Final report on link level and system level channel models - Winner
Final report on link level and system level channel models - Winner
Final report on link level and system level channel models - Winner
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
WINNER D5.4 v. 1.4<br />
where τ is the excess delay <strong>and</strong> b is a time c<strong>on</strong>stant. For the suburban LOS envir<strong>on</strong>ment the c<strong>on</strong>stant b is<br />
40 MHz.<br />
Figure 5.47: Power delay profile in the C1 (suburban) LOS envir<strong>on</strong>ment with fitting to exp<strong>on</strong>ential<br />
model.<br />
5.4.7.5 Scenario D1<br />
Power delay profiles for the rural envir<strong>on</strong>ment were investigated in 2004 <strong>and</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g>ed in [D5.3] for LOS<br />
propagati<strong>on</strong> c<strong>on</strong>diti<strong>on</strong>s. In our current campaign both LOS <strong>and</strong> NLOS c<strong>on</strong>diti<strong>on</strong>s were investigated. The<br />
results of the current campaign are shown in the figure Figure 5.48. The results in [D5.3] are comparable,<br />
but less detailed.<br />
Mean PDP profiles at 100 MHz b<strong>and</strong>width <strong>and</strong> 5.25 GHz centre-frequency in a rural envir<strong>on</strong>ment are<br />
shown in the following figures.<br />
Figure 5.48: PDP profile in LOS propagati<strong>on</strong> c<strong>on</strong>diti<strong>on</strong>s.<br />
Power delay profile for LOS c<strong>on</strong>diti<strong>on</strong>s has been fitted to two segments with an exp<strong>on</strong>ential functi<strong>on</strong><br />
P<br />
−bτ<br />
( τ ) e<br />
= (5.21)<br />
where τ is the excess delay <strong>and</strong> b is the time-c<strong>on</strong>stant. Here the c<strong>on</strong>stants b 1 is 220 MHz for the first<br />
segment <strong>and</strong> b 2 is 15.6 MHz for the sec<strong>on</strong>d <strong>on</strong>e.<br />
For the D1 rural NLOS c<strong>on</strong>diti<strong>on</strong>s the PDP has been investigated in the current measurement campaign.<br />
The measured PDP can be seen in the Figure 5.49 below with dual slope <strong>and</strong> single slope fitting.<br />
Page 90 (167)