Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

prescribed ceiling percentage of the entire project cost<br />

Verify whether the school grant is spent only by<br />

SMC/VEC(Village Education Committee)<br />

Verify that the total management cost does not exceed<br />

the specified percentage of the district annual budget<br />

Verify that the construction cost of BRC(Block Resource<br />

center) does not exceed the prescribed limit<br />

Verify that the construction cost of CRC(Cluster<br />

Resource center) does not exceed the prescribed limit<br />

Verify that the construction cost of non school (BRC and<br />

CRC) does not exceed the prescribed percentage of the<br />

overall projected expenditure in a year<br />

Verify whether the contingency grant and other grants for<br />

BRC/CRC are as per the laid provisions<br />

• Verify whether the objectives envisaged to be achieved from<br />

other schemes such as ―Mid Day Meal scheme‖ and<br />

―Rashtriya Madhyamik Siksha Abhiyan‖(RMSA) have actually<br />

been achieved<br />

Page 297 of 705