<strong>TAMIL</strong> <strong>NADU</strong> <strong>TRANSMISSION</strong> <strong>CORPORATION</strong> LIMITED<br />
From,<br />
To,<br />
K.Gnanadesikan I.A.S.,<br />
The Secretary,<br />
Chairman,<br />
Tamil Nadu Electricity<br />
144, Anna Salai, Regulatory Commission,<br />
Chennai – 600 002.<br />
19-A, Rukmani Lakshmipathy Salai,<br />
TIDCO Complex,<br />
Egmore, Chennai – 600 008<br />
Sir,<br />
Lr.NO. CFC/TANTRANSCO/AEE/F. case file/D.465/2013, dt.13.03.2013<br />
Sub: TANTRANSCO - Direction of Hon’ble TNERC to furnish certain<br />
details - Reg.<br />
Ref: TNERC Notice.No.TNERC/ DD(L)/F.RA.1/ dated 22.2.2013/D245.<br />
-@-@-@-<br />
Annexure.<br />
The details, as called for in the above reference, is enclosed in the<br />
Thanking you,<br />
Yours faithfully,<br />
Sd/-<br />
Chief Financial Controller/TANTRANSCO<br />
For Chairman<br />
Encl: As above.
ANNEXURE<br />
1. Total Allotted Transmission Capacity including Transmission Capacity<br />
allotted to TANGEDCO in MW:<br />
The details of Total Allotted<br />
below:<br />
Transmission Capacity are detailed as<br />
FY 2010-11 FY 2011-12 FY 2012-13<br />
16258 MW 17300 MW 19578 MW<br />
2. Allotted transmission Capacity to various LTOA customers including<br />
TANGEDCO<br />
(MW)<br />
Sl.No. Description FY 2010-11 FY 2011-12 FY 2012-13<br />
1 TANGEDCO 12847 13527 15707<br />
2. LTOA customers 3411 3773 3871<br />
2(a) Category wise allotted LTOA transmission capacity to the OA<br />
customers who are availing concessional transmission charges.<br />
(MW)<br />
Sl.No. Category FY 2010-11 FY 2011-12 FY 2012-13<br />
1 CPP 148 148 148<br />
2. Wind 3258 3620 3718<br />
3. Bio Mass 5 5 5<br />
3. Revenue from STOA Customers:<br />
Rs. in Crs.<br />
FY 2010-11<br />
(from 1.11.2010 to<br />
31.3.2011)<br />
FY 2011-12<br />
(Provisional)<br />
3.63 10.24
4. Revenue from captive OA customers who are charged on concessional<br />
basis or in energy terms.<br />
FY 2010-11<br />
(from 1.11.2010 to<br />
31.3.2011)<br />
FY 2011-12<br />
(Provisional)<br />
25.76 71.72<br />
Rs. in Crs.<br />
5. Breakup of concessional charges into transmission charge entitlement of<br />
TANTRANSCO, wheeling charge entitlement of TANGEDCO and allocation of<br />
T&D loss charge component to TANTRANSCO and TANGEDCO.<br />
The 5% Transmission & Wheeling charges were initially fixed by TNEB<br />
during the period 2001 and continued to be in existence upto 31.7.2012. In<br />
this connection, TANTRANSCO would like to submit that during the<br />
functioning of the erstwhile TNEB as a whole, the 5% transmission and<br />
wheeling charges including Transmission loss were being taken into a single<br />
head of account of TANGEDCO and continue the same. Under the<br />
circumstances, TANTRANSCO humbly request the Hon'ble Commission to<br />
regulate norms and formulae to apportion the quantum of transmission<br />
charges to TANTRANSCO & wheeling charges to TANGEDCO along with the<br />
losses to the respective entities.<br />
6. Revenue from other Business:<br />
Rs. in Crs.<br />
FY 2010-11<br />
(from 1.11.2010 to<br />
31.3.2011)<br />
FY 2011-12<br />
(Provisional)<br />
7.02 25.71<br />
7. Net generation of TANGEDCO connected to the Intra-state<br />
transmission system, long term contracted capacity from IPPs and share in the<br />
central sector station. - Statement enclosed.