Office of the Hura Panchayat Samity - Purulia Zilla Parisad
Office of the Hura Panchayat Samity - Purulia Zilla Parisad
Office of the Hura Panchayat Samity - Purulia Zilla Parisad
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Office</strong> <strong>of</strong> <strong>the</strong> <strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
P.O.- <strong>Hura</strong>, Dist.- <strong>Purulia</strong><br />
Phone No:- (03252) 240223, 240653<br />
E-mail: hura@nic.in<br />
Memo No:-373/XVII/9/HPS Dated: 23/08/2010<br />
Sealed tender are here by invited by <strong>the</strong> undersigned from <strong>the</strong> bonafide & experienced contractors,<br />
registered Co-operative Societies formed by Un employed Engineers & Labour Co-operatives having<br />
credential <strong>of</strong> similar type <strong>of</strong> work & <strong>the</strong>y have to abide by <strong>the</strong> following conditions :-<br />
1) a) Application for tender paper should be submitted to <strong>the</strong> undersigned during <strong>of</strong>fice<br />
hours up to 3.00 P.M. on 03/09/10 along with valid I. Tax/Pan Card, P. Tax, VAT (with challan <strong>of</strong><br />
last quarter return) & credential <strong>of</strong> 50% (Structural work), priority will be given on water<br />
structure work.) <strong>of</strong> tender amount (in <strong>the</strong> from <strong>of</strong> payment certificate & completion certificate<br />
<strong>of</strong> a single work) <strong>of</strong> <strong>the</strong> Engineer-In –Charge must be submitted in original & Photography<br />
<strong>the</strong>re<strong>of</strong>. Credential should in proper format (with due dedication Vat/ST, PT, IT, SD etc as per<br />
govt. norms).<br />
b) In case <strong>of</strong> running work, work order & up to date payment certificate <strong>of</strong> <strong>the</strong> Engineer-In<br />
–Charge must be produced above. The original documents will be returned after scrutiny & <strong>the</strong><br />
photocopy will be preserved by <strong>the</strong> undersigned. Payment certificate must be <strong>of</strong> last 4 years <strong>of</strong> a<br />
single work done by <strong>the</strong> contractor.<br />
c) Partnership deed & o<strong>the</strong>r relevant papers (in case <strong>of</strong> registered Firm company) should<br />
be produced at <strong>the</strong> time <strong>of</strong> application if required.<br />
2) Tender papers will be issued to <strong>the</strong> qualified contractor on 08/09/10 from 12.30 P.M. to<br />
3.00 P.M. The undersigned is not bound to issue tender papers to all <strong>the</strong> applicants. Decision <strong>of</strong><br />
<strong>the</strong> undersigned regarding issue <strong>of</strong> tender papers is final. The tender form may also be<br />
downloaded from <strong>the</strong> website <strong>of</strong> <strong>the</strong> <strong>Purulia</strong> <strong>Zilla</strong> Parishad (www.puruliazp.in) And <strong>the</strong> filled in<br />
tender form may be submitted under sealed cover to <strong>the</strong> undersigned by post or by courier<br />
service or by hand as may be deemed suitable. In case <strong>of</strong> tender form downloaded from website<br />
<strong>the</strong> cost <strong>of</strong> tender from shall be deposited by <strong>the</strong> intending tenderer by way <strong>of</strong> bank draft<br />
payable in favour <strong>of</strong> <strong>the</strong> undersigned.<br />
3) Tender paper should reach <strong>the</strong> under Signed within 12.30 P.M. on 10/09/10. Tender<br />
paper received after <strong>the</strong> schedule time & date will not be entertained. It will be opened on <strong>the</strong><br />
same date & fixed time at <strong>the</strong> <strong>of</strong>fice <strong>of</strong> <strong>the</strong> <strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong> at 2.00 P.M. The intending<br />
tenders may remain present at <strong>the</strong> time <strong>of</strong> opening.<br />
4) Time is <strong>the</strong> essence <strong>of</strong> contract. The successful contractor must complete <strong>the</strong> work<br />
within <strong>the</strong> time specified for completion. No. extension <strong>of</strong> time will be allowed except in special<br />
case. If any contractor fails to complete <strong>the</strong> work within <strong>the</strong> stipulated time <strong>the</strong> work order<br />
issued in his favour will be cancelled without assigning any reason <strong>the</strong>re <strong>of</strong>. The undersigned<br />
may also proceed to get <strong>the</strong> balance work completed by any o<strong>the</strong>r means including through<br />
o<strong>the</strong>r contractors. The excess expenditure, if any due to such a step would be recoverable from<br />
<strong>the</strong> unpaid bills/security deposit <strong>of</strong> <strong>the</strong> tender. This is apart from any o<strong>the</strong>r penal measure <strong>the</strong><br />
undersigned may take, including blacklisting <strong>of</strong> <strong>the</strong> contractors with forfeiture <strong>of</strong> earnest money.
