29.03.2015 Views

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

Stormwater Pollution Prevention Plan - Phoenix Sky Harbor ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Non-mining MSGP 2010 General Permit<br />

applicable: grit, screenings, and other solids handling, storage, or disposal areas; sludge drying<br />

beds; dried sludge piles; compost piles; septage or hauled waste receiving station; and access<br />

roads and rail lines.<br />

8.T.5.3<br />

Wastewater and Washwater Requirements. In accordance with Part 8.T.3.1, the permittee shall<br />

document in the SWPPP the methods of disposal of vehicle and equipment washwater<br />

generated at the facility and the name of any permits required by that method.<br />

8.T.6 Additional Inspection Requirements.<br />

(See also Part 4.1) Include the following areas in all inspections: access roads and rail lines; grit,<br />

screenings, and other solids handling, storage, or disposal areas; sludge drying beds; dried sludge piles;<br />

compost piles; and septage or hauled waste receiving station.<br />

<strong>Stormwater</strong> Discharges Associated with Industrial Activity – Sector T 79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!