2000 Annual Report - Heron Resources Limited
2000 Annual Report - Heron Resources Limited
2000 Annual Report - Heron Resources Limited
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Operations Review<br />
2.0 Continued<br />
RESOURCE STATUS UPGRADE<br />
From the results compiled from the 80x80m drilling to date, the distribution of resources into Inferred and<br />
Indicated Mineral Resource categories is as follows:<br />
Table 3 - STRATEGIC ALLIANCE NICKEL LATERITE PROJECTS<br />
Medium Grade Inferred and Indicated Mineral Resource 0.75% Ni Cut-off<br />
Project Category Million Ni Co Ni4Co*<br />
Tonnes % % %<br />
Goongarrie Hill Inferred 15.7 1.09 0.06 1.33<br />
Indicated 2.0 0.99 0.04 1.14<br />
Sub-total 17.7 1.08 0.06 1.31<br />
Goongarrie South Inferred 32.5 1.06 0.07 1.39<br />
Indicated 30.5 1.10 0.11 1.53<br />
Sub-total 63.0 1.08 0.09 1.44<br />
Scotia Dam Inferred 9.1 1.10 0.11 1.56<br />
Indicated - - - -<br />
Sub-total 9.1 1.10 0.11 1.56<br />
Ghost Rocks Inferred 18.0 0.98 0.08 1.30<br />
Indicated - - - -<br />
Sub-total 18.0 0.98 0.08 1.30<br />
Kalpini Inferred 42.6 1.08 0.07 1.38<br />
Indicated 1.8 1.12 0.06 1.37<br />
Sub-total 44.4 1.09 0.07 1.38<br />
SUB-TOTAL Inferred 117.9 1.07 0.07 1.35<br />
SUB-TOTAL Indicated 34.3 1.09 0.10 1.51<br />
TOTAL STRATEGIC ALLIANCE 152.2 1.07 0.08 1.40<br />
* “Ni4Co%” is %Ni plus 4 times %Co.<br />
Having the higher quality Indicated Ore can substantially increase an Independent Valuation for a resource inventory,<br />
with a Yardstick Valuation typically doubling when the resource is upgraded from Inferred to Indicated status.<br />
When compared to the original 400x80m drilling, the grades generated from the 80x80m infil drilling are slightly higher,<br />
and the tonnes are slightly lower. This is the expected result of resource infill drilling.<br />
50,000,000<br />
1.5<br />
Figure 4 -<br />
GOONGARRIE PROJECT<br />
Comparison between<br />
400mx80m and 80x80m<br />
Resource Drilling<br />
Tonnes 400x80m<br />
Tonnes 80x80m<br />
%Ni 400x80m<br />
%Ni 80x80m<br />
Tonnage<br />
45,000,000<br />
40,000,000<br />
35,000,000<br />
30,000,000<br />
25,000,000<br />
20,000,000<br />
15,000,000<br />
10,000,000<br />
5,000,000<br />
41,600,000<br />
0.91<br />
44,850,000 1.32<br />
1.31<br />
1.12<br />
1.09<br />
0.90<br />
27,190,000<br />
24,630,000<br />
13,870,000<br />
13,740,000<br />
1.4<br />
1.3<br />
1.2<br />
1.1<br />
1.0<br />
0.9<br />
0.8<br />
0.7<br />
0.6<br />
0.5<br />
0.4<br />
0.3<br />
0.2<br />
0.1<br />
% Nickel Grade<br />
0<br />
0.50 0.75 1.00<br />
% Ni Cut-Off<br />
0.0<br />
Photo Strip: The drill samples are sieved and the drill chips are collected in chip trays as <strong>Heron</strong>’s reference set of the ore.<br />
<strong>Heron</strong> has some 50,000 of these chip samples archived at its Kalgoorlie office. The hardest and most important job on the<br />
rig is collecting the drill samples. A $1.4 billion investment decision hinges significantly on how well this job is done.<br />
‘The Mullock Dump of Binduli Mine’ Merita Stevens “This painting represents the Binduli mine.<br />
The big orange hill is the mullock dump.”<br />
page 10<br />
<strong>Heron</strong> <strong>Resources</strong> NL<br />
<strong>Annual</strong> <strong>Report</strong> <strong>2000</strong>