<strong>TAMIL</strong> <strong>NADU</strong> <strong>TRANSMISSION</strong> <strong>CORPORATION</strong> LIMITED<br />

From,<br />

To,<br />

K.Gnanadesikan I.A.S.,<br />

The Secretary,<br />

Chairman,<br />

Tamil Nadu Electricity<br />

144, Anna Salai, Regulatory Commission,<br />

Chennai – 600 002.<br />

19-A, Rukmani Lakshmipathy Salai,<br />

TIDCO Complex,<br />

Egmore, Chennai – 600 008<br />

Sir,<br />

Lr.NO. CFC/TANTRANSCO/AEE/F. case file/D.465/2013, dt.13.03.2013<br />

Sub: TANTRANSCO - Direction of Hon’ble TNERC to furnish certain<br />

details - Reg.<br />

Ref: TNERC Notice.No.TNERC/ DD(L)/F.RA.1/ dated 22.2.2013/D245.<br />

-@-@-@-<br />

Annexure.<br />

The details, as called for in the above reference, is enclosed in the<br />

Thanking you,<br />

Yours faithfully,<br />

Sd/-<br />

Chief Financial Controller/TANTRANSCO<br />

For Chairman<br />

Encl: As above.


ANNEXURE<br />

1. Total Allotted Transmission Capacity including Transmission Capacity<br />

allotted to TANGEDCO in MW:<br />

The details of Total Allotted<br />

below:<br />

Transmission Capacity are detailed as<br />

FY 2010-11 FY 2011-12 FY 2012-13<br />

16258 MW 17300 MW 19578 MW<br />

2. Allotted transmission Capacity to various LTOA customers including<br />

TANGEDCO<br />

(MW)<br />

Sl.No. Description FY 2010-11 FY 2011-12 FY 2012-13<br />

1 TANGEDCO 12847 13527 15707<br />

2. LTOA customers 3411 3773 3871<br />

2(a) Category wise allotted LTOA transmission capacity to the OA<br />

customers who are availing concessional transmission charges.<br />

(MW)<br />

Sl.No. Category FY 2010-11 FY 2011-12 FY 2012-13<br />

1 CPP 148 148 148<br />

2. Wind 3258 3620 3718<br />

3. Bio Mass 5 5 5<br />

3. Revenue from STOA Customers:<br />

Rs. in Crs.<br />

FY 2010-11<br />

(from 1.11.2010 to<br />

31.3.2011)<br />

FY 2011-12<br />

(Provisional)<br />

3.63 10.24


4. Revenue from captive OA customers who are charged on concessional<br />

basis or in energy terms.<br />

FY 2010-11<br />

(from 1.11.2010 to<br />

31.3.2011)<br />

FY 2011-12<br />

(Provisional)<br />

25.76 71.72<br />

Rs. in Crs.<br />

5. Breakup of concessional charges into transmission charge entitlement of<br />

TANTRANSCO, wheeling charge entitlement of TANGEDCO and allocation of<br />

T&D loss charge component to TANTRANSCO and TANGEDCO.<br />

The 5% Transmission & Wheeling charges were initially fixed by TNEB<br />

during the period 2001 and continued to be in existence upto 31.7.2012. In<br />

this connection, TANTRANSCO would like to submit that during the<br />

functioning of the erstwhile TNEB as a whole, the 5% transmission and<br />

wheeling charges including Transmission loss were being taken into a single<br />

head of account of TANGEDCO and continue the same. Under the<br />

circumstances, TANTRANSCO humbly request the Hon'ble Commission to<br />

regulate norms and formulae to apportion the quantum of transmission<br />

charges to TANTRANSCO & wheeling charges to TANGEDCO along with the<br />

losses to the respective entities.<br />

6. Revenue from other Business:<br />

Rs. in Crs.<br />

FY 2010-11<br />

(from 1.11.2010 to<br />

31.3.2011)<br />

FY 2011-12<br />

(Provisional)<br />

7.02 25.71<br />

7. Net generation of TANGEDCO connected to the Intra-state<br />

transmission system, long term contracted capacity from IPPs and share in the<br />

central sector station. - Statement enclosed.