2.0 Continued<br />

Operations Review<br />

2.2.4 Gindalbie Terrain Joint Venture Project<br />

Nickel rights retained by <strong>Heron</strong>. Delta Gold <strong>Limited</strong> right to earn 70% in respect of gold through spending $1.0m.<br />

Gold - nickel.<br />

The 201km 2 project area covering 6 tenements is located 25-60km NE of Kalgoorlie on the eastern flank of the Scotia Kanowna<br />

Anticline. The main structural control of the project area is the Moriaty Shear Zone. The Moriaty structure is a bifurcation of the intensely<br />

gold-mineralised Bardoc Tectonic Zone, which is an associated structure occurring on the western flank of the Scotia Kanowna<br />

Anticline. The Gindalbie Terrrain adjoins the Golden Cities-Federal granitoid gold province.<br />

A detailed data appraisal and field inspection has generated both gold and lateritic nickel targets. The main gold target is the Moriaty<br />

Shear Zone in the SW project area, where alluvial gold previously has been mined. Drill access has been difficult, due to wet ground<br />

conditions since February <strong>2000</strong>.<br />

Delta has completed a GIS data review ahead of a regional Auger drilling program. <strong>Heron</strong>’s expenditure to date has been $0.21 million.<br />

2.2.5 Yindarlgooda Project<br />

<strong>Heron</strong> 100%.<br />

Nickel (- gold).<br />

The 58km 2 project area covering one tenement application is located 40km E of Kalgoorlie at Clinker Hill on the western flank of the<br />

Bulong Ultramafic Complex. <strong>Heron</strong>’s main target interest is lateritic nickel associated with the Bulong ultramafic units. From data<br />

reviews, several gold targets, including 3m at 5.49g/t Au, have been generated for follow-up once the tenement is granted.<br />

2.3 EMU FAULT PROVINCE<br />

GOLD EXPLORATION JOINT VENTURES<br />

2.3.1 Kurnalpi Gold Joint Venture Project<br />

<strong>Heron</strong> 100%. Farm-in partner right to earn 80%.<br />

Gold.<br />

The 260km 2 project area covering 4 tenements is located 60-90km E of Kalgoorlie, adjoining <strong>Heron</strong>’s Transline Joint Venture Project.<br />

Tenement grant is awaited.<br />

Following a GIS data review and target generation by <strong>Heron</strong>, a farm-out has been agreed whereby a farm-in partner may earn 80%,<br />

with <strong>Heron</strong> free-carried to decision to mine.<br />

A further 9 tenement applications covering 730km 2 are currently subject to farm-out negotiation. This project area has an excellent<br />

structural setting, covering the Emu-Avoca Fault System. The dominant outcrop lithology is felsic volcaniclastics and lateritised<br />

meta-sediments. This geological setting is analogous to that of the Randalls-Maxwells gold mining centre to the immediate south.<br />

From data reviews, several gold targets have been generated for drill follow-up once the tenements are granted. Significantly, borefield<br />

targets associated with Tertiary palaeochannels and the Emu-Avoca Fault System have been defined for future Kalpini process<br />

water requirements.<br />

2.3.2 Kalpini Gold Project<br />

<strong>Heron</strong> 100%.<br />

Gold.<br />

The 88km 2 project area covering 10 tenements is located 50-60km NE of Kalgoorlie, within felsic volcaniclastics occurring between<br />

the Avoca, GMQ and Emu Faults.<br />

The felsic volcaniclastic geological setting is comparable to that hosting the Carasue gold mine located to the northeast. Several gold<br />

targets have been generated by <strong>Heron</strong>’s regional soil geochemistry. These anomalies occur within a favourable structural setting, covering<br />

the Emu-GMQ Fault System. <strong>Heron</strong>’s main interest is volcanogenic massive sulphide targets, as potential sulphur sources for future nickel<br />

laterite processing. Literature reviews are current, with soil geochemical field programs planned to commence once key tenements<br />

are granted. <strong>Heron</strong>’s expenditure to date has been $0.10 million.<br />

<strong>Heron</strong> <strong>Resources</strong> NL <strong>Annual</strong> <strong>Report</strong> <strong>2000</strong> page 21