<strong>VERIFICATION</strong> <strong>REPORT</strong><br />
- VOLUNTARY EMISSION REDUCTION –<br />
SOUTH POLE CARBON ASSET MANAGEMENT<br />
18.86 MW Bundled Wind Power Project, India<br />
<strong>VERIFICATION</strong> PERIOD<br />
2001-07-12 TO 2006-12-31<br />
(Including both days)<br />
Report No: 53700307-07/XX<br />
Date: 2007- June- 07<br />
TÜV NORD CERT GmbH<br />
JI/CDM Certification Program<br />
Langemarckstraße 20<br />
45141 Essen, Germany<br />
Phone: +49-201-825-3335<br />
Fax: +49-201-825-3290<br />
www.tuev-nord.de<br />
www.global-warming.de<br />
1 of 21
Date of recommendation: Project No.:<br />
2007-06-07 53700407-07/XX<br />
Approved by: Organisational unit:<br />
Mr. Rainer Winter<br />
Client: Client ref.:<br />
South Pole Carbon Asset Management Mr. Patrick Burgi<br />
Summary:<br />
TÜV NORD JI/CDM Certification Program<br />
Project Title “18.86 MW Bundled Wind Power Project, India”<br />
Name of Project Participant As per section 1.3 of this report<br />
UNFCCC Ref No. NA<br />
Registered PDD and<br />
ACM0002: “Consolidated baseline methodology for grid-connected electricity<br />
Approved CDM Methodology<br />
used for Verification<br />
generation from renewable sources” (Version 06 date. 19/05/2006)<br />
Scope of Verification This scope of this engagement covers the verification and certification of voluntary<br />
greenhouse gas emission reductions generated by the above mentioned project<br />
covering 2001-07-12 to 2006-12-31.<br />
Verification Opinion The verification is based on the revised monitoring report (June 2007 Version 01),<br />
the monitoring plan as set out in the validated PDD, the validation report, emission<br />
reduction calculation spreadsheet and supporting documents made available to the<br />
TÜV NORD JI/CDM CP by the project participant.<br />
As a result of the verification, the verifier confirms that:<br />
• All operations of the project are implemented and installed as planned and<br />
described in the validated project design document.<br />
• The installed equipment essential for generating emission reductions runs<br />
reliable and is calibrated appropriately.<br />
• The monitoring system is in place and functional. The project is ready to<br />
generate GHG emission reductions.<br />
As the result of the verification, the verifier confirms that the GHG emission reductions<br />
are calculated without material misstatements in a conservative and appropriate<br />
manner. TÜV NORD JI/CDM CP herewith confirms that the project has achieved<br />
emission reductions in the above mentioned reporting period as below:<br />
Baseline Emissions 99075 t CO2eq<br />
Leakage 000 t CO2eq<br />
Project Emissions 000 t CO2eq<br />
Total Emission Reduction Verified 99075 t CO2eq<br />
Work carried out by:<br />
Asim Kumar Jana, Manojkumar Borekar, Hemant<br />
Joshi, Swapnil P Thanekar<br />
Work verified by:<br />
Mr. Rainer Winter<br />
2 of 21<br />
No distribution without permission from<br />
the Client or responsible organisational<br />
unit<br />
Limited distribution<br />
Unrestricted distribution
Abbreviations<br />
CAR Corrective Action Request<br />
CO2 Carbon dioxide<br />
CO2eq Carbon dioxide equivalent<br />
CEA Central Electricity Authority<br />
CR Clarification Request<br />
CDM Clean Development Mechanism<br />
ER Emission Reduction<br />
GHG Greenhouse gas(es)<br />
ISO International Standardisation Organisation<br />
MW Megawatt<br />
MWh Megawatt Hours<br />
MP Monitoring Plan<br />
MR Monitoring Report<br />
PDD Project Design Document<br />
PP Project Participant<br />
QA/QC Quality Assurance / Quality Control<br />
SPC South Pole Carbon<br />
UNFCCC United Nations Framework Convention on Climate Change<br />
VER Voluntary Emission Reduction<br />
3 of 21
Table of Contents Page<br />
1. INTRODUCTION ............................................................................................. 5<br />
1.1. Objective 5<br />
1.2. Scope 5<br />
1.3. Project Entities 6<br />
1.4 Project Location 6<br />
