</strong>West Airlines <br />
Southwest Airlines <br />
<br />
April 2014 Page 4 of 6