24.03.2015 Views

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

2.2 Detailed <strong>Audit</strong> Checklist<br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

A<br />

Requisitioning<br />

1 Verification of Material<br />

Requisition Plan<br />

• Unbudgeted/Unapproved<br />

purchases<br />

• Ordering of material which is not<br />

required<br />

• Delays in ordering of material<br />

• Verify whether a Material Requisition Plan/ Procurement Plan is available<br />

• Verify whether the classification in Material Requisition Plan /Procurement<br />

Plan is done for Capital items, Revenue items, Recurring and Provision for<br />

Non-Recurring items<br />

• Verify whether the Material Requisition Plan /Procurement Plan is approved<br />

by the approving authority<br />

• Verify that the Material Requisition Plan/ Procurement Plan is in accordance<br />

with the approved annual budget<br />

• Obtain list of all requisitions for material/services raised during the audit<br />

period<br />

• Select a sample of approved requisitions for detailed verification<br />

• Verify whether reasons are documented for rejected requisitions (if any)<br />

• Compare actual material requisitions with the approved plan<br />

• Obtain justification for deviations<br />

Page 86 of 705

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!