2. <strong>VERIFICATION</strong> TEAM..................................................................................... 9<br />
3. METHODOLOGY .......................................................................................... 11<br />
4. <strong>VERIFICATION</strong> FINDINGS ........................................................................... 12<br />
4.1. Summary of Findings and Conclusions 10<br />
5. <strong>VERIFICATION</strong> STATEMENT....................................................................... 18<br />
6. REFERENCES .............................................................................................. 19<br />
4 of 21
1. INTRODUCTION<br />
South Pole Carbon Asset Management (SPC) has commissioned the TÜV NORD<br />
JI/CDM Certification Program (formally UNFCCC accredited DOE) to carry out the<br />
verification of the project: “18.86 MW Bundled Wind Power Project, India”, with<br />
regard to the relevant requirements for voluntary emission reduction on demand /CON/ .<br />
The verifiers have reviewed the implementation of the monitoring plan (MP), for the<br />
VER project for the first crediting period 2001-07-12 to 2006-12-31.<br />
The applied monitoring methodology is “ACM0002: Consolidated baseline<br />
methodology for grid-connected electricity generation from renewable sources”<br />
(Version 06 date. 19/05/2006). GHG data related to voluntary emission reduction for<br />
the monitoring period covering 2001-07-12 to 2006-12-31 was verified in detailed<br />
manner using set of requirements, audit practices and principles as required under<br />
verification criteria.<br />
This report presents the findings and conclusions of the verification assessment of<br />
voluntary emission reduction.<br />
1.1. Objective<br />
The purpose of this verification, by independent checking of objective evidence, is as<br />
follows:<br />
- To verify that the project is implemented as planned and described in the project<br />
design document /PDD/ ;<br />
- To confirm that the monitoring system is implemented and fully functional to<br />
generate voluntary emission reductions (VERs) without any double counting; and<br />
- To establish that the data reported are accurate, complete, consistent,<br />
transparent and free of material error or omission by checking the monitoring<br />
records and the emissions reduction calculation.<br />
1.2. Scope<br />
The verification of this registered CDM project is based on the validated project<br />
design document /PDD/ , the monitoring report /MR1/, /MR2/ , emission reduction calculation<br />
spread sheet /XLS/ , supporting documents made available to the verifier and<br />
information collected through performing interviews and during the on-site<br />
assessment. Furthermore publicly available information was considered as far as<br />
available and required.<br />
The TÜV NORD JI/CDM CP has, based on the recommendations in the Validation<br />
and Verification Manual /VVM/ , employed a risk-based approach in the verification,<br />
focusing on the identification of significant risks and reliability of project monitoring<br />
and generation of emission reductions.<br />
5 of 21
1.3. Project Entities<br />
Project Participant: M/s Vivek Pharmachem (India) Ltd.<br />
M/s Gem Crafts Enterprises Pvt. Ltd.<br />
M/s ERCON Composites<br />
M/s S G Associates<br />
M/s Sanjay D Ghodawat<br />
M/s Sanjay D Ghodawat (HUF)<br />
M/s Star Flexi-Pack Industries<br />
M/s James Andrew Newton Art Exports Pvt. Ltd.<br />
M/s Chemical and Mineral Industries Pvt. Ltd.<br />
M/s Shree Ram Industries<br />
M/s Shree Ram Gum and Chemicals<br />
M/s Vanaz Engineers Ltd.<br />
M/s B.S.C. Textiles<br />
M/s B.S. Channabasappa & Sons<br />
M/s Hindustan Distilleries<br />
M/s S. K. Parik<br />
M/s Universal Starch Chem Allied Ltd<br />
M/s Jaychandra Agro Industries Pvt. Ltd.<br />
M/s Unique Sugars Limited<br />
M/s Shri Charbhuja Sales Corporation<br />
M/s Vishnu Textiles Corporation<br />
M/s Vandana Textiles<br />
M/s Umang Textiles<br />
M/s Awade Industries Private Limited<br />
M/s Suttatti Enterprises Pvt. Ltd.<br />
