GCC/SALEM<br />
Name of the Substations<br />
Voltage<br />
Rating<br />
in KV<br />
TRANSMI<strong>SS</strong>ION PROGRAMME <strong>2011</strong>-<strong>12</strong><br />
Type<br />
of <strong>SS</strong><br />
SCHEMES CARRIED OVER FROM 2010-11 AND WILL BE COMPLETED IN 11-<strong>12</strong><br />
<strong>Budget</strong><br />
Cost of<br />
Route Ckt. Adm.<br />
Estimate<br />
Pr. Tr.<br />
Capacity Region EDC Length Length Approval<br />
Scheme<br />
Date<br />
<strong>2011</strong>-<strong>12</strong><br />
(Rs.in<br />
in km in km No.<br />
(Rs.in<br />
Lakhs)<br />
Lakhs)<br />
Funding<br />
1 PUTHIRAKOUNDAMPALAYAM 110/22 NEW 2x10 Erode Salem 103 08.07.03 798.84 600.00<br />
LILO of Salem -Deviakurichi at proposed <strong>SS</strong> 2.36 4.72<br />
2 THORAPADI 110/11 NEW 2X16 Vellore Vellore 81 19.06.10 650.27 550.00 R-APDRP<br />
LILO of existing 110 KV Vellore - Sathumadurai<br />
feeder<br />
0.5 1.00<br />
3 IVELY 110/22 NEW 2X16 Erode Mettur 195 08.08.05 654.38 569.49 PFC<br />
LILO of 110 KV K.R.Thoppur - Sankari line at Ively<br />
5.00 10.00<br />
<strong>SS</strong><br />
4 PAPPIREDDYPATTI 110/33-11 UG 1x10+2x16 Vellore Darmapuri 216 21.05.08 1016.99 800.00 PFC<br />
110 KV SC line on DC tower by tapping in the<br />
existing 110 KV Singarapet - Karur - Ramayanahalli<br />
feeder.<br />
15.00 15.00<br />
SCHEMES THAT WILL BE TAKEN UP IN <strong>2011</strong>-<strong>12</strong> AND COMPLETED IN <strong>2011</strong>-<strong>12</strong><br />
5 NAGARASAMPATTY 33/11 NEW 2x8 VLR Darmapuri 4 07.01.06 98.67 98.67 PFC<br />
6 MAHARAJAKADAI 33/11 NEW 1x8 VLR Darmapuri 67 02.03.11 220.54 220.54<br />
SCHEMES THAT WILL BE TAKEN UP IN <strong>2011</strong>-<strong>12</strong> AND COMPLETED IN 20<strong>12</strong>-13<br />
7 SINGAPURAM 230/110 NEW 2x100 ERD Salem 145 29.10.10 3254.7<br />
a. Erection of 230 KV DC line on DC towers with<br />
Zebra conductor making LILO of 230 KV K.R.<br />
Thoppur - Deviakurchi line at the proposed <strong>SS</strong><br />
8.00 16.00<br />
b. Erection of 110 KV DC line on DC towers with<br />
Panther conductor making LILO of 110 KV Salem -<br />
Deviakurchi feeder I to proposed Singapuram<br />
230/110 KV<br />
c. Erection of 110 KV DC line on DC towers with<br />
Panther conductor making LILO of 110 KV Salem -<br />
Deviakurchi feeder II to proposed Singapuram<br />
230/110 KV<br />
d. Erection of 110 KV DC line on DC towers with<br />
Panther conductor from Thumbal 110 KV <strong>SS</strong> to<br />
proposed Singapuram 230/110 KV<br />
0.40 0.80<br />
0.40 0.80<br />
13.00 26.00
Sl.<br />
No<br />
Name of the Substations<br />
Voltage<br />
Rating<br />
in KV<br />
Type<br />
of <strong>SS</strong><br />
<strong>Budget</strong><br />
Cost of<br />
Route Ckt. Adm.<br />
Estimate<br />
Pr. Tr.<br />
Capacity Region EDC Length Length Approval<br />
Scheme<br />
Date<br />
<strong>2011</strong>-<strong>12</strong><br />
(Rs.in<br />
in km in km No.<br />
(Rs.in<br />
Lakhs)<br />
Lakhs)<br />
1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14<br />
8 PALAKKAPALAYAM 230/110 NEW 2X100 Erode Mettur 95 21.06.08 3728.7 PFC<br />
Funding<br />
a .LILO of 230 KV DC line K.R.Thoppur - Gobi feeder<br />
at Pallakapalayam<br />
b .LILO of 110 KV Barrage-IV to Sankari feeder at<br />
Pallakapalayam.<br />
c. LILO of 110 KV Bhavani Kattalai Barrage-I to<br />
Sankari feederat Pallakapalayam.<br />
5.00 10.00<br />
4.00 8.00<br />
15.00 30.00<br />
9 VILLIPALALAYAM 110/22 NEW 1x10 Erode Namakkal 452 19.<strong>12</strong>.09 634.67 REC<br />
LILO of 110 KV Pugalur-Kabilarmalai at Villipalayam<br />
<strong>SS</strong><br />
6.00 <strong>12</strong>.00<br />
10 BARGUR 110/33-11 UG 1x16+ 2x10 Vellore Trivallam 6 24.01.11 1719.61<br />
Erection of 110 KV SC on DC towers with Panther<br />
conductor from Parimangalam 230 KV <strong>SS</strong> to the<br />
proposed Bargur <strong>SS</strong><br />
35.00 35.00<br />
TOTAL 107.30 164.60 <strong>12</strong>777.37 2838.7