2000 Annual Report - Heron Resources Limited
2000 Annual Report - Heron Resources Limited
2000 Annual Report - Heron Resources Limited
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2.0 Continued<br />
Operations Review<br />
A geological evaluation of basal komatiite nickel-copper sulphide targets generated from <strong>Heron</strong>’s regional RC drilling was completed,<br />
with laterite resource Zones 4 to 6 emerging as the optimum nickel sulphide target areas. Soil geochemistry within the broad target<br />
area has coincident anomalies of 114-602ppm Cu and 788-1,941ppm Ni, notably at the Zone 4 Western Ultramafic. A soil anomaly<br />
of 50-230ppb Pd occurs at Zone 6, again indicating a potentially favourable nickel sulphide setting. A proposed farm-in partner has<br />
completed literature studies followed by field traversing to validate the <strong>Heron</strong> exploration model and target areas. Centaur has a preemptive<br />
right on any nickel sulphide farm-out.<br />
<strong>Heron</strong>’s expenditure to date at Kalpini has been $2.68 million.<br />
2.2 SCOTIA KANOWNA PROVINCE<br />
NICKEL LATERITE RESOURCES NOT WITHIN THE STRATEGIC ALLIANCE.<br />
GOLD EXPLORATION JOINT VENTURES.<br />
Nickel laterite projects have continued to be acquired by <strong>Heron</strong> in the Scotia Kanowna Province subsequent to the<br />
formation of the Strategic Alliance. These projects are to assist a future <strong>Heron</strong> stand-alone processing operation, independent<br />
of the Strategic Alliance.<br />
2.2.1 Scotia Kanowna Project<br />
<strong>Heron</strong> 100%.<br />
Nickel (- gold).<br />
The 62km 2 project area covering 7 recently pegged tenement applications is located 50-150km N of Kalgoorlie on the western flank<br />
of the Scotia Kanowna Anticline.<br />
The main target area is Vettersberg, adjoining the southern boundary of <strong>Heron</strong>’s Scotia Dam nickel laterite prospect. Grant of<br />
tenements is awaited, at which stage blanket 160x80m RC drilling of all ultramafic horizons will commence.<br />
Vettersberg Prospect<br />
Vettersberg occurs at the granite-greenstone contact on the eastern flank of the Goongarrie Dome, covering a 4km strike length of the<br />
nickel-prospective Walter Williams Formation. Previous drilling at Vettersberg confirms the presence of nickel laterite mineralisation.<br />
Following field mapping, a potential nickel sulphide target has been defined by <strong>Heron</strong> at the komatiite basal contact.<br />
<strong>Heron</strong>’s rockchip sampling of old costeans returned a peak value of 0.48% Ni from siliceous laterite. In terms of the lower nickel grades<br />
normally expected at surface, this result is encouraging. This zone is a high priority target, and drilling will commence once the<br />
tenements are granted.<br />
2.2.2 Kurnalpi Nickel Project<br />
<strong>Heron</strong> 100%.<br />
Nickel (- gold).<br />
The recently pegged 203km 2 project area covering 5 tenement applications is located 50-100km NE of Kalgoorlie on the western flank<br />
of the Arcoona Granite in association with the Emu Fault. The project area adjoins the Kalpini Nickel Project, but is not part of the<br />
Strategic Alliance. Three significant nickel targets have been generated, with potential for both nickel laterite and nickel sulphide<br />
occurrences. Grant of tenements is awaited, at which stage blanket 160x80m RC drilling of the ultramafic horizons will commence.<br />
Wyo Well Prospect<br />
<strong>Heron</strong> has tenement applications at Wyo Well, providing access on grant to a 12km strike length of ultramafic lithologies. Previous<br />
RAB intercepts include 12m at 0.84% Ni and 4m at 0.81%Ni. This previous exploration was not specifically targeted at the nickel<br />
laterite potential. Good potential exists for a Kalpini-style resource development.<br />
<strong>Heron</strong> <strong>Resources</strong> NL <strong>Annual</strong> <strong>Report</strong> <strong>2000</strong> page 19