24.03.2015 Views

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

Audit Manual - Core Treasury System Uttarakhand

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Government of <strong>Uttarakhand</strong><br />

<strong>Audit</strong> <strong>Manual</strong><br />

v. Test <strong>Audit</strong>: Tests of controls are audit procedures performed to evaluate the<br />

effectiveness of either the design or the operation of an internal control. Tests of controls<br />

directed toward the design of the control focuses on evaluating whether the control is<br />

suitably designed to prevent material weaknesses<br />

Step – 2<br />

Before Commencement of an audit, a prior instruction/ information should be sent to the<br />

concerned department (auditee), instructing the auditee to furnish basic audit information in a<br />

prescribed format as given under ―<strong>Audit</strong> Formats No.<br />

Step – 3<br />

Date of commencement of <strong>Audit</strong> (Kick- off meting) and <strong>Audit</strong> Process should be communicated 4<br />

weeks in advance to respective HOD‘s/HOO‘s/ DDO‘s. Ensure that the concerned departmental<br />

staff and officers are available when <strong>Audit</strong> team arrives for audit. All records/ documents are<br />

readily available to the <strong>Audit</strong> team<br />

Step – 4<br />

<strong>Audit</strong> team incharge/ leader should ensure that on a periodic basis, audit observations are<br />

informed to the concerned officer (HOD‘s/HOO‘s/ DDO‘s). Upon completion of the audit, a draft<br />

report should be circulated to the concerned officer<br />

Step – 5<br />

Responses/ clarifications on draft observations circulated by <strong>Audit</strong> Incharge should be duly<br />

responded by concerned officer (HOD‘s/HOO‘s/ DDO‘s) within stipulated time frame (not later<br />

than the date of exit meeting scheduled)<br />

Step – 6<br />

<strong>Audit</strong> team Incharge/ leader should ensure that a final exit meeting is conducted with concerned<br />

officer on audit observations and responses/ clarifications obtained<br />

Step – 7<br />

Post exit meeting <strong>Audit</strong> Report should be finalized by <strong>Audit</strong> team in charge incorporating the<br />

responses and clarifications received and submit the report to Director <strong>Audit</strong>/ Government,<br />

through proper channel, within stipulated time frame<br />

Step – 8<br />

<strong>Audit</strong> report should be examined and the prescribed format given below should be duly filled in<br />

by the Head Quarter officials. All reports should be duly reviewed by the duly constituted expert<br />

committee/ <strong>Audit</strong> review committee<br />

Page 11 of 705

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!