Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Detailed observation indicating absence of control/ existence of gaps in a particular<br />

department, area, function etc.<br />

• Risk:<br />

The Probable loss (financial / non financial that may occur in case of the above mentioned<br />

absence of control<br />

• Recommendation:<br />

Action recommended by the <strong>Audit</strong> team for addressing the risk. Always be aware of the cost/<br />

benefit implications of any recommendations made<br />

• Management Response:<br />

<strong>Audit</strong>ee‘s response to the observation, including identifying the action to be taken to address<br />

the risk, who will take the action (Responsible official), and a date by which the action will be<br />

completed (Timeline).<br />

Guidelines for the preparation, distribution and approval of audit reports<br />

• The team-in-charge should prepare the audit report including the covering letter<br />

• A copy of the report should be provided to the auditees before the exit meeting.<br />

• Prior to the exit meeting, the team-in-charge's copy of the report should be referenced to<br />

the audit work papers<br />

• Management Comments should be obtained during discussion in Exit Meeting<br />

• Based on Exit Meeting, Draft reports will be issued to the auditees with direct<br />

responsibility for the facility, function, process or department audited including their<br />

responses provided during Exit Meeting within a week of Exit Meeting. Head of <strong>Audit</strong> will<br />

determine additional distribution to higher level management<br />

• Final audit report shall be issued upon receiving confirmation/response to draft<br />

audit report and approval of audit report by competent authority. Incase of no<br />

response within one month from the date of issue of draft audit report, draft audit<br />

report shall be automatically converted to final audit report<br />

• <strong>Audit</strong> Reports are confidential and are not to be distributed outside or to other<br />

departments without the consent of head of <strong>Audit</strong>.<br />