Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

Above Rs 25 lakh -2%<br />

• EMD should be timely<br />

submitted by the vendor<br />

• EMD must be returned to<br />

unsuccessful bidders within<br />

30 days from the award of<br />

contract to the successful<br />

bidder<br />

(Refer Rule No. 20 of<br />

Procurement Rules 2008)<br />

24 Verify the adequacy of<br />

performance security<br />

(Refer Rule No. 21 of<br />

Procurement Rules 2008)<br />

• Non adherence to Procurement<br />

Rules 2008<br />

• Inadequate performance security<br />

• Potential risk of expiry of<br />

performance security before<br />

stipulated period<br />

• Take an appropriate sample out of total contracts awarded<br />

• Verify the adequacy of performance security amount i.e. 5 to 10% of the<br />

value of the contract<br />

• Check validity of performance security, it should be valid for 60 days beyond<br />

date of completion of all contractual obligations, if not then report the same<br />

25 Advance to suppliers should not<br />

exceed the following limits:<br />

• Advance given for items which are<br />

not mentioned in Rule No. 22 of<br />

• Note down the details of advances given during the audit period and<br />

adequate report deviations and verify if security has been obtained against<br />