5)<br />
The rate should be quoted in percentage both in figures as well as in words.<br />
6) Incomplete tender will be rejected summarily. The successful tenders will have to<br />
execute a formal agreement on a Non-Judicial stamp worth Rs. 10/= (ten) within 10 working<br />
days from <strong>the</strong> date <strong>of</strong> issue <strong>of</strong> acceptance letter.<br />
7) Audit report <strong>of</strong> last financial 02 years will have to be submitted in case <strong>of</strong> Engg. Coop. &<br />
Labour Co-op. societies. The tender forms are to be received by <strong>the</strong> Chairman or Secretaries or<br />
any member <strong>of</strong> <strong>the</strong> society having proper power <strong>of</strong> attorney. No tender form will be handed<br />
over to any outsider. Credential <strong>of</strong> similar type <strong>of</strong> works will have to be produced in case <strong>of</strong><br />
Engg. Co-op & Labour Co-operative.<br />
8) All works will have to be done according to specification & drawing approved by <strong>the</strong><br />
authority & as per direction <strong>of</strong> Executive <strong>Office</strong>r P.S.<br />
9) No consumable materials will be supplied to <strong>the</strong> agency for any work from <strong>the</strong> <strong>of</strong>fice <strong>of</strong><br />
<strong>the</strong> undersigned. Agency will be responsible for procuring all materials required for proper<br />
execution <strong>of</strong> work at his won cost.<br />
10) All rates shall be inclusive <strong>of</strong> all charges like royalty, toll charge, carriage etc.<br />
11) Before starting <strong>the</strong> work <strong>the</strong> work site must be dressed & cleared by cutting all sorts <strong>of</strong><br />
jungle, shrubs etc. For which no extra payment will be made.<br />
12) The contractors, who will not purchase <strong>the</strong> tender paper after qualifying, will not be<br />
allowed to participate in two consecutive tenders.<br />
13) The successful tenderer will have to start <strong>the</strong> work within seven days from <strong>the</strong> date <strong>of</strong><br />
issue <strong>of</strong> work order after Execution <strong>of</strong> formal agreement as per rule & will have to complete <strong>the</strong><br />
work within <strong>the</strong> time allowed for completion.<br />
14) Acceptance <strong>of</strong> <strong>the</strong> lowest tender is not obligatory & <strong>the</strong> undersigned reserves <strong>the</strong> right<br />
to accept or reject any or all tenders without assigning any reason what so ever & also to split<br />
up <strong>the</strong> tendered work to more than one contractor in <strong>the</strong> interest <strong>of</strong> scheme execution.<br />
15) Amalgamation <strong>of</strong> unemployed Engineers Co-operative & Labour Co- operative in any<br />
from should not be allowed towards cutting <strong>of</strong> eligibility in participation <strong>of</strong> tender.<br />
16) VAT/IT/Royalty/cess under BOCWACT at <strong>the</strong> prescribed rate will be deducted at source.<br />
17) This notice shall form part <strong>of</strong> terms & conditions <strong>of</strong> tender & tendered shall be Bound to<br />
abide <strong>the</strong>m.<br />
18) before submission <strong>of</strong> tender <strong>the</strong> contractor must visit <strong>the</strong> work site to judge <strong>the</strong> local<br />
condition from all corners & no plea/complain about <strong>the</strong> site will be entertained afterwards. It<br />
will be presumed that <strong>the</strong> agency <strong>of</strong>fered <strong>the</strong> tender after reviewing entire position <strong>of</strong> <strong>the</strong> work<br />
site.<br />
19) Separate tenders should be submitted in similar way for each work or group <strong>of</strong> work.<br />
20) All working tools & plants & implants required for <strong>the</strong> work are to be arranged &<br />
supplied by <strong>the</strong> successful tenderer, at his won cost.
