Building the Solar Energy Value Chain in Saudi Arabia

Building the Solar Energy Value Chain in Saudi Arabia

Building the Solar Energy Value Chain in Saudi Arabia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Build<strong>in</strong>g</strong> <strong>the</strong> <strong>Solar</strong> <strong>Energy</strong><br />

<strong>Value</strong> <strong>Cha<strong>in</strong></strong> <strong>in</strong> <strong>Saudi</strong> <strong>Arabia</strong><br />

Ibrahim Babelli<br />

Chief Strategist<br />

K<strong>in</strong>g Abdullah City<br />

for Atomic and Renewable <strong>Energy</strong><br />

(K.A.CARE)


Royal Vision<br />

1


K.A.CARE Mandate<br />

The City shall aim at contribut<strong>in</strong>g<br />

to <strong>the</strong> susta<strong>in</strong>able development <strong>in</strong><br />

<strong>the</strong> K<strong>in</strong>gdom through utilization of<br />

science, research, and <strong>in</strong>dustries<br />

related to atomic and renewable<br />

energy for peaceful purposes <strong>in</strong> a<br />

way that leads to rais<strong>in</strong>g <strong>the</strong><br />

standards of liv<strong>in</strong>g and quality of<br />

life <strong>in</strong> <strong>the</strong> K<strong>in</strong>gdom<br />

2


Towards <strong>Energy</strong> Susta<strong>in</strong>ability<br />

The K<strong>in</strong>gdom of <strong>Energy</strong><br />

The K<strong>in</strong>gdom of<br />

Susta<strong>in</strong>able <strong>Energy</strong><br />

Towards<br />

greater<br />

susta<strong>in</strong>ability<br />

A new energy mix to meet local needs as well as ma<strong>in</strong>ta<strong>in</strong><br />

leadership role <strong>in</strong> <strong>the</strong> global energy landscape<br />

3


<strong>Energy</strong> Mix


Gradual Introduction of Renewable and Atomic energy<br />

Nuclear<br />

Renewables<br />

Fossil<br />

TWh<br />

Alternative energy will gradually replace fossil based generation<br />

5


Susta<strong>in</strong>able <strong>Energy</strong> Outlook for <strong>Saudi</strong> <strong>Arabia</strong><br />

W<strong>in</strong>d/O<strong>the</strong>r Ren<br />

<strong>Solar</strong> PV<br />

Needed Capacity (MW)<br />

<strong>Solar</strong> CST<br />

Nuclear<br />

New Required Fossil<br />

New Committed<br />

Exist<strong>in</strong>g Diesel<br />

Exist<strong>in</strong>g HFO<br />

Exist<strong>in</strong>g Crude<br />

Exist<strong>in</strong>g Gas<br />

2010 2020 2030 2050<br />

6


National HR<br />

Pillars of Susta<strong>in</strong>able Development<br />

Susta<strong>in</strong>able <strong>Energy</strong> Mix<br />

7<br />

R & D & T<br />

National legal<br />

Framework<br />

<strong>Value</strong> <strong>Cha<strong>in</strong></strong><br />

National Economic<br />

Framework<br />

Target Installed Capacity


Enabl<strong>in</strong>g <strong>the</strong><br />

<strong>Value</strong> <strong>Cha<strong>in</strong></strong>


Local <strong>Value</strong> <strong>Cha<strong>in</strong></strong> Creation Levers<br />

TYPES OF LEVERS<br />

EXAMPLES<br />

1<br />

1 "Communicative" levers<br />

Clear Communication of national strategy, <strong>in</strong>cl.<br />

> Clear commitment to program size<br />

> Stable/susta<strong>in</strong>able policy framework<br />

> Cluster development/Industrial zones<br />

"Communicative"<br />

levers<br />

2 Indirect (mostly regulatory) levers<br />

> Local content targets<br />

> Favorable custom duties<br />

> Simplified procedures (e.g. visa regulations)<br />

3<br />

Direct<br />

(f<strong>in</strong>ancial)<br />

levers<br />

LEVERS FOR<br />

THE LOCAL<br />

VALUE<br />

CHAIN<br />

2<br />

Indirect<br />

(regulatory)<br />

levers<br />

3 Direct (mostly f<strong>in</strong>ancial) levers<br />

Investment <strong>in</strong>centives as well as operational <strong>in</strong>centives<br />

> Soft loans<br />

> Loan guarantees<br />

> Equity participation<br />

> Support/grants<br />

– Investment grants<br />

– R&D grants<br />

– <strong>Energy</strong> support<br />

> Tax breaks/reductions<br />

> Export credit assistance<br />

– Wage support<br />

– "Cheap land" and<br />

<strong>in</strong>frastructure<br />

9


Enabl<strong>in</strong>g Structural Framework for <strong>Solar</strong> <strong>Energy</strong> <strong>Value</strong> <strong>Cha<strong>in</strong></strong><br />

