20.03.2015 Views

2000 Annual Report - Heron Resources Limited

2000 Annual Report - Heron Resources Limited

2000 Annual Report - Heron Resources Limited

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operations Review<br />

2.0 Continued<br />

RESOURCE STATUS UPGRADE<br />

From the results compiled from the 80x80m drilling to date, the distribution of resources into Inferred and<br />

Indicated Mineral Resource categories is as follows:<br />

Table 3 - STRATEGIC ALLIANCE NICKEL LATERITE PROJECTS<br />

Medium Grade Inferred and Indicated Mineral Resource 0.75% Ni Cut-off<br />

Project Category Million Ni Co Ni4Co*<br />

Tonnes % % %<br />

Goongarrie Hill Inferred 15.7 1.09 0.06 1.33<br />

Indicated 2.0 0.99 0.04 1.14<br />

Sub-total 17.7 1.08 0.06 1.31<br />

Goongarrie South Inferred 32.5 1.06 0.07 1.39<br />

Indicated 30.5 1.10 0.11 1.53<br />

Sub-total 63.0 1.08 0.09 1.44<br />

Scotia Dam Inferred 9.1 1.10 0.11 1.56<br />

Indicated - - - -<br />

Sub-total 9.1 1.10 0.11 1.56<br />

Ghost Rocks Inferred 18.0 0.98 0.08 1.30<br />

Indicated - - - -<br />

Sub-total 18.0 0.98 0.08 1.30<br />

Kalpini Inferred 42.6 1.08 0.07 1.38<br />

Indicated 1.8 1.12 0.06 1.37<br />

Sub-total 44.4 1.09 0.07 1.38<br />

SUB-TOTAL Inferred 117.9 1.07 0.07 1.35<br />

SUB-TOTAL Indicated 34.3 1.09 0.10 1.51<br />

TOTAL STRATEGIC ALLIANCE 152.2 1.07 0.08 1.40<br />

* “Ni4Co%” is %Ni plus 4 times %Co.<br />

Having the higher quality Indicated Ore can substantially increase an Independent Valuation for a resource inventory,<br />

with a Yardstick Valuation typically doubling when the resource is upgraded from Inferred to Indicated status.<br />

When compared to the original 400x80m drilling, the grades generated from the 80x80m infil drilling are slightly higher,<br />

and the tonnes are slightly lower. This is the expected result of resource infill drilling.<br />

50,000,000<br />

1.5<br />

Figure 4 -<br />

GOONGARRIE PROJECT<br />

Comparison between<br />

400mx80m and 80x80m<br />

Resource Drilling<br />

Tonnes 400x80m<br />

Tonnes 80x80m<br />

%Ni 400x80m<br />

%Ni 80x80m<br />

Tonnage<br />

45,000,000<br />

40,000,000<br />

35,000,000<br />

30,000,000<br />

25,000,000<br />

20,000,000<br />

15,000,000<br />

10,000,000<br />

5,000,000<br />

41,600,000<br />

0.91<br />

44,850,000 1.32<br />

1.31<br />

1.12<br />

1.09<br />

0.90<br />

27,190,000<br />

24,630,000<br />

13,870,000<br />

13,740,000<br />

1.4<br />

1.3<br />

1.2<br />

1.1<br />

1.0<br />

0.9<br />

0.8<br />

0.7<br />

0.6<br />

0.5<br />

0.4<br />

0.3<br />

0.2<br />

0.1<br />

% Nickel Grade<br />

0<br />

0.50 0.75 1.00<br />

% Ni Cut-Off<br />

0.0<br />

Photo Strip: The drill samples are sieved and the drill chips are collected in chip trays as <strong>Heron</strong>’s reference set of the ore.<br />

<strong>Heron</strong> has some 50,000 of these chip samples archived at its Kalgoorlie office. The hardest and most important job on the<br />

rig is collecting the drill samples. A $1.4 billion investment decision hinges significantly on how well this job is done.<br />

‘The Mullock Dump of Binduli Mine’ Merita Stevens “This painting represents the Binduli mine.<br />

The big orange hill is the mullock dump.”<br />

page 10<br />

<strong>Heron</strong> <strong>Resources</strong> NL<br />

<strong>Annual</strong> <strong>Report</strong> <strong>2000</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!