1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14<br />

GCC/SALEM<br />

Name of the Substations<br />

Voltage<br />

Rating<br />

in KV<br />

TRANSMI<strong>SS</strong>ION PROGRAMME <strong>2011</strong>-<strong>12</strong><br />

Type<br />

of <strong>SS</strong><br />

SCHEMES CARRIED OVER FROM 2010-11 AND WILL BE COMPLETED IN 11-<strong>12</strong><br />

<strong>Budget</strong><br />

Cost of<br />

Route Ckt. Adm.<br />

Estimate<br />

Pr. Tr.<br />

Capacity Region EDC Length Length Approval<br />

Scheme<br />

Date<br />

<strong>2011</strong>-<strong>12</strong><br />

(Rs.in<br />

in km in km No.<br />

(Rs.in<br />

Lakhs)<br />

Lakhs)<br />

Funding<br />

1 PUTHIRAKOUNDAMPALAYAM 110/22 NEW 2x10 Erode Salem 103 08.07.03 798.84 600.00<br />

LILO of Salem -Deviakurichi at proposed <strong>SS</strong> 2.36 4.72<br />

2 THORAPADI 110/11 NEW 2X16 Vellore Vellore 81 19.06.10 650.27 550.00 R-APDRP<br />

LILO of existing 110 KV Vellore - Sathumadurai<br />

feeder<br />

0.5 1.00<br />

3 IVELY 110/22 NEW 2X16 Erode Mettur 195 08.08.05 654.38 569.49 PFC<br />

LILO of 110 KV K.R.Thoppur - Sankari line at Ively<br />

5.00 10.00<br />

<strong>SS</strong><br />

4 PAPPIREDDYPATTI 110/33-11 UG 1x10+2x16 Vellore Darmapuri 216 21.05.08 1016.99 800.00 PFC<br />

110 KV SC line on DC tower by tapping in the<br />

existing 110 KV Singarapet - Karur - Ramayanahalli<br />

feeder.<br />

15.00 15.00<br />

SCHEMES THAT WILL BE TAKEN UP IN <strong>2011</strong>-<strong>12</strong> AND COMPLETED IN <strong>2011</strong>-<strong>12</strong><br />

5 NAGARASAMPATTY 33/11 NEW 2x8 VLR Darmapuri 4 07.01.06 98.67 98.67 PFC<br />

6 MAHARAJAKADAI 33/11 NEW 1x8 VLR Darmapuri 67 02.03.11 220.54 220.54<br />

SCHEMES THAT WILL BE TAKEN UP IN <strong>2011</strong>-<strong>12</strong> AND COMPLETED IN 20<strong>12</strong>-13<br />

7 SINGAPURAM 230/110 NEW 2x100 ERD Salem 145 29.10.10 3254.7<br />

a. Erection of 230 KV DC line on DC towers with<br />

Zebra conductor making LILO of 230 KV K.R.<br />

Thoppur - Deviakurchi line at the proposed <strong>SS</strong><br />

8.00 16.00<br />

b. Erection of 110 KV DC line on DC towers with<br />

Panther conductor making LILO of 110 KV Salem -<br />

Deviakurchi feeder I to proposed Singapuram<br />

230/110 KV<br />

c. Erection of 110 KV DC line on DC towers with<br />

Panther conductor making LILO of 110 KV Salem -<br />

Deviakurchi feeder II to proposed Singapuram<br />

230/110 KV<br />

d. Erection of 110 KV DC line on DC towers with<br />

Panther conductor from Thumbal 110 KV <strong>SS</strong> to<br />

proposed Singapuram 230/110 KV<br />

0.40 0.80<br />

0.40 0.80<br />

13.00 26.00


Sl.<br />

No<br />

Name of the Substations<br />

Voltage<br />

Rating<br />

in KV<br />

Type<br />

of <strong>SS</strong><br />

<strong>Budget</strong><br />

Cost of<br />

Route Ckt. Adm.<br />

Estimate<br />

Pr. Tr.<br />

Capacity Region EDC Length Length Approval<br />

Scheme<br />

Date<br />

<strong>2011</strong>-<strong>12</strong><br />

(Rs.in<br />

in km in km No.<br />

(Rs.in<br />

Lakhs)<br />

Lakhs)<br />

1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14<br />

8 PALAKKAPALAYAM 230/110 NEW 2X100 Erode Mettur 95 21.06.08 3728.7 PFC<br />

Funding<br />

a .LILO of 230 KV DC line K.R.Thoppur - Gobi feeder<br />

at Pallakapalayam<br />

b .LILO of 110 KV Barrage-IV to Sankari feeder at<br />

Pallakapalayam.<br />

c. LILO of 110 KV Bhavani Kattalai Barrage-I to<br />

Sankari feederat Pallakapalayam.<br />

5.00 10.00<br />

4.00 8.00<br />

15.00 30.00<br />

9 VILLIPALALAYAM 110/22 NEW 1x10 Erode Namakkal 452 19.<strong>12</strong>.09 634.67 REC<br />

LILO of 110 KV Pugalur-Kabilarmalai at Villipalayam<br />

<strong>SS</strong><br />

6.00 <strong>12</strong>.00<br />

10 BARGUR 110/33-11 UG 1x16+ 2x10 Vellore Trivallam 6 24.01.11 1719.61<br />

Erection of 110 KV SC on DC towers with Panther<br />

conductor from Parimangalam 230 KV <strong>SS</strong> to the<br />

proposed Bargur <strong>SS</strong><br />

35.00 35.00<br />

TOTAL 107.30 164.60 <strong>12</strong>777.37 2838.7