24.03.2015 Views

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

authorised person out of which one person should be from finance<br />

department like divisional accountant<br />

24 Final Payment • Recoveries not being made from the<br />

final bill<br />

• Payment without satisfactory completion<br />

of work<br />

• Verify whether a complete list of materials issued<br />

to the contractors against the particulars of recoveries already made<br />

from the on account bills is enclosed with the final bill<br />

• Verify whether all recovery on account of hire charges, electricity, water<br />

supply etc have been fully made<br />

• Verify whether the Final Payment for the Project has been processed<br />

only after receiving a certificate from the Engineer/ Officer-in-Charge<br />

detailing the fact that he is satisfied that the work has been executed as<br />

per the contractual specifications<br />

I<br />

Stores<br />

25 Purchase and supply of stores<br />

(Refer <strong>Uttarakhand</strong> Procurement<br />

rules 2008)<br />

• Unauthorized purchases<br />

• Charging of illicit rates<br />

• Verify whether the purchase process is as per the procurement Rules<br />

2008.<br />

• Verify whether all purchases of stores are sanctioned by the competent<br />

Page 367 of 705

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!