M/s Mayura Steel Pvt. Ltd.<br />
Contact person: Mr Deepak Zade<br />
Tel: 020-25533309 /25533206<br />
deepakzade@indiatimes.com<br />
Mr Deepak Zade<br />
Project Consultant: MITCON Consultancy Services Ltd<br />
Kubera Chambers, Shivajinagar,<br />
Pune 411005<br />
India<br />
Contact Person: Mr Deepak Zade<br />
Tel: 020-25533309 /25533206<br />
deepakzade@indiatimes.com<br />
6 of 21
1.4. Project Location<br />
Geographical location of each district where WTGs are installed:<br />
District Latitude Longitude<br />
Chitradurga (Karnataka) 14º 14´ N 76º 24´ E<br />
Nagarcoil (Tamil Nadu) 08º 10´ N 77º 26´ E<br />
Sangli (Maharashtra) 16º 52´ N 74º 34´ E<br />
Satara (Maharashtra) 16º 59´ N 74º 08´ E<br />
Dhulia (Maharashtra) 20º 54´ N 74º 47´ E<br />
Jaisalmer (Rajasthan) 26º 55´ N 70º 54´ E<br />
7 of 21
Location of Each Project:<br />
Location Village/<br />
Taluka<br />
District State<br />
M/s Vivek Pharmachem (India)<br />
Ltd.<br />
Elladakere Chitradurga Karnataka<br />
M/s Gem Crafts Enterprises<br />
Pvt. Ltd.<br />
Elladakere Chitradurga Karnataka<br />
M/s ERCON Composites Valliour, Nagarcoil Nagarcoil Tamilnadu<br />
M/s S G Associates Kundlapur, Kavthe<br />
Mahakal<br />
Sangli Maharashtra<br />
Sanjay D Ghodawat Van Vilas Sagar Chitradurga Karnataka<br />
Sanjay D Ghodawat (HUF) Van Vilas Sagar Chitradurga Karnataka<br />
M/s Star Flexi-Pack Industries Van Vilas Sagar Chitradurga Karnataka<br />
M/s James Andrew Newton Art<br />
Exports Pvt. Ltd.<br />
Valliour, Nagarcoil Nagarcoil Tamilnadu<br />
M/s Chemical and Mineral Village Bhu, Kita, Jaisalmer Rajasthan<br />
Industries Pvt. Ltd.<br />
Pithado ki Dhani,<br />
M/s Shree Ram Industries Village Bhu, Kita Jaisalmer Rajasthan<br />
M/s Shree Ram Gum and<br />
Chemicals<br />
Village Bhu, Kita Jaisalmer Rajasthan<br />
M/s Vanaz Engineers Ltd. Khori, Sakri Dhulia Maharashtra<br />
Vankusavade,<br />
Patan<br />
Satara Maharashtra<br />
Gawadewadi, Satara Maharashtra<br />
M/s B.S.C. Textiles<br />
Patan<br />
Vankusavde,<br />
Patan<br />
M/s B.S. Channabasappa & Gawadewadi, Satara Maharashtra<br />
Sons<br />
Patan<br />
Vankusavde,<br />
Patan<br />
M/s Hindustan Distilleries<br />
Vankusavde,<br />
Patan<br />
Satara Maharashtra<br />
8 of 21
Location Village/<br />
Taluka<br />
District State<br />
S. K. Parik Aral, Patan Satara Maharashtra<br />
M/s Universal Starch Chem<br />
Allied Ltd<br />
Bramhanwel, Sakri Dhule Maharashtra<br />
M/s Jaychandra Agro Bramhanwel, Sakri Dhule Maharashtra<br />
Industries Pvt. Ltd.<br />
M/s Unique Sugars Limited Bramhanwel, Sakri Dhule Maharashtra<br />
M/s Shri Charbhuja Sales Gojegaon, Patan Satara Maharashtra<br />
Corporation<br />
M/s Vishnu Textiles<br />
Corporation<br />
Devshi, Patan Satara Maharashtra<br />
M/s Vandana Textiles Devshi, Patan Satara Maharashtra<br />
M/s Umang Textiles Devshi, Patan Satara Maharashtra<br />
M/s Awade Industries Private<br />
Limited<br />
Devshi, Patan Satara Maharashtra<br />
M/s Suttatti Enterprises Pvt. Kati, Patan Satara Maharashtra<br />
Ltd. Kumminaghatta,<br />
Holallkere<br />
Chitradurga Karnataka<br />
M/s Mayura Steel Pvt. Ltd. Matrewadi Satara Maharashtra<br />
Madakaripura Chitradurga Karnataka<br />
2. <strong>VERIFICATION</strong> TEAM<br />
- The Verification Team was led by Asim Kumar Jana, TUV Nord - Mumbai, India.<br />
Mr. Jana, M.Tech (Env Engg), Dipl in Industrial Safety, is a TUV-CERT Lead<br />
auditor for ISO 9001/14001 and OHSAS 18001. He is Head - CDM Certification<br />
for TÜV Nord India operation and holds energy auditorship from Bureau of Energy<br />
Efficiency of India. He is an appointed assessor for JI/CDM certification program<br />
of TÜV Nord. For this verification he was assisted by:<br />
- Manojkumar Borekar, TÜV Nord -Pune, India. Mr. Borekar, M.Tech. (Energy<br />
Management), B.E. (Mechanical Engineering) and Certified Energy Auditor by<br />
Bureau of Energy Efficiency of India (Ministry of Power). Currently he is GHG<br />
and Energy Auditor-CDM Services for TÜV NORD India operation. He is an<br />
appointed CDM/JI Assessor for TÜV NORD JI/CDM CP and performed validation<br />
