24.03.2015 Views

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

S. No. Item Response<br />

2.4 Minimum standards of constructions<br />

2.5 Monitoring of construction; whether an independent agency/engineer is provided<br />

2.6 Minimum standards of Operation and Maintenance whether Output based / input based<br />

2.7 Penalties for violation of prescribed design, construction and O&M standards<br />

2.8 Safety related provisions<br />

2.9 Environment related provisions<br />

3. Financial<br />

3.1 Maximum period for achieving financial close<br />

3.2 Whether Right to mortgage / pledge / hypothecate /<br />

lien is being given<br />

3.3 Performance Security Value<br />

3.4 Source, nature and extent of capital grant/subsidy contemplated<br />

3.5 Bidding parameter (capital subsidy or other parameter)<br />

3.6 Provisions for change of scope and the financial burden thereof<br />

3.7 Likely Concession fee, if any, payable by/payable to the Concessionaire.<br />

3.8 User charges/fee to be collected by the<br />

Concessionaire<br />

3.9 Indicate how the user fee is to be determined; the legal provisions in support of user fee (attach the relevant<br />

rules/notification); and the extent and nature of indexation for inflation<br />

3.10 Provisions, if any, for mitigating the risk of lower revenue collection<br />

3.11 Provisions relating to escrow account, if any<br />

Page 676 of 705

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!