Development<br />

Components of<br />

solar value<br />

cha<strong>in</strong>, <strong>in</strong> scope<br />

Levers<br />

Key questions to<br />

consider<br />

Emerg<strong>in</strong>g hypo<strong>the</strong>sis for KSA<br />

Rationale<br />

Generation<br />

1<br />

Ownership<br />

Who will own <strong>the</strong><br />

assets?<br />

Private or State Private<br />

partnership<br />

• Spur rapid growth <strong>in</strong> <strong>the</strong> renewable energy capacity<br />

while leverag<strong>in</strong>g global expertise<br />

• Government could consider some equity (<strong>in</strong> l<strong>in</strong>e with<br />

current IPP model) <strong>in</strong> a largely private model<br />

2<br />

Remuneration/<br />

Incentives<br />

Tariff<br />

related<br />

Invest<br />

ment<br />

related<br />

What <strong>in</strong>centives are<br />

required to support<br />

ongo<strong>in</strong>g operations?<br />

What is required to<br />

support <strong>in</strong>vestments?<br />

Regulated (Feed <strong>in</strong>) tariff • Ideal for less sophisticated markets; global best practice<br />

• Creates price transparency; easy to implement<br />

• Can <strong>in</strong>fluence <strong>the</strong> technology that is developed<br />

• Can be tiered (off grid/on grid)<br />

Investment <strong>in</strong>centives • Reduces <strong>in</strong>vestment risk for <strong>in</strong>vestors<br />

3<br />

Capacity<br />

allocation<br />

Does KSA want to limit<br />

<strong>the</strong> amount of capacity<br />

build up?<br />

Capacity allocation via tenders • Allocate such that each technology gets developed<br />

• Control addition to <strong>the</strong> grid capacity<br />

• Control money spent on <strong>in</strong>centiviz<strong>in</strong>g capacity build up<br />

• Support KSA’s development objectives by specify<strong>in</strong>g<br />

relevant criteria <strong>in</strong> <strong>the</strong> tender<br />

R&D and skill<br />

development<br />

4<br />

Incentives for<br />

local<br />

development<br />

M&A support<br />

What <strong>in</strong>centives are<br />

required for R&D and<br />

skill development <strong>in</strong><br />

KSA?<br />

What <strong>in</strong>centives are<br />

required for M&A for<br />

technology acquisition?<br />

• State f<strong>in</strong>anc<strong>in</strong>g for specific<br />

technologies i.e., <strong>Solar</strong><br />

CSP, PV and geo<strong>the</strong>rmal<br />

• Fund<strong>in</strong>g for universities/<br />

<strong>in</strong>stitutes and sett<strong>in</strong>g up<br />

tra<strong>in</strong><strong>in</strong>g academies<br />

F<strong>in</strong>anc<strong>in</strong>g support i.e low cost<br />

loans/equity f<strong>in</strong>anc<strong>in</strong>g for<br />

acquir<strong>in</strong>g technologies<br />

• Support research <strong>in</strong> areas where KSA has <strong>the</strong><br />

opportunity to dom<strong>in</strong>ate regionally or globally<br />

• Leverage local talent for emerg<strong>in</strong>g research<br />

opportunities<br />

• Enable local companies to acquire global<br />

technology/companies where ground up capability<br />

build<strong>in</strong>g will be time consum<strong>in</strong>g/expensive<br />

Supply <strong>Cha<strong>in</strong></strong> /<br />

cluster<br />

development<br />

5<br />

Procurement<br />

policy<br />

Incentives<br />

Does KSA want to<br />

regulate <strong>the</strong> level of local<br />

sourc<strong>in</strong>g?<br />

What <strong>in</strong>centives are required<br />

for Supply cha<strong>in</strong>?<br />

Specify % of localization <strong>in</strong><br />

component sourc<strong>in</strong>g e.g. 20%<br />

<strong>in</strong> <strong>the</strong> first few years <strong>in</strong>creas<strong>in</strong>g<br />

to 70% <strong>in</strong> 5-7 years time<br />

Specify development<br />

objectives via tenders<br />

• Promote <strong>in</strong>vestment and jobs <strong>in</strong> domestic <strong>in</strong>dustry<br />

• Promote supply cha<strong>in</strong> development by specify<strong>in</strong>g criteria<br />

<strong>in</strong> <strong>the</strong> tender e.g. jobs created, total <strong>in</strong>vestment etc<br />

10


Enabl<strong>in</strong>g <strong>Value</strong> <strong>Cha<strong>in</strong></strong> Development via Infrastructure Support<br />