and verification of several CDM projects.<br />
- Hemant V. Joshi, TÜV Nord-Pune, India. Mr. Joshi, B.E. (Environmental<br />
Engineering), is a TÜV-CERT Lead auditor for ISO 9001/14001 and OHSAS<br />
18001. He has received extensive training in the CDM validation and verification<br />
process. He is an appointed expert for TÜV NORD JI/CDM Certification Program.<br />
- Swapnil Thanekar: He is CDM Analyst from TUV NORD-Pune. He is M.Tech.<br />
(Heat Power), B.E. (Mechanical Engineering) and engaged with TÜV India<br />
operation. He has participated in several verification and validations<br />
9 of 21
The final verification report is verified by<br />
- Mr. Rainer Winter. Mr. Winter works at TÜV NORD as ISO 9001/ 14001 Auditor<br />
and environmental verifier for EMAS. He is also an approved emission verifier<br />
within the European Emission Trading Scheme. Mr. Winter is an authorized<br />
JI/CDM assessor and is in charge of the JI/CDM Certification Program of TÜV<br />
NORD.<br />
10 of 21
3. METHODOLOGY<br />
The verification of the project was carried out in April - June 2007 after the contract<br />
dated.<br />
Preparations: From 2007-04-22 to 2007-05-01<br />
On-site verification: 2007-05-02<br />
(Draft) Reporting: 2007-05-20<br />
(Final) Reporting: From 2007-05-21 to 2007-06-07<br />
The verification consisted of the following steps:<br />
• A desk review of the Monitoring Report /MR1/ /MR2/ , the emission reduction<br />
calculation spreadsheet /XLS/ , and additional supporting documents which were<br />
submitted by the client. A customised verification protocol /CPM/ according to<br />
the Validation and Verification Manual /VVM/ was used to carry out risk based<br />
assessment,<br />
• On-Site assessment,<br />
• Background investigation and follow-up interviews with personnel of the<br />
project developer,<br />
• Verification reporting (Draft Verification Report and Final Verification Report).<br />
The criteria of this verification includes the relevant rules and steps of CDM (without<br />
considering the public availability of the MR and the verification report) and the<br />
contract conditions /CON/ .<br />
Nonconformities raised during the verification can either be seen as a non-fulfilment<br />
of criteria ensuring the proper implementation of a project or where a risk to deliver<br />
high quality emission reductions is identified.<br />
Corrective Action Requests (CARs) are issued, if:<br />
• There is a clear deviation concerning to the above mentioned applicable<br />
criteria (esp. the monitoring plan).<br />
• requirements set by the monitoring plan or qualifications in the validation<br />
opinion have not been met; or<br />
• There is a risk that the project would not be able to deliver emission<br />
reductions.<br />
The verification team may also use the term Clarification Request (CR), which would<br />
be issued if:<br />
• Additional information is needed to fully clarify an issue.<br />
The identified risks are reported in the form of CAR, CR and FAR in the Draft<br />
Verification Report (DVR). Based on the closer or response provided against the<br />
CAR and CR reported in the DVR and the revised MR, the Final Verification Report<br />
(FVR) containing the verification opinion is issued.<br />
11 of 21
4. <strong>VERIFICATION</strong> FINDINGS<br />
In the following paragraphs the findings from the desk review of the monitoring<br />
report /MR1/ , the PDD /PDD/ and other supporting documents, as well as from the onsite<br />
assessment and the interviews are summarised.<br />
The summary of CAR, FAR and CR issued are shown in Table 4-1:<br />
Table 4-1: Summary of CAR and CR<br />
Verification topic No. of CAR No. of FAR No. of CR<br />
Remaining issues 0 0 0<br />
Project implementation 1 0 0<br />
Internal and external data 0 0 0<br />
Environmental and social indicators 0 0 0<br />
Management and operational system 0 1 1<br />
Completeness of Monitoring 4 0 0<br />
Accuracy of emission reduction calculations 0 0 0<br />
Quality of Evidence to Determine Emission<br />
