29.03.2015 Views

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Flagging Criteria<br />

Arizona Flags<br />

All method blanks, laboratory spikes, and/or matrix spikes met quality control objectives for the parameters<br />

associated with this Work Order except as detailed below or on the Data Qualifier page of this report. Data<br />

Qualifiers used in this report are in accordance with ADEQ Arizona Data Qualifiers, Revision 3.0 9/20/2007.<br />

Data qualifiers (flags) contained within this analytical report have been issued to explain a quality control<br />

deficiency, and do not affect the quality (validity) of the data unless noted otherwise in the case narrative.<br />

E8<br />

L1<br />

M1<br />

M2<br />

M3<br />

N1<br />

R2<br />

R5<br />

Analyte reported to MDL per project specification. Target analyte was not detected in sample.<br />

The associated blank spike recovery was above laboratory acceptance limits.<br />

Matrix spike recovery was high; the associated blank spike recovery was acceptable.<br />

Matrix spike recovery was low; the associated blank spike recovery was acceptable.<br />

The spike recovery value is unusable since the analyte concentration in the sample is disproportionate to<br />

spike level. The associated blank spike recovery was acceptable.<br />

See case narrative.<br />

RPD/RSD exceeded the laboratory acceptance limit. See case narrative.<br />

MS/MSD RPD exceeded the laboratory acceptance limit. Recovery met acceptance criteria.<br />

Page 4 of 19 Final 1.000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!