▪ Transport: Easy access to<br />

<strong>in</strong>ternational flow by air/sea<br />

▪ Utilities: Adequate utilities for<br />

both <strong>in</strong>dustries and liv<strong>in</strong>g areas<br />

▪ Telecom: Un<strong>in</strong>terrupted, high<br />

quality telecom access at<br />

affordable prices<br />

Physical<br />

Infrastructure<br />

Industry<br />

development<br />

Ease of do<strong>in</strong>g<br />

bus<strong>in</strong>ess<br />

▪ Simple access to permits<br />

(land, manufactur<strong>in</strong>g,<br />

imports etc.)<br />

▪ 'S<strong>in</strong>gle w<strong>in</strong>dow' clearance for<br />

<strong>in</strong>vestors<br />

▪ Attractive liv<strong>in</strong>g standards for<br />

employees and families (e.g.,<br />

<strong>in</strong>ternational schools, medical<br />

center, English widely used etc)<br />

Livable<br />

community<br />

IP management<br />

and <strong>in</strong>cubation<br />

support<br />

▪ IP management: Evaluation<br />

of ideas and fil<strong>in</strong>g and<br />

monetization of IP’s<br />

▪ Incubation support: Provid<strong>in</strong>g<br />

<strong>in</strong>frastructure support for<br />

creation of new companies<br />

IP management<br />

Incubation support<br />

Research Evaluation IP fil<strong>in</strong>g<br />

Monetize<br />

▪ Sell<br />

▪ License<br />

Create<br />

company<br />

Create <strong>in</strong>dependently<br />

function<strong>in</strong>g<br />

companies<br />

External<br />

<strong>in</strong>vestors<br />

11


<strong>Value</strong> <strong>Cha<strong>in</strong></strong><br />

Breakdown


CSP Localization Example<br />

CSP core localization <strong>in</strong> Spa<strong>in</strong>, 2010<br />

% <strong>in</strong>vestment localized vs. imported<br />

- R E A L<br />

E X A M P L E -<br />

14%<br />

30%<br />

• As of today, Spa<strong>in</strong> is <strong>the</strong> largest<br />

CSP market <strong>in</strong> <strong>the</strong> world:<br />

– 1 GW operat<strong>in</strong>g<br />

– 1.2 GW under construction<br />

86%<br />

56%<br />

44%<br />

54%<br />

46%<br />

100%<br />

70%<br />

• Ma<strong>in</strong> activities localized are:<br />

– <strong>Solar</strong> Field (Mirrors, Receivers,<br />

Collectors and o<strong>the</strong>r m<strong>in</strong>or<br />

elements)<br />

– Services (EPC / O&M)<br />

• Storage localization is based on<br />

<strong>the</strong> <strong>in</strong>dustrial <strong>in</strong>frastructure that<br />

already existed <strong>in</strong> <strong>the</strong> country:<br />

storage tank, heat exchangers and<br />

pumps<br />

<strong>Solar</strong> Field Storage Power Block Services (EPC &<br />

O&M)<br />

Mirrors<br />

Receivers<br />

Collectors<br />

O<strong>the</strong>r m<strong>in</strong>or<br />

Localized<br />

Imported<br />

Total<br />

• The same applies to power blocks.<br />

Where <strong>the</strong> steam turb<strong>in</strong>e is<br />

imported but <strong>the</strong>y localize:<br />

– Insulat<strong>in</strong>g system<br />

– Cool<strong>in</strong>g tower<br />

– Pip<strong>in</strong>g<br />

– O<strong>the</strong>rs<br />

13


<strong>Value</strong> <strong>Cha<strong>in</strong></strong> Breakdown– Renewable <strong>Energy</strong><br />

Total <strong>in</strong>vestment breakdown: Manufactur<strong>in</strong>g, EPC and O&M per sub-technology<br />

% total capex and opex throughout <strong>the</strong> plant lifetime<br />

O<strong>the</strong>r<br />

Molten salt<br />

HTF<br />

Steam generator<br />

Turb<strong>in</strong>e<br />

Structures<br />

Absorber<br />

Mirrors<br />

O<strong>the</strong>r<br />

Molten salt<br />

Steam turb<strong>in</strong>e<br />

Receptor<br />

Mirrors<br />

Structures<br />

O<strong>the</strong>r<br />

Module<br />

Cell<br />

Polysilicon<br />

Integrated<br />

module<br />

manufactur<strong>in</strong>g<br />

Integrated<br />

module<br />

manufactur<strong>in</strong>g<br />

O<strong>the</strong>r<br />

Nacelle hous<strong>in</strong>g<br />

Generator<br />

Gearbox<br />

Rotor<br />

blades<br />

Tower<br />

O<strong>the</strong>r<br />

Condenser<br />

Pre-heater<br />

Cool<strong>in</strong>g tower<br />

Turb<strong>in</strong>e<br />

EPC<br />

O<strong>the</strong>r<br />

Fuel & ash handl<strong>in</strong>g<br />

Turb<strong>in</strong>e & generator<br />

Air pollution control<br />

Boiler<br />

Rest of<br />

manufactur<strong>in</strong>g<br />

EPC<br />

EPC<br />

EPC<br />

EPC<br />

EPC<br />

EPC<br />

O&M<br />

O&M<br />

EPC<br />

O&M<br />

O&M<br />

O&M<br />

O&M O&M O&M<br />

CSP Trough CSP Tower Silicon PV Th<strong>in</strong> Film PV HCPV W<strong>in</strong>d Geo<strong>the</strong>rmal Waste-toenergy<br />

14


Recommended Key Activities for Core Localization<br />

Total <strong>in</strong>vestment breakdown: Manufactur<strong>in</strong>g, EPC and O&M per sub-technology<br />