Reductions<br />
12 of 21<br />
0 0 0<br />
Management system and quality assurance 0 0 0<br />
SUM 5 1 1
4.1. Summary of Findings and Conclusion<br />
The findings of the Verification process are summarized in the table 4-1 below.<br />
Table 4-1: Findings and conclusions of the verification<br />
Topic #<br />
Remaining issues,<br />
CARs and CRs from<br />
previous validation<br />
-<br />
Topic #<br />
Project Implementation<br />
CAR 1<br />
Topic #<br />
Internal and External<br />
Data<br />
-<br />
Classification CAR FAR CR None<br />
Findings -<br />
Corrective Action -<br />
Conclusion To be checked du-ring next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings The monitoring plan is not addressing the unique<br />
location of project activity e.g. state, district, taluka,<br />
village, latitude and longitude where the project<br />
activity is implemented<br />
Corrective Action Revised monitoring is now properly amended and<br />
addressing the unique location of project activity e.g.<br />
state, district, taluka, village, latitude and longitude<br />
where the project activity is implemented in<br />
Conclusion<br />
tabulated as well as map form.<br />
To be checked du-ring next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings -<br />
Corrective Action -<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
13 of 21
Topic #<br />
Environmental and<br />
Social Indicators<br />
-<br />
Topic #<br />
Management and operational<br />
system<br />
CR 1<br />
Topic #<br />
Completeness of Monitoring<br />
CAR 2<br />
Classification CAR FAR CR None<br />
Findings -<br />
Corrective Action -<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings Project proponent are requested to submit O & M<br />
contact for each site to the validation team to assess<br />
the management and operational system<br />
Corrective Action Project proponent has submitted the contract for<br />
operating the wind mill between project proponent<br />
and wind mill operational company for all sites.<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings The considered crediting period mentioned in<br />
monitoring report is 12/07/2001 to 11/07/2008.<br />
However the defined crediting period is not<br />
applicable during this verification stage and<br />
appropriate changes should be made while revising<br />
the monitoring report.<br />
Corrective Action crediting period is now corrected in revised<br />
Conclusion<br />
monitoring report as 2001-07-12 to 2006-12-31<br />
To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
14 of 21
Topic #<br />
Completeness of Monitoring<br />
CAR 3<br />
Topic #<br />
Completeness of Monitoring<br />
CAR 4<br />
Classification CAR FAR CR None<br />
Findings In section 2 the period for project activity has been<br />
written as 12/07/2001 to 31/12/2006.<br />
Corrective Action The monitoring period has now been corrected in<br />
section 2 of the monitoring report as 2001-07-12 to<br />
2006-12-31.<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings Under executive summary of verification report the<br />
electricity generated by project activity for the<br />
crediting period (2001-07-12 to 2006-12-31) is<br />
mentioned 107.24 GWh. However during the data<br />
assessment by verification team, material<br />
Corrective Action<br />
misstatement was observed and needs appropriate<br />
corrections.<br />
The revised monitoring report has now been<br />
corrected and the electricity generated by project<br />
activity for the crediting period (2001-07-12 to 2006-<br />
12-31) is 104.99 GWh.<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
15 of 21
Completeness of Monitoring<br />
Topic #<br />
Quality of Evidence<br />
-<br />
Topic #<br />
Management System<br />
and Quality Assurance<br />
Management and<br />
operational system<br />
CAR 5<br />
-<br />
FAR 1<br />
Classification CAR FAR CR None<br />
Findings Baseline information with source applicable to the<br />
project activity should be address in the monitoring<br />
report<br />
