Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

The pre despacth inspection though was incorporated in the<br />

contracts but, the same was subsequently waived without any<br />

reason , thus jeoparadizing the quality aspects as per contractual<br />

requirement<br />

The submission of performance bank guarantee was waived<br />

Even though the contracts were placed on FOR destination, the<br />

locations were changed nearer to the suppliers‘ premises without<br />

taking into account the benefit of freight charges.<br />

• Verify whether the annual rate contracts are timely renewed and<br />

approved by Competent Authority, if any<br />

• Verify whether the following controls are in place in case of amendment<br />

of an existing contract:<br />

In case of any delay in the completion of work the contractor should<br />

have given prior notice in writing to the engineer in charge, for<br />

seeking extension of time<br />

Such applications must state the grounds which hindered the<br />

contractor in the execution of work within the stipulated time<br />

The engineer in charge must be of the opinion that the grounds<br />

shown for the extension of time are reasonable<br />

Page 351 of 705