% total capex and opex throughout <strong>the</strong> plant lifetime<br />

O<strong>the</strong>r<br />

Molten<br />

HTF salt<br />

Steam generator<br />

Turb<strong>in</strong>e<br />

Structures<br />

Absorber<br />

Mirrors<br />

O<strong>the</strong>r<br />

Molten<br />

salt<br />

Steam turb<strong>in</strong>e<br />

Receptor<br />

Mirrors<br />

Structures<br />

O<strong>the</strong>r<br />

Module<br />

Cell<br />

Polysilicon<br />

Integrated<br />

module<br />

manufactur<strong>in</strong>g<br />

Integrated<br />

module<br />

manufactur<strong>in</strong>g<br />

O<strong>the</strong>r<br />

Nacelle hous<strong>in</strong>g<br />

Generator<br />

Gearbox<br />

Rotor<br />

blades<br />

Tower<br />

Condense O<strong>the</strong>r<br />

r<br />

Pre-heater<br />

Cool<strong>in</strong>g tower<br />

Turb<strong>in</strong>e<br />

EPC<br />

O<strong>the</strong>r<br />

Turb<strong>in</strong>e & generator<br />

Fuel & ash handl<strong>in</strong>g<br />

Air pollution<br />

control<br />

Boiler<br />

Rest of<br />

manufactur<strong>in</strong>g<br />

EPC<br />

EPC<br />

EPC<br />

EPC<br />

EPC<br />

EPC<br />

O&M<br />

O&M<br />

O&M<br />

EPC<br />

O&M<br />

O&M<br />

O&M O&M O&M<br />

CSP Trough CSP Tower Silicon PV Th<strong>in</strong> Film PV HCPV W<strong>in</strong>d Geo<strong>the</strong>rmal Waste-toenergy<br />

Core Localization<br />

Localization not considered for <strong>in</strong>dustrial impact<br />

15


<strong>Value</strong> <strong>Cha<strong>in</strong></strong> Development – Scop<strong>in</strong>g of Major <strong>Solar</strong><br />

Investment Categories<br />

CSP Technology Elements<br />

CSP Technology Elements<br />

PV Technology<br />

1 Trough • Collector<br />

2 Tower • Heliostat<br />

3 Th<strong>in</strong> Film<br />

• Mirror<br />

• Mirror<br />

• Absorber<br />

• EPC & O&M<br />

• EPC & O&M<br />

• Receiver<br />

• Molten Salts<br />

• Molten Salts<br />

• HTF<br />

• Steam turb<strong>in</strong>e and<br />

• Steam turb<strong>in</strong>e and<br />

generator<br />

4 HCPV<br />

generator<br />

• Storage tank<br />

• Storage Tank<br />

• O<strong>the</strong>r power block<br />

• O<strong>the</strong>r power block<br />

elements<br />

elements<br />

• M<strong>in</strong>or elements<br />

• M<strong>in</strong>or elements<br />

Elements<br />

• Integrated Module Factory<br />

• EPC & O&M<br />

• Inverter<br />

• Rest of balance of system<br />

• Integrated Module Factory<br />

• Track<strong>in</strong>g System<br />

• EPC & O&M<br />

• Inverter<br />

• Rest of balance of system<br />

Attractiveness<br />

▪ Economic: Opportunity size, marg<strong>in</strong>, growth<br />

▪ Strategic: Job creation potential, availability of raw<br />

material, importance to KSA<br />

Feasibility<br />

▪ Industry dynamics: Structure, maturity, barriers to entry<br />

▪ Key success factors: Technology and R&D capability,<br />

talent availability, manufactur<strong>in</strong>g capability<br />

Attractiveness<br />

High<br />

Low<br />

Low<br />

5 Silicon<br />

High<br />

Feasibility<br />

• EPC & O&M<br />

• Poly Silicon manufactur<strong>in</strong>g<br />

• Inverter<br />

• Wafer<br />

• Cell<br />

• Module<br />

• Rest of balance of system<br />

16


Assessment Criteria of <strong>Solar</strong> <strong>Value</strong> <strong>Cha<strong>in</strong></strong> Components<br />

Criteria<br />

Dimensions<br />

Description<br />

Economic<br />

▪ Size<br />

▪ Marg<strong>in</strong><br />

▪ Annual revenue potential<br />

▪ Expected profit marg<strong>in</strong>s <strong>in</strong> %<br />

▪ Growth<br />

▪ Annual growth potential <strong>in</strong> %<br />

Attractiveness<br />

Strategic<br />

▪ Job creation potential<br />

▪ Availability of raw material<br />

▪ Strategic importance<br />

▪ # of domestic jobs that <strong>the</strong> opportunity can create<br />

▪ Ease of procur<strong>in</strong>g raw material e.g. locally available or<br />

global availability with no supply cha<strong>in</strong> bottlenecks<br />

▪ Alignment with KSA’s strategic objectives e.g. regional<br />

economic leadership<br />

Industry<br />

dynamics<br />

▪ Maturity level<br />

▪ Level of consolidation<br />

▪ # of years of existence of <strong>the</strong> <strong>in</strong>dustry<br />

▪ # of players contribut<strong>in</strong>g to majority of market share.<br />

Fragmented if many players (>6); consolidated if few (


<strong>Value</strong> <strong>Cha<strong>in</strong></strong> Development – Localization Potential Across<br />

<strong>the</strong> <strong>Solar</strong> <strong>Value</strong> <strong>Cha<strong>in</strong></strong><br />