21) The successful tenderer will have to abide by <strong>the</strong> provisions <strong>of</strong> West Bengal contract<br />
Labour (regulation & abolition) rules 1972 as will be in force from time to time. If no Labour<br />
license is obtained & produced by <strong>the</strong> contractor payment will liable to be with held.<br />
22) Claim for idle Labour from contractor will not be entertained under any circumstances.<br />
No claim will be entertained for any increase in Railway freight & market price.<br />
23) The tender received after <strong>the</strong> due date & time & any change in quotation after opening<br />
<strong>of</strong> <strong>the</strong> tender will be out rightly rejected. The department will not be responsible for <strong>the</strong> lost <strong>of</strong><br />
tender form or for <strong>the</strong> delay in <strong>the</strong> postal transit.<br />
24) Tenders will have to deposit <strong>the</strong> earnest money through Bank draft only in favour <strong>of</strong> <strong>the</strong><br />
undersigned.<br />
25) Accepted tenderers must receive Work Order/Supply Order within Seven days from <strong>the</strong><br />
dated <strong>of</strong> acceptance <strong>of</strong> tender failing which Work Order/Supply Order will be issued in favor <strong>of</strong><br />
2 nd lowest or as desired by <strong>the</strong> authority without assigning any reason.<br />
26) 1% Cess will be deducted from <strong>the</strong> bill to be paid to <strong>the</strong> contractors under <strong>the</strong> building &<br />
o<strong>the</strong>r construction works. Vide F.D. Order No. 853-F Dt.-01/02/2006.<br />
27) 8% Security Deposit money will be deducted in each bill & it should be paid to <strong>the</strong><br />
contractor after 6 month from completion <strong>of</strong> work with full satisfaction.<br />
28) Issuance <strong>of</strong> tender paper will rest upon <strong>the</strong> tender committee <strong>of</strong> this P.S.<br />
29) Details <strong>of</strong> <strong>the</strong> tender is enclosed here with in ANNEXURE.<br />
EXECUTIVE OFFICER<br />
HURA PANCHAYAT SAMITY
Sl<br />
No.<br />
1<br />
A N N E X U R E .<br />
OFFICE OF THE HURA PANCHAYAT SAMITY<br />
HURA :: PURULIA<br />
NIT NO : ……../ HPS DATED: 23/08/.2010<br />
Issued by- Executive <strong>Office</strong>r <strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
Name <strong>of</strong> <strong>the</strong> work<br />
Construction <strong>of</strong> 125 mm X 115 mm dia Rig Bored<br />
Tube-wells at different site under <strong>Hura</strong> <strong>Panchayat</strong><br />
<strong>Samity</strong>.<br />
IMPORTANT DATES<br />
Date & time <strong>of</strong> Application<br />
Date& time <strong>of</strong> issue <strong>of</strong> tender form<br />
Last Date& time <strong>of</strong> recived <strong>of</strong> tender form<br />
Date & time <strong>of</strong> Opening:<br />
Estimated<br />
Cost (Rs)<br />
37 nos X<br />
41250 =<br />
15,26,250<br />
Earnest<br />
money<br />
(Rs)<br />
Cost <strong>of</strong> tender form<br />
(Rs.)<br />
Time for<br />
completion<br />
30525.00 250.00 45 days<br />
DATE & TIME<br />
03.09.2010 upto 3:00PM<br />
08.09.2010 (12.30 pm to 3.00 pm)<br />
10.09.2010 upto 12.30 PM<br />
10.09.2010 at 2.00 PM<br />
All application in plain paper should be adress to Executive <strong>Office</strong>r, <strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong> toge<strong>the</strong>r with original<br />
and attested copies <strong>of</strong> ITC,STC,(VAT), PAN CARD,PTC and evidence <strong>of</strong> experiences (Credentials- 50% last 3 years)<br />
similarty pe <strong>of</strong> works.<br />
Executive <strong>Office</strong>r,<br />
<strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
Memo No :…….../XVII/9/HPS Date :- 23/08/.2010<br />
Copy forwarded for information with a request for wide publication to :-<br />
1) The District Magistrate,(District Planning Cell) <strong>Purulia</strong><br />
