29.03.2015 Views

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CASE NARRATIVE<br />

Client Name: Four Corners Environmental<br />

Project Name: COP-Hydraulic Fluid Emergency Response<br />

Project ID:<br />

Work Order Number(s):<br />

13047<br />

466648<br />

Report Date:<br />

Date Received:<br />

23-JUL-13<br />

07/12/2013<br />

Sample receipt non conformances and comments:<br />

None<br />

Sample receipt non conformances and comments per sample:<br />

None<br />

Analytical non conformances and comments:<br />

Batch: LBA-918635 PAHs by SW 8310<br />

R2:<br />

The RPD for the target analyte was above acceptance criteria in the MS/MSD pair. Since the recovery and<br />

RPD for the target analyte were within criteria in the LCS/LCSD, no further action was required.<br />

Batch: LBA-918707 Volatiles by SW 8260B<br />

N1:<br />

Acetone, 2-Butanone and 2-Hexanone recovered above acceptance criteria in the LCS/LCSD and<br />

MS/MSD. This equates to a potential high bias. Since the associated field samples were non-detect for<br />

Acetone, 2-Butanone and 2-Hexanone, no further action was required.<br />

Page 3 of 19 Final 1.000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!