Based on <strong>the</strong> outputs of quantitative and qualitative assessment <strong>the</strong><br />

activities were segmented <strong>in</strong>to three categories<br />

A<br />

B<br />

C<br />

Category<br />

Activities at <strong>the</strong><br />

Core of <strong>Solar</strong><br />

Industry<br />

Development<br />

Activities with<br />

localization<br />

potential but<br />

fac<strong>in</strong>g important<br />

challenges that<br />

may h<strong>in</strong>der <strong>the</strong>ir<br />

localization<br />

success<br />

Non strategic,<br />

non value added<br />

activities for <strong>the</strong><br />

country but with<br />

macro impact<br />

Classification criteria<br />

• Potential for worldwide KSA leadership (non mature<br />

<strong>in</strong>dustrial activities)<br />

• Critical components for technology evolution (cost<br />

reduction)<br />

• Relevant economic size<br />

• Leverage on legacy local <strong>in</strong>dustry<br />

• Logistics constra<strong>in</strong>ts to import (ma<strong>in</strong>ly <strong>in</strong> w<strong>in</strong>d)<br />

• Intellectual Capital or o<strong>the</strong>r assets not available <strong>in</strong> <strong>the</strong><br />

country<br />

• Decoupl<strong>in</strong>g with capacity program (time required to<br />

develop <strong>the</strong> <strong>in</strong>dustry)<br />

• Relevant economic size<br />

• Worldwide supply/demand trends<br />

• Global supply networks of <strong>in</strong>dustry leaders<br />

• Non structural <strong>in</strong>dustries for KSA, highly dependent on<br />

<strong>in</strong>ternal demand (<strong>in</strong>dustries to close when <strong>in</strong>ternal<br />

demand is covered, unless <strong>the</strong>re is a clear export<br />

orientation)<br />

• No potential for KSA leadership <strong>in</strong> <strong>the</strong> medium/long term<br />

• No lead<strong>in</strong>g edge differential elements vs. o<strong>the</strong>r countries<br />

