Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

• Check that till the time it is not known that to which works the reserve<br />

stores are to be debited, they are accounted for in a suspense account<br />

of stock<br />

• Verify whether all road material is charged at once to the minor head<br />

―repairs‖ and when the road material is acquired specially for use in the<br />

construction of a road or other work, its cost is debited to the estimate<br />

for such construction<br />

• Verify whether all purchases made for the requirements of works<br />

generally are accounted for under the suspense head ―stock‖<br />

• Verify whether all purchases made specially for a work are charged to<br />

that work<br />

27 Reserve of Stock<br />

(Refer Para 183, 184 and 192 of<br />

Volume VI , Financial Handbook)<br />

• Inadequate reserves resulting in delay in<br />

construction activity<br />

• Unauthorized maintenance of reserves<br />

• Verify the basis of deciding the quantity of reserve stock to be<br />

maintained, the quantity of reserve stock should be neither to less nor<br />

too much<br />

• Verify whether specific sanctions are available for procuring reserve<br />

stock<br />

• Verify whether reserve stock is procured only upto the monetary limit<br />

prescribed by the Government<br />

• Check that all these stores are not debited at once to any specific work<br />