24.03.2015 Views

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

S. No. Item Response<br />

2.4 Minimum standards of constructions<br />

2.5 Monitoring of construction; whether an independent agency/engineer is provided<br />

2.6 Minimum standards of Operation and Maintenance whether Output based / input based<br />

2.7 Penalties for violation of prescribed design, construction and O&M standards<br />

2.8 Safety related provisions<br />

2.9 Environment related provisions<br />

3. Financial<br />

3.1 Maximum period for achieving financial close<br />

3.2 Whether Right to mortgage / pledge / hypothecate / lien is being given<br />

3.3 Performance Security Value<br />

3.4 Source, nature and extent of capital grant/subsidy contemplated<br />

3.5 Bidding parameter (capital subsidy or other parameter)<br />

3.6 Provisions for change of scope and the financial burden thereof<br />

3.7 Likely Concession fee, if any, payable by/payable to the Concessionaire<br />

3.8 User charges/fee to be collected by the Concessionaire<br />

3.9 Indicate how the user fee is to be determined; the legal provisions in support of user fee (attach the relevant<br />

rules/notification); and the extent and nature of indexation for inflation<br />

3.10 Provisions, if any, for mitigating the risk of lower revenue collection<br />

3.11 Provisions relating to escrow account, if any<br />

Page 684 of 705

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!