Components<br />

• Curved mirrors<br />

• Absorber tube<br />

• Collector<br />

• Flat mirrors<br />

• Heliostat<br />

• Th<strong>in</strong> Film modules<br />

• HCPV modules<br />

• Receiver<br />

• Inverter<br />

• Track<strong>in</strong>g system<br />

• Wafer<br />

• Molten salts<br />

• HTF<br />

• Steam turb<strong>in</strong>e and<br />

generator<br />

• Storage tank<br />

• O<strong>the</strong>r power block<br />

elements<br />

• M<strong>in</strong>or elements<br />

• Rest of balance of<br />

system<br />

• Polysilicon<br />

• Cells<br />

• Modules<br />

• EPC activities<br />

• O&M activities<br />

• Generator<br />

• Power converter<br />

• Steam turb<strong>in</strong>e<br />

• Boiler<br />

• Heat exchanger<br />

• Condenser<br />

• Grate<br />

18


Classification Matrixes to Identify CSP Tower Components for<br />

Localization<br />

Rationale<br />

Activities at <strong>the</strong> Core of Renewable Industry<br />

Development<br />

Potential for<br />

Worldwide<br />

KSA<br />

leadership<br />

Critical<br />

Component for<br />

Technology<br />

Evolution<br />

Relevant<br />

Economic<br />

Size<br />

Leverage<br />

on Local<br />

Industry<br />

Logistics<br />

Constra<strong>in</strong>ts<br />

to Export<br />

Aspirational activities to develop<br />

locally but with important challenges<br />

ahead<br />

IC or O<strong>the</strong>r<br />

Assets not<br />

Available <strong>in</strong><br />

<strong>the</strong> Country<br />

Decoupli<br />

ng with<br />

Capacity<br />

Program<br />

Worldwide<br />

Supply vs.<br />

Demand<br />

trends<br />

Global Supply<br />

Network of<br />

Industry Leaders<br />

Non strategic value added<br />

activities for <strong>the</strong> country but<br />

with macro impact<br />

Non-Core<br />

RES<br />

Industry<br />

for KSA<br />

Limited<br />

Potential for<br />

Leadership<br />

Limited<br />

KSA<br />

Competitive<br />

Advantage<br />

Heliostat X X X X X<br />

Mirror X X X X X<br />

EPC &<br />

O&M<br />

X X X X<br />

Receiver X X X X<br />

Molten Salts X X X X<br />

Steam<br />

turb<strong>in</strong>e &<br />

Generator<br />

Storage<br />

Tank<br />

O<strong>the</strong>r<br />

Power<br />

Block<br />

M<strong>in</strong>or<br />

Elements<br />

X X X X X X<br />

X X X<br />

X X<br />

X X<br />

Selected Activities<br />

19


Classification Matrixes to Identify PV Silicon Components for<br />

Localization<br />

Activities at <strong>the</strong> Core of Renewable Industry<br />

Development<br />

Aspirational activities to develop<br />

locally but with important challenges<br />

ahead<br />

Non strategic value added<br />

activities for <strong>the</strong> country but<br />

with macro impact<br />

Rationale<br />

Potential for<br />

Worldwide<br />

KSA<br />

leadership<br />

Critical<br />

Component for<br />

Technology<br />

Evolution<br />

Relevant<br />

Economic<br />

Size<br />

Leverage<br />

on Local<br />

Industry<br />

Logistics<br />

Constra<strong>in</strong>ts<br />

to Export<br />

IC or O<strong>the</strong>r<br />

Assets not<br />

Available <strong>in</strong><br />

<strong>the</strong> Country<br />

Decoupli<br />

ng with<br />

Capacity<br />

Program<br />

Worldwide<br />

Supply vs.<br />

Demand<br />

trends<br />

Global Supply<br />

Network of<br />

Industry Leaders<br />

Non-Core<br />

RES<br />

Industry<br />

for KSA<br />

Limited<br />

Potential for<br />

Leadership<br />

Limited<br />

KSA<br />

Competitive<br />

Advantage<br />

EPC &<br />

O&M<br />

Poly Silicon<br />

Manufactur<strong>in</strong>g<br />

X X X<br />

X X X X X X X<br />

Inverter X X X X X<br />

Storage X X X X<br />

Wafer X X X X X X<br />

Cell X X X X X X X<br />

Module X X X X X X<br />

Rest of<br />

Balance of<br />

system<br />

X X X<br />

Selected Activities<br />

20


<strong>Value</strong> <strong>Cha<strong>in</strong></strong> Development – Localization Potential Across<br />

<strong>the</strong> Renewable <strong>Value</strong> <strong>Cha<strong>in</strong></strong><br />

Activities selected for core localization account for 78% of total renewable spend<strong>in</strong>g<br />

program until 2030: 56% from services and 22% from manufactur<strong>in</strong>g<br />

O<strong>the</strong>rs<br />

22%<br />

Activities selected for core localization<br />

Services<br />

O&M<br />

19%<br />

EPC<br />

37%<br />

Manufactur<strong>in</strong>g<br />

22%<br />

21


Potential New Applications to Expand <strong>Solar</strong> <strong>Value</strong> <strong>Cha<strong>in</strong></strong><br />

Description<br />

Technology<br />

Desal<strong>in</strong>ation<br />

▪ Us<strong>in</strong>g electricity and excess heat<br />

from CSP plant for desal<strong>in</strong>ation<br />

▪ PV, CVP, UHCPV, CSP<br />

Industrial<br />

steam<br />

▪ Us<strong>in</strong>g solar heat<strong>in</strong>g to replace<br />

steam boilers for <strong>in</strong>dustrial uses<br />

▪ CSP<br />

Cogeneration<br />

<br />

▪ Hybridization of exist<strong>in</strong>g plants,<br />

us<strong>in</strong>g CSP heat to replace fossil<br />

fuel<br />

▪ CSP<br />

Steam<br />

enhanced<br />

oil recovery<br />

▪ Us<strong>in</strong>g CSP to generate steam for<br />

EOR<br />

▪ CSP<br />

District<br />

cool<strong>in</strong>g<br />

<br />

▪ Us<strong>in</strong>g solar energy to provide<br />

cool<strong>in</strong>g capacity for districts and<br />

complexes<br />

▪ PV, CSP<br />

<strong>Solar</strong> cool<strong>in</strong>g<br />

▪ Us<strong>in</strong>g solar energy <strong>in</strong><br />

absorption/adsorption cool<strong>in</strong>g<br />

▪ PV, CSP<br />

22


Implementation


Industrial Read<strong>in</strong>ess Assessment<br />

Local players scan<br />

Industrial read<strong>in</strong>ess<br />

evaluation criteria<br />

Description<br />

Skills/Knowledge<br />

Industrial assets<br />

<strong>Value</strong> cha<strong>in</strong> read<strong>in</strong>ess<br />

• Availability of skills and knowledge to<br />

supply nuclear or RES grade<br />

components/activities<br />

– Ownership of patents and/or certifications <strong>in</strong><br />

<strong>the</strong> <strong>in</strong>dustry<br />

– Length of experience <strong>in</strong> <strong>the</strong> <strong>in</strong>dustry<br />

– Exposure to global players<br />

– Partnerships or JVs with global players to<br />

allow technology transfer<br />

• Availability of <strong>in</strong>dustrial assets (e.g. plants,<br />

equipments) to supply <strong>the</strong><br />

components/activities<br />

– Scale/output of exist<strong>in</strong>g plants <strong>in</strong> KSA<br />

– Scope of products covered by <strong>the</strong> local<br />

players<br />

– Equipment sophistication compared to <strong>the</strong><br />

<strong>in</strong>dustry state of art<br />

• Maturity of <strong>the</strong> <strong>in</strong>dustrial value cha<strong>in</strong><br />

– Coverage of <strong>the</strong> <strong>in</strong>dustry value cha<strong>in</strong><br />

– Availability of raw materials<br />

– Existence of tra<strong>in</strong><strong>in</strong>g centers<br />

– After sale support<br />

– Supply cha<strong>in</strong> development<br />

24


Assessment of <strong>the</strong> Opportunity Ownership<br />

Opportunity<br />

Evaluation criteria<br />

Classification<br />

F<strong>in</strong>ancial attractiveness<br />

Strategic<br />

relevance<br />

F<strong>in</strong>ancial<br />

attractiveness<br />

+<br />

Private sector led<br />

F<strong>in</strong>ancially attractive<br />

and not strategic<br />

• Profit marg<strong>in</strong><br />

• Internal return rate<br />

• Capital <strong>in</strong>tensity<br />

• Payback period<br />

Strategic relevance<br />

• <strong>Value</strong> cha<strong>in</strong> <strong>in</strong>terdependency<br />