Corrective Action Under section 8 of revised monitoring report, the<br />
relevant baseline information with source applicable<br />
to the project activity is now appropriately<br />
Conclusion<br />
addressed.<br />
To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings -<br />
Corrective Action -<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings -<br />
Corrective Action -<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
Classification CAR FAR CR None<br />
Findings<br />
Corrective Action<br />
Monitoring and calibration procedures (QA/QC<br />
management system) and programs have to be<br />
formalised and followed<br />
Conclusion To be checked during next periodic verification<br />
Appropriate action was taken<br />
MR was corrected correspondingly<br />
Appropriate action was not taken<br />
The project complies with the requirements<br />
The closure of the all the CARs and CRs issued above resulted in net ER of 99075<br />
tCO2eq for the period of 2001-07-12 to 2006-12-31.<br />
16 of 21
The vintage wise break-up of verified ER is as follows:<br />
Period Verified ER in tCO2eq<br />
12/07/2001- 31/12/2001 846<br />
01/01/2002- 31/12/2002 11983<br />
01/01/2003- 31/12/2003 15848<br />
01/01/2004- 31/12/2004 21704<br />
01/01/2005- 31/12/2005 19629<br />
01/01/2006- 31/12/2006 29066<br />
Total 99075<br />
17 of 21
5. <strong>VERIFICATION</strong> STATEMENT<br />
Project Title “18.86 MW Bundled Wind Power Project, India”<br />
Name of Project Participant As per section 1.3 of this report<br />
UNFCCC Ref No.<br />
Registered PDD and<br />
Approved CDM<br />
Methodology<br />
used for Verification<br />
Scope of Verification<br />
NA<br />
ACM0002: “Consolidated baseline methodology for grid-connected electricity<br />
generation from renewable sources” (Version 06 date. 19/05/2006)<br />
This scope of this engagement covers the verification and certification of voluntary<br />
greenhouse gas emission reductions generated by the above mentioned project<br />
covering 2001-07-12 to 2006-12-31.<br />
Verification Opinion The verification is based on the revised monitoring report (June 2007 Version 01),<br />
the monitoring plan as set out in the validated PDD, the validation report, emission<br />
reduction calculation spreadsheet and supporting documents made available to the<br />
TÜV NORD JI/CDM CP by the project participant.<br />
As a result of the verification, the verifier confirms that:<br />
• All operations of the project are implemented and installed as planned and<br />
described in the validated project design document.<br />
• The installed equipment essential for generating emission reductions runs<br />
reliable and is calibrated appropriately.<br />
• The monitoring system is in place and functional. The project is ready to<br />
generate GHG emission reductions.<br />
As the result of the verification, the verifier confirms that the GHG emission reductions<br />
are calculated without material misstatements in a conservative and appropriate<br />
manner. TÜV NORD JI/CDM CP herewith confirms that the project has achieved<br />
emission reductions in the above mentioned reporting period as below:<br />
Mumbai, 2007-06-07<br />
Baseline Emissions 99075 t CO2eq<br />
Leakage 000 t CO2eq<br />
Project Emissions 000 t CO2eq<br />
Total Emission Reduction<br />
Verified<br />
Asim K. Jana<br />
TÜV NORD JI/CDM Certification Program<br />
Verification Team Leader<br />
18 of 21<br />
99075 t CO2eq
6. REFERENCES<br />
Table 6-1: Documents provided by the project proponent<br />
Reference Document<br />
/CAL/ Calibration Certificate of energy meter, by Karnataka power transmission<br />
corporation limited for M/s GEM CRAFT wind project on dated 02/01/2007<br />
/CC/ Commissioning certificated by Karnataka power transmission corporation<br />
limited for M/s GEM CRAFT wind project on dated 01/04/2006<br />
/CON/ The signed contract between TUV NORD and South Pole Carbon Asset<br />
Management for carrying out verification of voluntary emission reduction.<br />
/JMR/ Monthly Electricity certificate by State Electricity Boards: Joint Meter Reading<br />
