24.03.2015 Views

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

Step – 9<br />

After the approval of <strong>Audit</strong> report by duly constituted Expert Committee / <strong>Audit</strong> Review<br />

Committee, report should be circulated to concerned office, HOD‘s and the Government<br />

Steps in Details<br />

Intimation of <strong>Audit</strong><br />

• Before the commencement of any audit The auditee department would be provided an<br />

information sheet in a prescribed format, which should be duly filled in that prescribed<br />

format ‖. This should be submitted to audit team Well before the start of audit<br />

The auditee department would be informed about the schedule of the audit duly approved by<br />

component authority. For this purpose the auditee would be informed in writing through a<br />

commencement letter to the head of the auditee department at least a month before the<br />

audit is to be initiated to give them adequate notice to arrange the necessary records and<br />

resources for a smooth conduct of the audit.<br />

The Commencement Letter should at least include the following details:<br />

• Address the letter to the highest individual responsible for the function/department in the<br />

region. Estimated duration of the audit<br />

• Lead auditors and staff assigned for the audit<br />

• Schedule opening conference<br />

• Objective of audit<br />

• Scope of the audit and period it shall cover<br />

• The intention of the <strong>Audit</strong> head to have an exit meeting to discuss issues arising out of the<br />

audit<br />

• Request for necessary information and documents<br />

The letter should be marked to the Functional head and head of <strong>Audit</strong>.<br />

Filling up of the assignment commencement form<br />

The assignment commencement form shall be prepared and filled by the <strong>Audit</strong> head for<br />

initiation of an <strong>Audit</strong>. The form shall assign a project title/name and project number to the<br />

proposed audit. It shall state the audit objectives and any special concerns or considerations<br />

in respect of the assignment. It shall reflect the audit period and the audit staff who shall be<br />

Page 12 of 705

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!