• Role of <strong>the</strong> opportunity <strong>in</strong> achiev<strong>in</strong>g<br />

self-reliance<br />

• Public safety concerns<br />

+<br />

Government led<br />

Highly strategic<br />

25


Segmentation of Opportunities<br />

Greenfield<br />

Immature KSA <strong>in</strong>dustrial base<br />

Brownfield<br />

Developed KSA <strong>in</strong>dustrial base<br />

1 2<br />

Private sector led<br />

F<strong>in</strong>ancially attractive<br />

and not strategic<br />

• Absorbers<br />

• EPC<br />

•O&M<br />

• Steel structures<br />

• Curved Mirrors<br />

• Flat mirrors<br />

• HCPV<br />

• Th<strong>in</strong> Film<br />

• W<strong>in</strong>d<br />

Towers<br />

• Polysilicon<br />

• Cells<br />

• Modules<br />

3<br />

4<br />

•R&D<br />

• Pilot test<strong>in</strong>g<br />

Government led<br />

Highly strategic<br />

26


Potential Bus<strong>in</strong>ess Models for Entry to <strong>the</strong> Industrial Sector<br />

LICENSING<br />

ACQUISITION<br />

JOINT VENTURE / (STAKE<br />

IN LOCAL) SUBSIDIARY<br />

Payment for <strong>the</strong> rights to locally<br />

manufacture/assemble an exist<strong>in</strong>g design<br />

for a specified number of units and period of<br />

time<br />

Immediate market entry<br />

Mature <strong>in</strong>dustrial <strong>in</strong>frastructure needs<br />

to be <strong>in</strong> place<br />

Licensee does not benefit from any<br />

transfer of know-how <strong>in</strong> design and<br />

eng<strong>in</strong>eer<strong>in</strong>g competencies<br />

International companies reluctant to<br />

license <strong>the</strong>ir latest technologies<br />

Level of attractiveness<br />

Acquisition of a <strong>in</strong>ternational company to<br />

have access to its latest technologies and<br />

ultimately setup own production facility <strong>in</strong><br />

KSA<br />

Immediate market entry with exist<strong>in</strong>g<br />

products and sales channels of<br />

acquisition target<br />

Market potential rema<strong>in</strong>s with KSA<br />

(depend<strong>in</strong>g on equity stake)<br />

High risk of failure (post-merger<br />

<strong>in</strong>tegration issues)<br />

Limited knowledge transfer<br />

Partnership with a foreign established<br />

company to manufacture/assemble <strong>the</strong><br />

latest exist<strong>in</strong>g technologies accord<strong>in</strong>g to<br />

local and regional needs<br />

Access to wide range of key competencies<br />

of partner<br />

Modification of proven and high-end designs<br />

to local/ regional needs<br />

Gradual transfer of knowledge <strong>in</strong><br />

design and eng<strong>in</strong>eer<strong>in</strong>g<br />

Partnership adds credibility <strong>in</strong> market<br />

Share market potential with partners<br />

27


<strong>Value</strong> <strong>Cha<strong>in</strong></strong> Activation Plan<br />

<strong>Value</strong> cha<strong>in</strong><br />

activation<br />

<strong>Value</strong> cha<strong>in</strong> enablers<br />

1 <strong>Value</strong> cha<strong>in</strong> 2 Independent 3 Industrial 4 SME 5 FDI<br />

6 Stakeholder 7<br />

organization quality<br />

read<strong>in</strong>ess<br />

development attractiveness engagement and<br />

capacity<br />

build<strong>in</strong>g<br />

assurance<br />

authority<br />

program (cost,<br />

quality, delivery)<br />

program and promotion communication<br />

Global 8<br />

vendor<br />

engagement<br />

&<br />

qualification<br />

Alignment<br />

with current<br />

and planned<br />

national<br />

<strong>in</strong>itiatives<br />

Step 1 Step 2 Step 3 Step 4 Step 5<br />

Capability<br />

gap<br />

assessment<br />

Identification &<br />

prioritization<br />

of preferred<br />

local suppliers<br />

9<br />

Read<strong>in</strong>ess<br />

action plan<br />

<strong>Value</strong> <strong>Cha<strong>in</strong></strong> Opportunities<br />

Action plan<br />

evaluation and<br />

validation<br />

Assist <strong>in</strong> JV/ partner<br />

selection<br />

Step 6 Step 7<br />

Monitor implementation<br />

Certification<br />

process<br />

assistance<br />

10 Regulatory 11 12 13 Leveraged 14 Feed-<strong>in</strong> tariff / 15<br />

environment<br />

procurement PPA<br />

Development<br />

of R&D<br />

centers and<br />

programs<br />

<strong>Value</strong> cha<strong>in</strong> <strong>in</strong>terfaces<br />

Development<br />

of local<br />

human<br />

capabilities<br />

Bid<br />

preparation<br />

16 Program<br />

and project<br />

structure<br />

28


<strong>Value</strong> <strong>Cha<strong>in</strong></strong> Detailed Implementation Plan<br />

