Sl.<br />

No<br />

Name of the Substations<br />

Voltage<br />

Rating<br />

in KV<br />

Type<br />

of <strong>SS</strong><br />

<strong>Budget</strong><br />

Cost of<br />

Route Ckt. Adm.<br />

Estimate<br />

Pr. Tr.<br />

Capacity Region EDC Length Length Approval<br />

Scheme<br />

Date<br />

<strong>2011</strong>-<strong>12</strong><br />

(Rs.in<br />

in km in km No.<br />

(Rs.in<br />

Lakhs)<br />

Lakhs)<br />

1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14<br />

8 PALAKKAPALAYAM 230/110 NEW 2X100 Erode Mettur 95 21.06.08 3728.7 PFC<br />

Funding<br />

a .LILO of 230 KV DC line K.R.Thoppur - Gobi feeder<br />

at Pallakapalayam<br />

b .LILO of 110 KV Barrage-IV to Sankari feeder at<br />

Pallakapalayam.<br />

c. LILO of 110 KV Bhavani Kattalai Barrage-I to<br />

Sankari feederat Pallakapalayam.<br />

5.00 10.00<br />

4.00 8.00<br />

15.00 30.00<br />

9 VILLIPALALAYAM 110/22 NEW 1x10 Erode Namakkal 452 19.<strong>12</strong>.09 634.67 REC<br />

LILO of 110 KV Pugalur-Kabilarmalai at Villipalayam<br />

<strong>SS</strong><br />

6.00 <strong>12</strong>.00<br />

10 BARGUR 110/33-11 UG 1x16+ 2x10 Vellore Trivallam 6 24.01.11 1719.61<br />

Erection of 110 KV SC on DC towers with Panther<br />

conductor from Parimangalam 230 KV <strong>SS</strong> to the<br />

proposed Bargur <strong>SS</strong><br />

35.00 35.00<br />

TOTAL 107.30 164.60 <strong>12</strong>777.37 2838.7