2) The Secretary, <strong>Purulia</strong> <strong>Zilla</strong> Parishad, <strong>Purulia</strong><br />
3) The Sub Divisional <strong>Office</strong>r, <strong>Purulia</strong> Sadar(E) Sub Division.<br />
4) The District Information <strong>Office</strong>r, <strong>Purulia</strong><br />
5) The Sabhapati, <strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
6) The Jt. Block Development <strong>Office</strong>r, <strong>Hura</strong> Development Block<br />
7) The Sahakari-Sabhapati, <strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
8) The Karmadhyakshyay, Purto, Karyo-O-Paribahan Sthayee <strong>Samity</strong>, <strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
9) The P.A & A.O, <strong>Hura</strong> Development Block<br />
10) The Post Master,<strong>Hura</strong> Post <strong>Office</strong>, <strong>Hura</strong>, <strong>Purulia</strong><br />
11-12) The S.A.E.(RWS),S.A.E.(BPC)<br />
13-15) The H.C/Cashier/<strong>of</strong>fice Notice Board<br />
16) The Editor "PURULIA DARPAN" for <strong>the</strong> print and publication
Cost <strong>of</strong> Tender Form Rs. 250/-<br />
A N N E X U R E .<br />
OFFICE OF THE HURA PANCHAYAT SAMITY<br />
HURA :: PURULIA<br />
NIT NO : ……../ HPS DATED: 23/08/2010<br />
Construction <strong>of</strong> 125 mm X 115 mm dia Rig Bored Tube-wells at different sites under <strong>Hura</strong><br />
<strong>Panchayat</strong> <strong>Samity</strong><br />
Sl<br />
No.<br />
1<br />
Description <strong>of</strong> Items<br />
Drilling a bore hole in DTH process through any Kinds <strong>of</strong><br />
Soil and rocks in over burden suitable for lowering and<br />
fitting fixing <strong>of</strong> 125 mm dia casing pipe upto an average<br />
depth <strong>of</strong> 15 mtrs. and subsequenthy 115 mm dia boring<br />
through any kind <strong>of</strong> rocky formation upto a total depth <strong>of</strong><br />
50 m including allo<strong>the</strong>r works necess ary for boring as<br />
per direction <strong>of</strong> EIC.<br />
Qty,<br />
Rate<br />
(Rs.)<br />
Unit<br />
Amount<br />
(Rs.)<br />
60.00 310.00 M 18600<br />
2<br />
Supply and delivery <strong>of</strong> 125 mm dia PVC casing pipe (minimum<br />
wall thickness 7 mm) having 3.0 m lengths each bo<strong>the</strong>nd<br />
threaded and one end socketed as per ISl standard<br />
15 421 M 6315<br />
3<br />
4<br />
Excavation <strong>of</strong> earth for construction <strong>of</strong> 1.45 m dia. Concrete<br />
platform (0.10 m th) over single layer brick flat soling (Plaster<br />
with neat Cement finish) with 20 mm down stone chips and<br />
average drain length <strong>of</strong> 1.50 m as practically feasible insite<br />
and fitting fixing <strong>of</strong> India Mark-II hand pump assembly<br />
including lowering <strong>of</strong> 32 mm dia G.I. riser pipe, Connecting<br />
rod etc. upto a depth <strong>of</strong> 24 m as per direction <strong>of</strong> EIC including<br />
carriage and all o<strong>the</strong>r charges necessary for execution <strong>of</strong><br />
works.<br />
N.B.:- Necessary Bricks<br />
Cement sand and stonechips (20 mm down) are to be<br />
supplied by <strong>the</strong> Agency and Construction <strong>of</strong> platform is to be<br />
done in 1:2:4 ratio<br />
Supply <strong>of</strong> India M-II hand Pump assembly, water tank,<br />
Pedestal, Cylinder(B.J.H)- All spare parts, Pipe-(Tata-Medium)<br />
and Connecting rod (B.J.H) etc.<br />
1 2570 NO 2570<br />
1 13765 NO 13765<br />
TOTAL 41250<br />
(Rupees Forty One Thousand Two Hundred Fifty Only)<br />
Executive <strong>Office</strong>r,<br />
SAE(RWS)<br />
<strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
<strong>Hura</strong> <strong>Panchayat</strong> <strong>Samity</strong><br />
Rates <strong>of</strong>fered by Contractor:-<br />
1) At Par.<br />
(2)……………..(Figure) % above (In words ……………………... ………………………………………………….) .<br />
(3) …………….. (Figure) % below (In words ……………………………... …………………………………………………) .<br />
Signature <strong>of</strong> Contractor