Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

expired lying in the Health Centres because of an inadequate process of issue<br />

of medicines<br />

• Conduct a Physical Verification of medicines lying in Dispensary, report in<br />

case expired medicines/ drugs are found and report any shortages/ damages<br />

found<br />

B<br />

Medical Infrastructure<br />

9 Adequacy of Medical<br />

Infrastructure<br />

• Inadequate Infrastructure despite<br />

fund availability<br />

• Delay in completion of construction<br />

projects leading to escalation of<br />

costs<br />

• Obtain the records of all major and minor equipments available in the Hospital<br />

/ Health Centres<br />

• Obtain a copy of physical verification report conducted by respective<br />

department on a annual basis<br />

• Verify through a physical visit to the Hospitals, whether all major and minor<br />

equipments mentioned in the Equipment register are physically available in<br />

the Hospital<br />

• Verify on a sample basis whether adequate number of beds are available in<br />

the hospitals commensurate with the number of patients visiting the Hospitals<br />

for getting admission<br />

• Verify whether the construction activities with respect to the various Health<br />

centers were initiated and completed as per the approved plan<br />