between Karnataka power transmission corporation limited and M/s GEM<br />
CRAFT form May 2006 to April 2007<br />
/MR1/ Monitoring Report “18.86 MW Bundled Wind Power Project, India”, draft<br />
version (0) on dated 25.05.2007<br />
/MR2/ Monitoring Report “18.86 MW Bundled Wind Power Project, India” for the<br />
period 2001-07-12 to 2006-12-31, revised version (1) on dated. 04.06.2007.<br />
/OM/ Contract for operating the wind mill between Enercon (India) and M/s GEM<br />
CRAFT enterprises private limited on dated 20/06/2005<br />
/PPA/ Power Purchase Agreement between Bangalore electricity supply company<br />
limited and M/s GEM CRAFT enterprises private limited on dated 21/04/2006<br />
/XLS/ Excel – Calculation sheets (baseline and emission reduction calculation )<br />
provided by the project participant<br />
Table 6-2: Background investigation and assessment documents<br />
Reference Document<br />
/ACM 0002/ Consolidated methodology for grid-connected electricity generation from<br />
renewable sources (version 06: 19 May 2006)<br />
/CEA/ CO2 Baseline Database for the Indian Power Sector, December 2006,<br />
published by Central Electricity Authority, Ministry of Power, Government of<br />
India<br />
19 of 21
Reference Document<br />
/DVR/ Draft Verification Report for the CDM project: “18.86 MW Bundled Wind<br />
Power Project, India” for the period of for the period 2001-07-12 to 2006-12-<br />
31.<br />
/KP/ Kyoto Protocol (1997)<br />
/MA/ Decision 17/CP.7 (Marrakech Accords):<br />
/SMP/ Simplified modalities and procedures for small- scale CDM project activities<br />
(Annex II to decision 21/CP.8)<br />
/PDD/ Project Design Document for “18.86 MW Bundled Wind Power Project, India”<br />
dated 10/04/2007.<br />
/VAL/ Validation Report for VER project for “18.86 MW Bundled Wind Power<br />
Project, India” issued by TUV Nord, Report number 53700307-07/XX dated<br />
29/05/2007.<br />
/VVM/ IETA, PCF Validation and Verification Manual (V. 4)<br />
/VCS/ The Voluntary Carbon Standard (V. 1)<br />
Table 6-3: Websites used<br />
Reference Link Organisation<br />
/cea/ www.cea.nic.in<br />
20 of 21<br />
Central Electricity Authority<br />
/dna-i/ www.envfor.nic.in/cdm The National Clean Development<br />
Mechanism (CDM) Authority<br />
/imef/ www.envfor.nic.in Indian Ministry of Environment and Forest<br />
/imp/ www.powermin.nic.in Indian Ministry of Power<br />
/ipcc/ www.ipcc-nggip.iges.or.jp IPCC publications<br />
/UNFCC/ http://cdm.unfccc.int UNFCCC<br />
/ieta/ http : //www.ieta.org/<br />
Website of International Emission trading<br />
Association (IETA)<br />
/MoP/ http : //www.powermin.nic.in/ Website of Ministry of Power, Government<br />
of India<br />
/cma/ http://www.natcomindia.org/dat<br />
asources.htm<br />
Natcom India, Ministry of Environnement<br />
and Forest, Government of India.
Reference Link Organisation<br />
/appcb/ http://www.appcb.org/ Andhra Pradesh Pollution Control Board<br />
/GHG/ http://www.ghgprotocol.org/tem<br />
plates/GHG5/layout.asp?MenuI<br />
D=849<br />
Table 6-4: Interviewed Persons<br />
21 of 21<br />
World Business Council for Sustainable<br />
Development<br />
Reference MoI1 Name Organisation / Function<br />
/IM01/ V Mr.<br />
Ms<br />
/IM01/ V Mr.<br />
Ms<br />
/IM02/ V Mr.<br />
Ms.<br />
/IM03/ V Dr.<br />
Mr.<br />
Ms.<br />
/IM03/ V Mr.<br />
Ms.<br />
/IM03/ V Mr.<br />
Ms.<br />
/IM03/ V Mr.<br />
Ms.<br />
/IM03/ V Mr.<br />
Ms.<br />
/IM03/ V Mr.<br />
Ms.<br />
/IM03/ V Mr.<br />
Ms.<br />
Patrick Burgi South Pole Carbon Asset<br />
Management<br />
Camerata Thomas South Pole Carbon Asset<br />
Management<br />
Deepak Zade Exec. Vice President, M/S<br />
Mitcon Consultancy<br />
Services Ltd.<br />
Bhushan Pachpande Consultant, M/S MITCON<br />
Consultancy Services Ltd.<br />
Dipak Patil Consultant, M/S MITCON<br />
Consultancy Services Ltd.<br />
Avadoot Marathe MSEB Licensing - SUZLON<br />
Nandakumar Satre Section Head - SUZLON<br />
D.S Mane DPR Operator - SUZLON<br />
Babasaheb Dangat Mech. Engg. -SUZLON<br />
Rahul Ghadge Store Incharge - SUZLON