29.03.2015 Views

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Five-day follow-up reports are submitted to ADEQ at:<br />

Arizona Department of Environmental Quality – Water Quality Compliance<br />

1110 W. Washington Street, Mail Code 5515 B-1<br />

<strong>Phoenix</strong>, AZ 85007<br />

Office: 602-771-2330; Fax 602-771-4505<br />

7.2.3 Reportable Quantity Spills<br />

All PHX co-permittees including contractors operating at the facility must follow the<br />

spill response plan, which includes a provision to notify COPAD Operations of a spill.<br />

As required by MSGP-2010 Part 2.1.1.4, if a leak, spill or other release occurs that<br />

contains a hazardous substance, oil, or any pollutant that reaches a storm drain, dry<br />

well, or comes in contact with soil, COPAD notifies ADEQ Emergency Response Duty<br />

Office at (602) 771-2330.<br />

7.2.4 <strong>Plan</strong>ned Changes<br />

As required by MSGP-2010 Appendix B Part 12(a), PECM will notify ADEQ of physical<br />

alterations or additions to the facility if the alteration or addition:<br />

• Causes a reclassification of PHX as a “new source” as defined in 40 CFR 122.29(b);<br />

and<br />

• Significantly changes the nature or increases the quantities of pollutants discharged<br />

from PHX.<br />

7.2.5 Anticipated Noncompliance<br />

As required by MSGP-2010 Appendix B Part 12(c), COPAD gives advance notice of<br />

planned changes at PHX that would result in a permit noncompliance.<br />

7.2.6 Other Information<br />

As required by MSGP-2010 Appendix B Part 12(f), if COPAD determines that the NOI or<br />

other information reported to ADEQ was incorrect or incomplete, PECM will<br />

immediately submit the revised information to ADEQ.<br />

7.3 Recordkeeping<br />

As required by MSGP-2010 Part 7.5, PECM will retain a copy of the SWPPP and SWPPP<br />

attachments for a period of at least three (3) years from the date that coverage under the<br />

MSGP-2010 expires or is otherwise terminated.<br />

36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!