Corrective Action Report<br />

As required by MSGP-2010, Part 3.3, within 72 hours of discovery of any conditions listed in Part<br />

3.1, the permittee shall identify the condition triggering the need for corrective action review, a<br />

description of the problem identified and the date the problem was identified, which shall be<br />

maintained with this SWPPP. In addition, within 14 calendar days of discovery of any condition<br />

listed in Part 3.1, the permittee shall summarize the corrective action taken or to be taken,<br />

whether SWPPP modifications are required as a result of this discovery or corrective action, the<br />

date the corrective action was initiated or will be initiated and the date the corrective action was<br />

completed or is expected to be completed, which shall be maintained with the SWPPP.<br />

Fill out the following information with 72 hours of discovering a problem triggering a corrective action.<br />

Date Problem<br />

March 18, 2013<br />

Identified:<br />

Triggered<br />

Condition(s)<br />

(check one):<br />

Describe<br />

Identified<br />

Problem:<br />

☒An unauthorized discharge (e.g., discharge of non-stormwater not authorized by<br />

the permit) to a water of the U.S. or to a regulated MS4 occurs at the facility<br />

☐A discharge violates a numeric effluent limitation guideline<br />

☐Facility discharge causes or contributes to an exceedance of applicable water quality<br />

standard(s) or an adopted waste load allocation<br />

☐Modifications to the control measures are necessary to meet the permit<br />

requirements in Part 2.2<br />

Lavatory waste was spilled on the paved area west of the US Airways<br />

maintenance hangar. Staining indicated that the release reached a storm drain<br />

inlet.<br />

Fill out the following information within 14 calendar days of discovering a problem triggering a<br />

corrective action.<br />

Date Corrective Action<br />

3/18/13 Date Corrective Action Completed/ 3/18/13<br />

Initiated/Will Be Initiated:<br />

Expected to be Completed:<br />

Summarize<br />

See attached Lavatory Waste Release Response Report<br />

Corrective<br />

Action: