Operations Review<br />
2.0 Continued<br />
INDEPENDENT RESOURCE AUDIT<br />
An Independent Consultant has completed a draft audit of the <strong>Heron</strong> Nickel Laterite resource base. <strong>Heron</strong>’s<br />
methodology, quality assurance measures and data management were favourably assessed. Comparisons of<br />
resource estimates in respect of audited project areas were:<br />
Table 4 - RESOURCE COMPARISONS<br />
INDEPENDENT CONSULTANT<br />
Recoverable Resource Estimation<br />
0.5% Ni Cut-off Grade - Block Model<br />
HERON RESOURCES NL<br />
Fully Diluted One Metre Selvedge<br />
0.5% Ni Cut-off Grade - Polygonal End Area<br />
Project million tonne % Ni % Co million tonne % Ni % Co<br />
Goongarrie 229 0.74 0.06 233 0.74 0.06<br />
Kalpini 103 0.73 0.04 104 0.74 0.05<br />
Lake Rebecca 26 0.84 0.04 24 0.87 0.05<br />
TOTAL 358 0.74 0.05 361 0.75 0.05<br />
Results appear to be quite acceptable at a 0.5% Ni cut-off grade. At progressively higher cut-off grades, the Block<br />
Model tonnage estimates are increasingly lower than the Polygonal estimates. This is as expected when wide spaced<br />
drilling (400x80m) is used in Block Modelling. In view of the excellent continuity results to date at Goongarrie South<br />
using an 80x80m pattern, and subject to detailed lateral continuity studies, <strong>Heron</strong> may be able to use a 20x20m<br />
pattern for the Measured Mineral Resource estimates in its future Goongarrie South BFS.<br />
Figure 6 - GOONGARRIE SOUTH CROSS SECTIONS<br />
GOONGARRIE SOUTH<br />
69,200mN<br />
GSRC027<br />
GSRC028<br />
GSRC029<br />
GSRC030<br />
GSRC031<br />
GSRC034<br />
GSRC035<br />
GSRC036<br />
13/1.15/0.09<br />
5/1.34/0.12 4/0.93/0.10<br />
4/1.09/0.10<br />
17/0.9/0.06<br />
20/1.36/0.05<br />
48/1.15/0.10<br />
76m<br />
2600 mE<br />
75m<br />
68m<br />
2800 mE<br />
63m<br />
51m<br />
60m<br />
3000 mE<br />
60m<br />
66m<br />
GOONGARRIE SOUTH<br />
68,800mN<br />
GSRC190<br />
GSRC191<br />
GSRC192<br />
GSRC193<br />
GSRC194<br />
GSRC195<br />
GSRC196<br />
GSRC197<br />
GSRC198<br />
4/0.86/0.07<br />
11/1.39/0.23<br />
12/1.23/0.12<br />
18/0.83/0.02<br />
2/1.4/0.03<br />
6/1.01/0.49<br />
8/0.85/0.02<br />
18/1.52/0.29<br />
37/1.01/0.08<br />
71m<br />
89m<br />
2600 mE<br />
65m<br />
71m<br />
2800 mE<br />
89m<br />
80m<br />
81m<br />
3000 mE<br />
89m<br />
74m<br />
GOONGARRIE SOUTH<br />
68,400mN<br />
GSRC047<br />
GSRC040<br />
GSRC041<br />
GSRC042<br />
GSRC043<br />
GSRC044<br />
GSRC045<br />
GSRC046<br />
GSRC200<br />
GSRC201<br />
GSRC202<br />
70m<br />
5/0.86/0.13<br />
64m<br />
2600 mE<br />
53/1/0.05<br />
76m<br />
12/1.53/0.40<br />
15/1.35/0.11<br />
64m<br />
81m<br />
2800 mE<br />
68m<br />
78m<br />
2/0.87/0.54<br />
10/1.36/0.16<br />
25/1.00/0.04<br />
58m<br />
3000 mE<br />
77m<br />
20/1.2/0.16<br />
3200 mE<br />
13/0.95/0.02<br />
30/0.93/0.07<br />
8/1.07/0.06<br />
83m<br />
89m<br />
LEGEND<br />
>0.75 % Ni<br />
0.50 - 0.74 % Ni<br />
25m<br />
10/1.36/0.16<br />
INTERCEPT METRES / %Ni / %Co<br />
Photo Strip: This excavator was used for previous prospector exploration and mining at Goongarrie Hill. By chance, it<br />
opened up part of <strong>Heron</strong>’s Goongarrie Hill Nickel Laterite deposit. This excavation records large slabs of barren silica within<br />
the Nickel Laterite ore. This silica can be screened out, to increase Ni-Co grades by 35%.<br />
‘Dump Truck’ Shane Stokes “This is a painting of a dump truck carrying yellow sand.<br />
The sky is a grey-blue colour because of rain.”<br />
page 12<br />
<strong>Heron</strong> <strong>Resources</strong> NL<br />
<strong>Annual</strong> <strong>Report</strong> <strong>2000</strong>