24.03.2015 Views

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

Payments that should have been made under normal<br />

disbursement procedures with full documentation<br />

• Verify that following items do not qualify for reimbursement<br />

Amount recovered towards security deposit is not eligible<br />

Secured advance paid on material is not reimbursable<br />

Local transportation charges are not reimbursable<br />

Insurance premium paid in foreign exchange are eligible for<br />

bank financing, self insurance and premium paid in local<br />

currency are ineligible unless explicitly provided in local<br />

agreement<br />

The bank does not finance custom duties and other taxes<br />

imposed by borrowing country<br />

• Scrutinize the statement of expenditure with reference to report<br />

of AC/DC bills .As the expenditure is met by drawing funds on<br />

AC bills. The admissible expenditure will expenditure supported<br />

by DC bills<br />

3 Aspects of contract • Weaknesses around Contract<br />

Management<br />

• Review the following aspects of<br />

project eligibility of contractors<br />

Page 602 of 705

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!