Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Sr. No Activity Risk <strong>Audit</strong> Steps<br />

away from small /medium town<br />

5 Rural Connectivity • Non achievement of scheme<br />

objectives<br />

• Inadequate implementation of the<br />

scheme<br />

Prime Minister Rural Road Scheme<br />

• Verify by obtaining relevant records as per the guidelines of the scheme,<br />

whether the following objectives of the scheme have been met:<br />

Provide connectivity to all habitations with a population of 1000 persons<br />

and above (500 persons and above in the case of hilly or tribal areas)<br />

with an all-weather road<br />

Construction of rural roads (new connectivity) and upgradation of<br />

existing rural roads to provide ‗full farm to market connectivity‘<br />

Verify that connectivity is provided only to eligible habitation (A<br />

habitation which was earlier provided all weather connectivity would not<br />

be eligible even if the present condition of the road is bad)<br />

Verify that connectivity is given till the nearest connected all weather<br />

road<br />

Verify that each work that is taken up is under PMGSY is a part of core<br />

Network (<strong>Core</strong> network comprises of through routes and link routes)<br />

Verify that only rural area is covered under PMGSY<br />

Verify that no repair work is done for black – topped or cement roads<br />

Page 273 of 705