Regulatory and mix-related<br />

aspects closed + non-b<strong>in</strong>d<strong>in</strong>g<br />

communication of targets and conditions<br />

<strong>Value</strong> <strong>Cha<strong>in</strong></strong><br />

enablers<br />

<strong>Value</strong><br />

<strong>Cha<strong>in</strong></strong><br />

opportunities<br />

<strong>Value</strong> cha<strong>in</strong><br />

<strong>in</strong>terfaces<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4<br />

Def<strong>in</strong>e <strong>the</strong> team<br />

mandate and objectives<br />

Setup <strong>the</strong> nuclear and Def<strong>in</strong>e nuclear<br />

RES certification body and RES standards<br />

Develop supplier awareness<br />

Screen local supplier base<br />

Develop an SME program<br />

Def<strong>in</strong>e and setup an FDI program<br />

Setup of sourc<strong>in</strong>g<br />

and procurement policies<br />

Def<strong>in</strong>ition of local<br />

content requirement<br />

Def<strong>in</strong>e <strong>the</strong> team<br />

organizational structure<br />

Bid<br />

preparation<br />

Def<strong>in</strong>e <strong>the</strong><br />

certification process<br />

Supplier 101<br />

Identify key stakeholders<br />

Def<strong>in</strong>e adequate engagement framework<br />

Demystify <strong>the</strong> KSA<br />

nuclear and RES programs<br />

Follow-up on previously<br />

Achieve a prequalification<br />

made commitments<br />

and early assessment of<br />

Facilitate <strong>the</strong> scan of <strong>the</strong><br />

potential vendors<br />

local supplier<br />

Implementa<br />

tion<br />

framework<br />

for VC<br />

dev.<br />

Capability gap<br />

assessment<br />

Identification and<br />

prioritization<br />

of local suppliers<br />

Regulatory and legal setup<br />

Local screen<strong>in</strong>g<br />

Detailed BP<br />

Phase 1<br />

tender<br />

process opened<br />

Quality standards<br />

and references def<strong>in</strong>ition<br />

Human capacity development strategy<br />

Feed-<strong>in</strong> tariff for phase I<br />

Potential partners<br />

screen<strong>in</strong>g<br />

Read<strong>in</strong>ess<br />

action plan<br />

Qualification<br />

& short<br />

list<strong>in</strong>g<br />

Contracts<br />

awarded<br />

Preparati<br />

on &<br />

issuance<br />

Bid<br />

evaluation<br />

Manage <strong>the</strong> certification process<br />

Perform on-go<strong>in</strong>g audits<br />

Facilitate match mak<strong>in</strong>g between local and global suppliers<br />

Identify <strong>the</strong> hidden players <strong>in</strong> <strong>the</strong> nuclear and RES value cha<strong>in</strong>s<br />

Encourage <strong>the</strong> <strong>in</strong>volvement of SMEs <strong>in</strong> <strong>the</strong> nuclear and RES value cha<strong>in</strong>s<br />

Execute stakeholder engagement program and ensure on-go<strong>in</strong>g alignment to avoid conflict of <strong>in</strong>terest<br />

Align procurement with <strong>the</strong> value cha<strong>in</strong> development<br />

Bid<br />

clarification<br />

negotiation<br />

& selection<br />

<strong>Value</strong> cha<strong>in</strong> development support<br />

Facilitate entry of foreign <strong>in</strong>vestors<br />

Promote local nuclear and RES value cha<strong>in</strong>s <strong>in</strong>vestments to foreign <strong>in</strong>vestors<br />

Action plan<br />

evaluation and<br />

validation<br />

Achieve general public/supplier acceptance<br />

Effective communication of program objectives<br />

8 On-go<strong>in</strong>g alignment with national <strong>in</strong>itiatives<br />

Capital structure<br />

and f<strong>in</strong>anc<strong>in</strong>g<br />

Regulatory RES Contract award RES Site<br />

Pilots<br />

commercial licens<strong>in</strong>g<br />

live<br />

Plants live<br />

Ensure and facilitate vendor’s <strong>in</strong>volvement <strong>in</strong> <strong>the</strong> value cha<strong>in</strong> development<br />

Assist <strong>in</strong> JV/ partner selection<br />

Licens<strong>in</strong>g and regulatory control<br />

Implementation monitor<strong>in</strong>g<br />

Vendor certification assistance<br />

On-go<strong>in</strong>g audits of components and services<br />

Transfer of know-how<br />

Public and private<br />

Development of R&D <strong>in</strong>itiatives<br />

<strong>in</strong>vestors Skills enhancement<br />

License to operate<br />

Setup university programs<br />

Develop local skills<br />

Setup vocational tra<strong>in</strong><strong>in</strong>g centers<br />

Feed-<strong>in</strong> tariff for Phases II (plus evaluation of <strong>the</strong> correct tim<strong>in</strong>g to<br />

switch <strong>in</strong>to bidd<strong>in</strong>g process)<br />

Setup of program and project ownership structure<br />

Construction start<br />

Feed-<strong>in</strong> tariff <strong>in</strong> place for first phase(s) <strong>in</strong> place – new capacity<br />

will be <strong>in</strong>stalled by bidd<strong>in</strong>g process<br />

High priority<br />

RES milestones<br />

Nuclear milestones<br />

29